Unit of competency Outline

Date retreived
22/07/2026 3:51 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Co-ordinate and implement stock and chemical preparation system shutdown

Co-ordinate and implement stock and chemical preparation system shutdown

Unit of competency
National Code
FPPSPR5A
State Code
AYE33
TGA Status
Replaced
DTWD Status
Archived
Current Release Number
1.00
Current Release Date
01/12/2001
State Implementation and Classification
Approved Date
Field of Education
030101 - Manufacturing Engineering
Original Release Date
Nominal Hours
0
Description
Notes
Elements and Performance Criteria
No information
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

refining systems
blending system
proportioning system
broke system
dump chests
chemical/additive plants

water
stock
chemicals
additives
steam

refiners, pumps, valves, chests, agitators
pulpers, screens, cleaners, disc deckers
monitoring and alarm systems

enterprise policy, procedures and guidelines
OH&S and environmental regulatory requirements (state and commonwealth)
quality assurance requirements
Standard Operating Procedures (SOP)

Furnish specifications
Material Safety Data Sheets (MSDS)
Standard Operating Procedures (SOP)
Process and instrument diagrams

as per site agreement
operator maintenance schedules
maintenance systems

process control and monitoring equipment, input and extract data
Communication channels:
wet end operators
dry end operators
pulping operators
supervisors
service suppliers
machine operators
maintenance
management

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Identifies type of shutdown.
Interprets SOP for shutdown.
Plans and organises shutdown.
Identifies and responds to shutdown problems.
Solves problems associated with shutdown.
Communicates problems accurately.
Explains action required to protect people and property.
Explains emergency procedures.
Accesses and enters data in recording system.
Demonstrates that shutdown procedures are implemented effectively and efficiently.
Demonstrates that precautions are taken to protect people and property.
Demonstrates that information regarding shutdown is communicated accurately.
Works within OH&S, SOP, environmental and safe working requirements and practices.

Replaced By
State Code National Code Title Type
AUY47 FPPSPR330A Co-ordinate and implement stock preparation system shutdown Unit of competency
No information