Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Implement absolute signal blocking
Implement absolute signal blocking
Unit of competency
National Code
TLIL3082A
TLIL3082A
State Code
WG230
WG230
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
09/07/2013
Field of Education
039907 - Rail Operations
Original Release Date
09/07/2013
Nominal Hours
15
Description
This unit involves the skills and knowledge required to apply absolute signal blocking (ASB) protection for the infrastructure and work group on a rail network during rail work activities by utilising a signal system managed by a network control officer, in accordance with Access Provider, legislative and regulatory requirements. Licensing or certification requirements are not applicable to this unit.
Notes
Elements and Performance Criteria
1 Prepare for absolute signal blocking protection
- 1.1 Worksite protection plan is sourced and read for the terms of ASB protection
- 1.2 Network control officer is notified of intention to use ASB protection
- 1.3 Protection officer is advised of network control officer's decision
2 Apply absolute signal blocking protection
- 2.1 Permission to apply ASB is requested from network control officer
- 2.2 Permission to apply ASB is documented in accordance with Access Provider and/or organisational requirements
- 2.3 Protection officer is advised that ASB has been applied
3 Ending absolute signal blocking protection
- 3.1 Communication is maintained with the network control officer to confirm completion of work activity and track is safe for rail traffic
- 3.2 Permission to remove ASB protection is documented in accordance with Access Provider and/or organisational requirements
- 3.3 Network control officer is informed of completion of work
4 Manage unsafe situations or emergencies
- 4.1 Unsafe situations and/or emergencies are identified
- 4.2 Work group is instructed to move to a safe place
- 4.3 Appropriate action is taken to minimise risk and/or injury in accordance with workplace procedures
- 4.4 Emergencies and/or incidents are recorded and reported to relevant personnel in accordance with workplace procedures
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Worksites may include:
rail corridor
danger zone:
running line
parallel networks (adjacent access providers, shared corridor)
adjacent lines
sidings/yards
platforms/buildings
structures
Terminology will be:
as defined by the applicable track safeworking system and operating procedures
Work may occur:
by day or night, under varied weather conditions and situations
Safety assessments will be:
as defined within the workplace procedures
as defined in the safety assessment for work including:
view - line of sight
direction of approaching rail traffic
speed of approaching rail traffic
safe place
changed local conditions
Communications may include:
receiving and passing on verbal messages/information
reporting unsafe situations and responding to emergencies
general safety and emergency messages
Network control officer may be:
network controller
train controller
area controller
signaller
Communications equipment and systems may include:
radios
telephones/mobile phones
signage
Safety clothing and equipment may include:
high visibility clothing
protective footwear
hearing protection
Where applicable, worksite protection equipment may include:
warning devices, whistles and sirens
railway track signals
demarcation barriers
lights and flags
electronic devices
Information and documents may include:
workplace procedures, policies and work instructions
emergency plan
pre-work briefing
worksite protection plan
Characteristics of track worksite may include:
location
cuttings and embankments
speed and density of adjacent traffic
parallel networks (adjacent access providers, shared corridor)
electrified network
track circuits
level and pedestrian crossings
limits of worksite
visibility
work affecting track under the control of other access providers
multiple work activities
Worksite protection plans may include:
defining the limits of the worksite
identifying safe places
identifying level and pedestrian crossings
identifying fixed rail infrastructure including:
signals
overhead structures
bridges/tunnels
turn outs
minimum sighting distances
parallel lines
Worksites may include:
rail corridor
danger zone:
running line
parallel networks (adjacent access providers, shared corridor)
adjacent lines
sidings/yards
platforms/buildings
structures
Terminology will be:
as defined by the applicable track safeworking system and operating procedures
Work may occur:
by day or night, under varied weather conditions and situations
Safety assessments will be:
as defined within the workplace procedures
as defined in the safety assessment for work including:
view - line of sight
direction of approaching rail traffic
speed of approaching rail traffic
safe place
changed local conditions
Communications may include:
receiving and passing on verbal messages/information
reporting unsafe situations and responding to emergencies
general safety and emergency messages
Network control officer may be:
network controller
train controller
area controller
signaller
Communications equipment and systems may include:
radios
telephones/mobile phones
signage
Safety clothing and equipment may include:
high visibility clothing
protective footwear
hearing protection
Where applicable, worksite protection equipment may include:
warning devices, whistles and sirens
railway track signals
demarcation barriers
lights and flags
electronic devices
Information and documents may include:
workplace procedures, policies and work instructions
emergency plan
pre-work briefing
worksite protection plan
Characteristics of track worksite may include:
location
cuttings and embankments
speed and density of adjacent traffic
parallel networks (adjacent access providers, shared corridor)
electrified network
track circuits
level and pedestrian crossings
limits of worksite
visibility
work affecting track under the control of other access providers
multiple work activities
Worksite protection plans may include:
defining the limits of the worksite
identifying safe places
identifying level and pedestrian crossings
identifying fixed rail infrastructure including:
signals
overhead structures
bridges/tunnels
turn outs
minimum sighting distances
parallel lines
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:
the required knowledge and skills
relevant workplace rules and procedures
Assessment must include exercises which demonstrate competent performance of the following in a range of situations:
explaining and demonstrating how to implement site safety plan
requesting ASB protection from a network control officer
explaining how to end the use of ASB protection
Context of and specific resources for assessment
Performance is demonstrated consistently over a period of time and in a suitable range of contexts
Resources for assessment include:
a range of relevant exercises and/or other simulated practical and knowledge assessment, and/or
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through activities in an appropriately simulated environment, and
in an appropriate range of situations in the workplace
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:
the required knowledge and skills
relevant workplace rules and procedures
Assessment must include exercises which demonstrate competent performance of the following in a range of situations:
explaining and demonstrating how to implement site safety plan
requesting ASB protection from a network control officer
explaining how to end the use of ASB protection
Context of and specific resources for assessment
Performance is demonstrated consistently over a period of time and in a suitable range of contexts
Resources for assessment include:
a range of relevant exercises and/or other simulated practical and knowledge assessment, and/or
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through activities in an appropriately simulated environment, and
in an appropriate range of situations in the workplace
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D5211 | TLIL3069A | Implement track blocking protection | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVI69 | TLIL3082 | Implement absolute signal blocking | Unit of competency |