Unit of competency Outline
Date retreived
24/07/2026 1:45 AM AWST
24/07/2026 1:45 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Collect and set out basic surveying data
Collect and set out basic surveying data
Unit of competency
National Code
CPPSIS4009A
CPPSIS4009A
State Code
D1504
D1504
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
28/10/2008
Field of Education
031101 - Surveying
Original Release Date
28/10/2008
Nominal Hours
60
Description
This unit of competency specifies the outcomes required to collect and set out basic surveying data. It requires the ability to plan and execute the collection and set out operation, in a team environment, often in the lead role. Functions would be carried out under limited supervision and within organisational guidelines.
Notes
Elements and Performance Criteria
1Gather basic surveying data.
- 1.1 Equipment is operated according to manufacturer specifications and organisational guidelines.1.2 Data and attributes are collected according to the provided data collection plan.1.3 Any discrepancy between specifications and actual activities are identified, recorded and reported.1.4 Administrative and industry requirements for data collection are complied with and recorded.1.5 OHS requirements are adhered to.1.6 Skills and knowledge are updated to accommodate changes in equipment and operations.
2Finalise the collection process.
- 2.1 All required documentation is completed according to the organisational requirements.2.2 All data collection is completed according to organisational requirements.2.3 Measurements are validated and recorded according to the project specifications.
3Set out basic surveying data.
- 3.1 Basic engineering surveying data is set out according to data collection plans.3.2 Any discrepancies between the data collection plan and the actual activities are identified, recorded and reported to relevant personnel.
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE776 | CPPSIS4029A | Collect and set out basic surveying data | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D221 | CPP40207 | Certificate IV in Spatial Information Services | Qualification |
| D220 | CPP40107 | Certificate IV in Surveying | Qualification |
| W622 | CPP40109 | Certificate IV in Surveying | Qualification |