Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor and operate bulkwater transfer systems
Monitor and operate bulkwater transfer systems
Unit of competency
National Code
NWP258B
NWP258B
State Code
D1873
D1873
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
14/01/2009
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/01/2009
Nominal Hours
30
Description
This unit of competency describes the outcomes required to monitor and operate bulkwater transfer systems.
Notes
Elements and Performance Criteria
1Plan and prepare work.
- 1.1 Determine work requirements for operation and monitoring of bulkwater transfer systems are in line with specifications and instructions.
- 1.2 Perform site check to prevent damage to other utilities and the environment, according to legislative and organisational requirements.
- 1.3 Select and check equipment to meet safety requirements of task and site and select, fit and use personal protective equipment.
- 1.4 Identify pumping stations and follow correct operating procedures.
2Monitor system performance and usage.
- 2.1 Conduct routine monitoring programs according to organisational maintenance schedules.
- 2.2 Identify fluctuations in demand and system changes causing dirty water.
- 2.3 Collect, analyse and record data on system performance and usage according to organisational requirements.
- 2.4 Collect and record water samples according to organisational requirements.
3Regulate flow.
- 3.1 Monitor and adjust flow regulating systems to meet demand requirements, according to organisational procedures.
- 3.2 Regulate and divert flows to facilitate repair or emergency activities.
- 3.3 Conduct isolation and inspection of transfer systems.
4Regulate pressure.
- 4.1 Monitor and adjust pressure to meet optimum delivery performance, according to organisational procedures.
- 4.2 Investigate and report pressure fluctuations according to organisational requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Work requirements may include:
work site boundaries
extent and scope of work
risk assessment and preventative measures
utility location
Bulkwater transfer systems may include:
in-line pumping stations
high and low range pumps
incline meters
scour chambers and air valves
service reservoirs
pipes, including:
polyvinyl chloride (PVC)
polyethylene
mild steel cement lined
ductile iron cement lined
cast iron cement lined
asbestos cement
copper
glass reinforced piping
structures, including:
pumping stations
meter pits
person access chambers or pits
valve chambers
regulators
erosion barriers
head walls
thrust blocks
Legislative and organisational requirements may include:
relevant federal and state or territory legislation and regulations
codes of practice, associated standards and guidance material
documented organisational policies, manuals and induction programs
relevant community planning and development agreements, such as land care agreements
Equipment used may include:
hand and power tools
lifting equipment
metering equipment
sluices
control devices
on- and off-road vehicles
portable pumps
communication equipment
breathing apparatus
gas detection equipment
rescue equipment
appropriate personal protective equipment
Adjustment of flow regulation systems may include:
use of rating tables to determine:
release rates
valve positions
Regulation of the system will include operation of:
pumping systems, including:
centrifugal
submersible
positive displacement
valving systems, including:
sluice
gate
blade
non-return
electronic and manual controlling systems
service reservoirs
Pressure fluctuations may include:
high
low
outside acceptable limits
Work requirements may include:
work site boundaries
extent and scope of work
risk assessment and preventative measures
utility location
Bulkwater transfer systems may include:
in-line pumping stations
high and low range pumps
incline meters
scour chambers and air valves
service reservoirs
pipes, including:
polyvinyl chloride (PVC)
polyethylene
mild steel cement lined
ductile iron cement lined
cast iron cement lined
asbestos cement
copper
glass reinforced piping
structures, including:
pumping stations
meter pits
person access chambers or pits
valve chambers
regulators
erosion barriers
head walls
thrust blocks
Legislative and organisational requirements may include:
relevant federal and state or territory legislation and regulations
codes of practice, associated standards and guidance material
documented organisational policies, manuals and induction programs
relevant community planning and development agreements, such as land care agreements
Equipment used may include:
hand and power tools
lifting equipment
metering equipment
sluices
control devices
on- and off-road vehicles
portable pumps
communication equipment
breathing apparatus
gas detection equipment
rescue equipment
appropriate personal protective equipment
Adjustment of flow regulation systems may include:
use of rating tables to determine:
release rates
valve positions
Regulation of the system will include operation of:
pumping systems, including:
centrifugal
submersible
positive displacement
valving systems, including:
sluice
gate
blade
non-return
electronic and manual controlling systems
service reservoirs
Pressure fluctuations may include:
high
low
outside acceptable limits
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to monitor and operate bulkwater transfer systems by:
planning and preparing for work
monitoring transfer system performance
collecting and recording data
regulating water flow
regulating water pressure
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to monitor and operate bulkwater transfer systems by:
planning and preparing for work
monitoring transfer system performance
collecting and recording data
regulating water flow
regulating water pressure
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| M1882 | NWP258A | Monitor and operate bulkwater transfer systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVY60 | NWPNET043 | Monitor and operate bulkwater transfer systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D244 | NWP20107 | Certificate II in Water Operations | Qualification |