Unit of competency Outline
Date retreived
23/07/2026 5:00 AM AWST
23/07/2026 5:00 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Inspect conduit and report on condition and features
Inspect conduit and report on condition and features
Unit of competency
National Code
NWP331B
NWP331B
State Code
D1909
D1909
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
29/05/2014
Nominal Hours
40
Description
This unit of competency describes the outcomes required to plan, prepare and conduct an inspection of gravity sewer or stormwater conduits, using specialised CCTV camera and transport systems, and reporting on observed defects and other features of the conduit in accordance with the industry code and job specifications. The ability to interpret technical information, identify and assess hazards, operate and maintain specialised technical equipment and produce computer generated reports on the condition and features of the conduit inspected are essential to performance.
Notes
Elements and Performance Criteria
1 Plan and prepare for conduit inspection.
- 1.1 Identify the purpose of the inspection and the location, size, type and extent of the conduit assets from relevant documentation.
- 1.2 Determine the inspection method and equipment to be used according to organisational and statutory requirements.
- 1.3 Conduct and document hazard identification and risk assessment and implement appropriate risk control processes.
- 1.4 Establish and implement asset isolation / flow management plans and inspection schedules in consultation with the system operator.
- 1.5 Arrange for preparation of the conduit and site for inspection as required.
2 Operate and maintain equipment.
- 2.1 Set up and calibrate equipment to suit the size, type and conditions of conduit according to relevant industry codes and/or specifications.
- 2.2 Operate equipment according to relevant industry codes and/or specifications and examine, record and report features of the conduit accurately.
- 2.3 Conduct routine maintenance of equipment in accordance with manufacturer's recommendations.
- 2.4 Diagnose and correct equipment malfunctions.
- 2.5 Recognise and appropriately respond to potential risks to equipment and/or system operation.
3 Identify and code defects and other features observed during conduit inspection.
- 3.1 Identify and code structural defects, service conditions and other features of the conduit according to relevant industry codes and/or specifications.
- 3.2 Record asset and inspection data using approved data capture software according to relevant industry codes and/or specifications.
- 3.3 Investigate and report unrecognisable defects, service conditions or other features.
- 3.4 Identify a conduit at risk of imminent failure and communicate details to the system operator or owner according to organisational and statutory requirements.
- 3.5 Identify and report defects or malfunctioning of access structures in accordance with industry codes and/or specifications.
4 Withdraw inspection equipment and reinstate system operation.
- 4.1 Clean and inspect equipment for damage during and after withdrawal from the conduit.
- 4.2 Reinstate system operation according to asset isolation / flow management plan and/or specifications.
- 4.3 Restore work site to meet organisational, safety, property owner's and environmental requirements.
5 Review, record and report work.
- 5.1 Check inspection data and video records prior to removal of equipment for completeness, quality and accuracy.
- 5.2 Compile conduit inspection reports and present to the client in the required format.
- 5.3 Complete job documentation and communication according to the asset owner or operator's, and statutory requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Conduit assets may include:
pipes, including those manufactured from:
vitrified clay (earthenware)
reinforced concrete
polyvinyl chloride (PVC)
polyethylene
polypropylene
unlined cast iron
cast iron cement lined
asbestos cement
ductile iron cement lined
glass reinforced plastic
mild steel cement lined
profiled thin gauge steel
other types of conduit, including:
concrete box culverts
circular or oviform brick
circular or oviform cast in situ concrete
circular, rectangular or variable cross section stone masonry block
lined pipes
other cross sections
asset structures, such as:
maintenance holes
maintenance shafts
drainage pits
Relevant documentation may include:
plans
GIS asset data on digital media
drawings
'house' service diagrams
specifications
work instructions
Equipment used may include:
specialised closed circuit television conduit inspection equipment and associated apparatus
hand-held still camera
computer hardware and software for data entry
hand and power tools
manhole cover lifters
lifting and winching equipment
mechanical excavation equipment
pneumatic and motorised equipment:
compressors
pneumatic spades and attachments
motorised cutting equipment
on- and off-road vehicles
road signage
portable pumps
sewer plugs - pneumatic, or other types
communication equipment
breathing apparatus
gas detection equipment
rescue equipment
appropriate personal protective equipment
Organisational and statutory requirements may include:
interpretation or assessment of:
specifications
instructions
codes
conduit size and configuration
access to conduit
sewerage or stormwater system operation
by-laws
organisational policies
standard operating procedures
communication and reporting protocols
environment protection
occupational health and safety, including the use of personal protective equipment
lifts and cranes
mines and subsidence
road signage
electrical
dangerous goods
Risk control processes include:
traffic control arrangements
grating or barricading of openings
asset isolation/flow control
compliance with confined space entry procedures
compliance with asset access procedures
personal protective equipment such as gloves
personal hygiene practices
Asset isolation / flow management plans may include:
arrangements with system operator or owner for:
shutting down, tagging and/or lockout of parts of the system, for example:
pumping stations
valves
reinstatement of operations
conducting inspections to coincide with low flow in the conduit
blocking off flow in a sewer and monitoring backup
blocking off flow and bypass pumping
Preparation of the conduit and site for inspection includes:
high pressure water jet cleaning to remove surface build-up on the wall of the conduit, roots and or debris
locating, exposing, removal and replacement of maintenance hole/pit covers or grates
arranging special access requirements, such as:
across private land
through gates
inside buildings
construction of platforms for above ground maintenance holes
Industry codes and/or specifications may include:
the Conduit Inspection reporting code of Australia WSA 05 2006
other codes as nominated by the asset owner, operator or regulator
contract specifications for work activity
Features of the conduit may include:
structural condition
service condition
Potential risks to equipment and/or system may include:
loss of camera or equipment due to the condition of the conduit
backup of sewage caused by camera or equipment and/or sudden changes in flow
Data recording may be conducted:
manually
using approved data capture software
Conduit evaluation reports may comprise:
videotapes
log sheets
asset information such as plans, maps, asset location, number, age and type
photographs
Conduit assets may include:
pipes, including those manufactured from:
vitrified clay (earthenware)
reinforced concrete
polyvinyl chloride (PVC)
polyethylene
polypropylene
unlined cast iron
cast iron cement lined
asbestos cement
ductile iron cement lined
glass reinforced plastic
mild steel cement lined
profiled thin gauge steel
other types of conduit, including:
concrete box culverts
circular or oviform brick
circular or oviform cast in situ concrete
circular, rectangular or variable cross section stone masonry block
lined pipes
other cross sections
asset structures, such as:
maintenance holes
maintenance shafts
drainage pits
Relevant documentation may include:
plans
GIS asset data on digital media
drawings
'house' service diagrams
specifications
work instructions
Equipment used may include:
specialised closed circuit television conduit inspection equipment and associated apparatus
hand-held still camera
computer hardware and software for data entry
hand and power tools
manhole cover lifters
lifting and winching equipment
mechanical excavation equipment
pneumatic and motorised equipment:
compressors
pneumatic spades and attachments
motorised cutting equipment
on- and off-road vehicles
road signage
portable pumps
sewer plugs - pneumatic, or other types
communication equipment
breathing apparatus
gas detection equipment
rescue equipment
appropriate personal protective equipment
Organisational and statutory requirements may include:
interpretation or assessment of:
specifications
instructions
codes
conduit size and configuration
access to conduit
sewerage or stormwater system operation
by-laws
organisational policies
standard operating procedures
communication and reporting protocols
environment protection
occupational health and safety, including the use of personal protective equipment
lifts and cranes
mines and subsidence
road signage
electrical
dangerous goods
Risk control processes include:
traffic control arrangements
grating or barricading of openings
asset isolation/flow control
compliance with confined space entry procedures
compliance with asset access procedures
personal protective equipment such as gloves
personal hygiene practices
Asset isolation / flow management plans may include:
arrangements with system operator or owner for:
shutting down, tagging and/or lockout of parts of the system, for example:
pumping stations
valves
reinstatement of operations
conducting inspections to coincide with low flow in the conduit
blocking off flow in a sewer and monitoring backup
blocking off flow and bypass pumping
Preparation of the conduit and site for inspection includes:
high pressure water jet cleaning to remove surface build-up on the wall of the conduit, roots and or debris
locating, exposing, removal and replacement of maintenance hole/pit covers or grates
arranging special access requirements, such as:
across private land
through gates
inside buildings
construction of platforms for above ground maintenance holes
Industry codes and/or specifications may include:
the Conduit Inspection reporting code of Australia WSA 05 2006
other codes as nominated by the asset owner, operator or regulator
contract specifications for work activity
Features of the conduit may include:
structural condition
service condition
Potential risks to equipment and/or system may include:
loss of camera or equipment due to the condition of the conduit
backup of sewage caused by camera or equipment and/or sudden changes in flow
Data recording may be conducted:
manually
using approved data capture software
Conduit evaluation reports may comprise:
videotapes
log sheets
asset information such as plans, maps, asset location, number, age and type
photographs
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to plan, prepare and conduct an inspection of gravity sewer or stormwater conduits including:
preparing for conduit inspection by:
identifying the location and extent of the work, methods to be applied, and equipment, including safety equipment, to be used
assessing risks and preparing for hazards
implementing appropriate isolation and inspection procedures
calibrating equipment for conduit inspection
operating and maintaining equipment
conducting inspections and identifying and coding conduit defects and condition
recording data manually, or using approved software program
investigating and recording anomalies
reporting conduit at risk of failure
removing equipment and reinstating system operation
restoring worksite
completing and processing inspection information according to organisational procedures
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence only taken at the point when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to plan, prepare and conduct an inspection of gravity sewer or stormwater conduits including:
preparing for conduit inspection by:
identifying the location and extent of the work, methods to be applied, and equipment, including safety equipment, to be used
assessing risks and preparing for hazards
implementing appropriate isolation and inspection procedures
calibrating equipment for conduit inspection
operating and maintaining equipment
conducting inspections and identifying and coding conduit defects and condition
recording data manually, or using approved software program
investigating and recording anomalies
reporting conduit at risk of failure
removing equipment and reinstating system operation
restoring worksite
completing and processing inspection information according to organisational procedures
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence only taken at the point when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| M1913 | NWP331A | Perform conduit condition evaluation | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVY75 | NWPNET016 | Inspect sewer or stormwater line | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J682 | RII31613 | Certificate III in Trenchless Technology | Qualification |
| D245 | NWP30107 | Certificate III in Water Operations | Qualification |