Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare for construction waterproofing process

Prepare for construction waterproofing process

Unit of competency
National Code
CPCCWP2003A
State Code
W9620
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
20/06/2014
Nominal Hours
80
Description
This unit of competency specifies the outcomes required to apply waterproofing to differing types of wet areas in varying building situations.It includes identification of the processes required and planning and preparation of materials for application.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Identify design concepts and processes.
  • 2.1. Plans and specifications are examined for work area identification, product description, performance requirements and design requirements.
  • 2.2. Work site is visited and work requirements are confirmed.
  • 2.3. Waterproof process is referenced and identified as conforming to regulations.
  • 2.4. Practices and principles of waterproof design for construction of wet areas are identified as conforming to codes and standards.
  • 2.5. Appropriateness of the system of waterproofing for the structure or work is determined in relation to structural elements.
  • 2.6. Potential for and consequences of water penetration and methods of water exclusion are identified and outlined.
  • 2.7. Method of waterproofing installation is identified.
  • 2.8. Identified waterproofing materials are confirmed for product suitability and conformity to codes and specification, and are compatible with substrate required finishes, installation technique and building schedule.
  • 2.9. Application of bond-breaker/fillet system forming part of the waterproofing installation is identified as fit for purpose.
  • 2.10. Potential faults, and contingencies and techniques to address them are identified.
3. Select and prepare materials.
  • 3.1. Waterproofing material is checked for conformity to specification and compatibility with substrate material and that the proposed application is in accordance with manufacturer specifications.
  • 3.2. Substrates to be waterproofed are prepared to manufacturer specification.
  • 3.3. Substrates are prime coated with waterproofing material in line with manufacturer specification.
  • 3.4. Flashings are prepared to job requirements and ready for placement and fixing to job specifications.
  • 3.5. Reinforcing material is set out and cut to requirements of area waterproofing junctions and surface requirements, in accordance with manufacturer specifications and job requirements.
  • 3.6. Waterproofing membrane is prepared for installation to wet area surface in accordance with job and manufacturer specifications.
  • 3.7. Waterproofing material is mixed or prepared for application to surface in accordance with manufacturer specifications and job requirements.
4. Clean up.
  • 4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 4.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to preparation for the waterproofing construction process
relevant Australian standards
safe work procedures relating to preparation for the waterproofing construction process
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment required to prepare for waterproofing:
include:
measuring tapes and rules
mixer and mixing apparatus
moisture meters
spirit levels
straight edges
may include:
brushes
cutting blades
dumpy, laser and water levels
evacuating equipment and pumps
fans
floodlights
rollers
scissors
vacuum cleaners.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials required to prepare for waterproofing include:
adhesives
primers
sheet:
bentonite composites
butanol
ethylene cop bitumen (ECB)
ethylene propylene diene monomer rubber (EPDM)
polyvinyl chloride (PVC)
waterproofing material or membrane for the application may be liquid applied:
acrylic
cementitious-based
injection
polyurethane.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Performance requirements include:
cost
detail relating to materials
provision of site access and facilities
quality assurance
quality and standards of work
standard procedures and practices
work schedules.
Design requirements include:
making an assessment of suitability for the construction process
selection and preparation of identified materials.
Work site visit permits liaison with others and the confirmation of details such as:
levels
measurements
moisture content
risk assessment
schedules
structure
substrates
termination requirements.
Waterproofing process may be applied:
below ground
externally
internally.
Wet areas include:
bathrooms
decks
en suites
food preparation areas
foundation works
kitchens
laundries
lift pits
patios
planter boxes
retaining walls
roofs
showers
slabs
stair wells.
Structural considerations include:
design principles
drainage requirements
environmental factors:
allowing water flow
slope, fall and grade of surfaces
water run-off and impact on adjoining property
hydrostatic pressures
substrate type and condition
waterproofing protection.
Considerations in water exclusion include:
capillary action
causes of water penetration:
leakage through wall and floor finishes
penetration at joints and junctions
movement from shrinkage
accumulated drainage
failure of or damage to waterproofing system corners and terminations
curing times of compounds and their applications
damp proof courses and flashings
direction of fall of substrate or decorative finish
hydrostatic pressure
impact of environmental conditions
joining
shelf life of waterproofing products
surface applications and protection requirements
use of bond-breakers
use of sealants
waste allowances
perimeter treatment, including:
pressure seals
over flashing
thermal shrinkage (expansion and contraction).
Waterproofing installation may be applied as:
a liquid
a sheet
injected material.
Substrates include:
aerated autoclaved concrete materials:
Hebel
Thermolite
blockwork
brickwork
cement render
ferrous and non-ferrous piping
fibrous cement sheeting
pre-cast concrete
PVC
reinforced in situ concrete
timber and timber-based products
wet area plasterboard.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum, given the plans and specifications of a waterproofing construction process:
read and interpret the plans to assess the specified product's suitability for the work
identify the structure and building process, building program and site constraints
plan the waterproofing process, identifying the materials and the tools and equipment specifically required for the selected process or membrane
confirm plans and specifications on site, including measurements and levels
interpret and apply MSDS and manufacturers' instructions and codes
prime the substrate and prepare for the application of the membrane, ensuring:
correct identification of requirement and preparation for the installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to preparing for waterproofing construction processes
hand and power tools, plant and equipment appropriate to preparing for waterproofing construction processes
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1931 BCGWP2003B Prepare for construction process (Waterproofing) Unit of competency
Replaced By
State Code National Code Title Type
OCM62 CPCCWP3005 Assess construction waterproofing processes Unit of competency