Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate a tower crane

Operate a tower crane

Unit of competency
National Code
CPCCBC4044A
State Code
W9281
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
20/06/2014
Nominal Hours
64
Description
This unit of competency specifies the outcomes required to operate a tower crane, including planning and preparing for work; conducting operational checks; safely and effectively operating the tower crane for a range of tasks, including lifting and moving loads; monitoring; and shutting down in accordance with designated Australian standards.
Notes
Elements and Performance Criteria
1. Plan and prepare for operation.
  • 1.1. Applicable safety (OHS), licensing, legislative and organisational requirements relevant to operating a tower crane are verified and complied with.
  • 1.2. Work order is reviewed, confirmed and clarified with appropriate personnel.
  • 1.3. Type of operations to be conducted with a tower crane are assessed and prepared.
  • 1.4. Equipment is selected appropriate to work requirements and checked for operational effectiveness in accordance with manufacturer recommendations.
  • 1.5. Tower crane operations are planned in accordance with site procedures and legislative requirements.
  • 1.6. Environmental protection measures are adhered to in accordance with environmental plans and regulations.
  • 1.7. Communication with others is established and maintained in accordance with OHS requirements.
2. Inspect and test tower crane.
  • 2.1. Tower crane is visually inspected prior to operation for any evidence of damage, structural weakness or interference according to pre-operational safety check procedures.
  • 2.2. Pre start-up checks are carried out on equipment in accordance with manufacturer recommendations and specifications.
  • 2.3. Tower crane controls and functions, including manoeuvrability, emergency functions, gear and accessories are checked for serviceability and any faults are rectified or reported.
  • 2.4. Tower functions are checked after start-up, and monitored throughout operation.
  • 2.5. Site hazards associated with tower crane operations are detected, risks assessed and safe operating techniques used to eliminate or control risks.
3. Operate tower crane.
  • 3.1. Barriers and signage are used to isolate the work area in accordance with safe work practices and load shifting requirements.
  • 3.2. Tower crane is operated to work instructions in accordance with company operating procedures and manufacturer specifications.
  • 3.3. Communication practices associated with lifting and moving loads are conducted in accordance with work site procedures and are confirmed between parties.
  • 3.4. Crane is climbed in accordance with manufacturer specifications and safety regulations.
  • 3.5. Start-up and shutdown procedures are performed in accordance with manufacturer specifications and site requirements.
  • 3.6. Weight of load is confirmed as being within the lifting capacity and operating radius of the crane.
  • 3.7. Lifting gear is selected, attached and used in accordance with working load limits and OHS legislation.
  • 3.8. Crane movements are checked for safe operation and load is prepared for lifting in accordance with crane, dogging and rigging requirements.
  • 3.9. Load is manoeuvred to position using the control systems to manufacturer specifications, continually monitored throughout its travel and tasks are completed effectively.
  • 3.10. Load is lifted and moved in accordance with agreed crane schedule and conventional hand and audible signals that meet OHS legislation and work site procedures.
  • 3.11. Load is constantly monitored to ensure safety to personnel, load and structural stability with monitoring systems and alarms immediately acted upon in accordance with site requirements.
4. Shut down tower crane.
  • 4.1. Tower crane is shut down using the correct sequence of procedures in accordance with manufacturer recommendations and specifications.
  • 4.2. Routine post-operational checks are carried out in accordance with manufacturer specifications.
  • 4.3. Tower crane operations and faults are recorded and reported to the appropriate personnel.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as disability are a factor
hazard control
hazardous materials and substances
housekeeping
organisational first aid
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
machines
man-made structures
obstructions
recently filled trenches
restricted access barriers
safe parking
security from unauthorised access or movement
signage and barricades
surrounding structures
traffic control
underground or overhead services
uneven or unstable surfaces or terrain
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Licensing includes:
relevant recognition, permit, licence or permission to operate within any state or territory issued by the government regulatory authority of that jurisdiction.
Organisational requirements include:
access and equity principles and practices
consultative processes
emergency and evacuation procedures
equipment maintenance and storage procedures
ethical standards
legal, organisational and site policy or guidelines
OHS policies
policies and procedures relating to own role and responsibility
procedures and programs
quality and continuous improvement processes and standards
quality assurance or procedures manuals
recording and reporting procedures.
Work order includes:
organisational work specifications and instructions issued by authorised personnel for the operation of a tower crane and its respective tasks.
Appropriate personnel includes:
client
colleague
manager
supervisor
supplier.
Tower crane:
includes:
a boom or jib crane mounted on a tower structure that is demountable or permanent and includes horizontal and luffing jib types
may include:
height and jib extension
ram luffers
rope luffers and hammerheads (trolley in and trolley out)
is generally pre-erected by riggers with use of mobile cranes.
Equipment:
includes:
lifting gear
tower cranes
workboxes and relevant maintenance equipment
may include:
emergency shutdown and stopping
extinguishing fires
organisational first aid requirements and evacuation
procedures for equipment lock-out to protect operators and co-workers from accidental injury by isolating the equipment
remote control devices (pendant control and radio control).
Legislative requirements include:
award and organisation agreements and relevant industrial arrangements
confidentiality and privacy requirements
environmental issues
equal opportunity
industrial relations and anti-discrimination
OHS issues
relevant industry codes of practice
relevant legislation from all levels of government that affect business operation.
Environmental protection measures include organisational and project requirements, including:
clean-up management
dust and noise
vibration
waste management.
Pre start-up checks ensure:
equipment has been set up correctly
gear is fitted accurately
plant is operating to optimum performance.
Hazards include:
buildings
chemicals
fires
goods and materials, including hazardous materials
movement of equipment
structures
traffic
underground or overhead services
uneven or unstable surface or terrain.
Barriers and signage include:
barrier tape or netting
fencing
temporary boundaries and specified safety signage.
Weight of load includes:
that prescribed by manufacturer as not exceeding the allowable capacity of the tower crane.
Lifting gear includes:
chains or slinging equipment
grabs.
Dogging includes:
provision of directional signals to the crane operator on the position and security of the load.
Rigging includes:
process of fitting and removing cables and spars to ensure structural stability and load capacity of tower cranes.
Tasks include operations, including:
attachments
boom up and boom down
luff movements
outriggers
slew left and right
telescope in and out
trolley in and trolley out
winch up and down in combination.
Records and reports include:
conclusions
costs
dangerous occurrences or equipment malfunctions using logbooks
difficulties or issues faced
environmental issues
hazards
incidents or injuries
pro formas
production reports
recommendations and maintenance records
recommendations for future work
results
tower crane operations and maintenance of equipment.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by providing evidence of safely and efficiently conducting tower crane operations according to organisational and regulatory requirements.
This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
comply with organisational and site policies and procedures, including quality requirements and state or territory legislation applicable to workplace operations
comply with OHS and environmental regulations, policies and procedures
communicate effectively and work safely with others in the work area
conduct risk assessment and management procedures
operate a tower crane, including all functions (including a multiple lift) to their maximum extension and travel in the lifting and moving of at least three differing load types and sizes to different locations on the site
conduct pre and post-operational checks of the tower crane.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials and equipment relevant to tower crane operations.
Specifications and work instructions. Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
No information