Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Manage a project using software management tools
Manage a project using software management tools
Unit of competency
National Code
ICAPRG502A
ICAPRG502A
State Code
D8017
D8017
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
08/11/2011
Field of Education
080315 - Project Management
Original Release Date
08/11/2011
Nominal Hours
60
Description
This unit describes the performance outcomes, skills and knowledge required to use software-management tools to manage a project from initiation to completion.
Notes
Elements and Performance Criteria
1. Identify software management tools
- 1.1 Determine software development methodology to be used for project development
- 1.2 Determine project-management software to be used to manage the development of the project
- 1.3 Determine source-control system to manage source code and handle conflicts
- 1.4 Determine collaboration software to be used in the project development
2. Implement software management tools
- 2.1 Create project plan according to software requirement specifications
- 2.2 Define source-control procedures
- 2.3 Create collaboration environment
3. Monitor use of software management tools
- 3.1 Monitor and adjust project plan accordingly to maintain progress according to the project plan
- 3.2 Ensure code is correctly entered into source control system
- 3.3 Monitor collaboration environment and resolve issues where required
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Software development methodology may include:
agile software development
joint applications design
prototyping
rapid application development
waterfall.
Project-management software may include:
dotProject
FastTrack Schedule
Microsoft Project
OpenProj
Oracle Project Portfolio Management
Teamwork.
Source-control system may include:
CVS
Microsoft Visual SourceSafe.
Collaboration software may include:
blogs
forums
Microsoft SharePoint
wikis
Zimbra.
Software development methodology may include:
agile software development
joint applications design
prototyping
rapid application development
waterfall.
Project-management software may include:
dotProject
FastTrack Schedule
Microsoft Project
OpenProj
Oracle Project Portfolio Management
Teamwork.
Source-control system may include:
CVS
Microsoft Visual SourceSafe.
Collaboration software may include:
blogs
forums
Microsoft SharePoint
wikis
Zimbra.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
use software-management tools to manage the development of a system to specification
prepare a project plan using project-management software
use source-control software to manage code
use collaboration tools.
Context of and specific resources for assessment
Assessment must ensure access to:
internet
project-management software
source-control software
specific tools and licences, depending on particular platform
appropriate learning and assessment support when required
modified equipment for people with special needs.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
review of candidate’s project plan
verbal or written questioning on knowledge of:
source-control methods
collaboration methods.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, where appropriate.
Assessment processes and techniques must be culturally appropriate, and suitable to the communication skill level, language, literacy and numeracy capacity of the candidate and the work being performed.
Indigenous people and other people from a non-English speaking background may need additional support.
In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
use software-management tools to manage the development of a system to specification
prepare a project plan using project-management software
use source-control software to manage code
use collaboration tools.
Context of and specific resources for assessment
Assessment must ensure access to:
internet
project-management software
source-control software
specific tools and licences, depending on particular platform
appropriate learning and assessment support when required
modified equipment for people with special needs.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
review of candidate’s project plan
verbal or written questioning on knowledge of:
source-control methods
collaboration methods.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, where appropriate.
Assessment processes and techniques must be culturally appropriate, and suitable to the communication skill level, language, literacy and numeracy capacity of the candidate and the work being performed.
Indigenous people and other people from a non-English speaking background may need additional support.
In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AUV75 | ICTPRG502 | Manage a project using software management tools | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D567 | ICA50111 | Diploma of Information Technology | Qualification |
| D573 | ICA50711 | Diploma of Software Development | Qualification |