Unit of competency Outline

Date retreived
23/07/2026 7:13 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Move cane bins in a marshalling yard

Move cane bins in a marshalling yard

Unit of competency
National Code
FDFSUG103A
State Code
WD828
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/05/2012
State Implementation and Classification
Approved Date
31/07/2014
Field of Education
039907 - Rail Operations
Original Release Date
31/07/2014
Nominal Hours
25
Description
This unit describes the outcomes required to move cane bins in mill storage and marshalling yards to ensure efficient cane supply operations. Empty and full yards may be a combined yard.
Notes
Elements and Performance Criteria
1 Prepare for work in a cane bin marshalling yard
  • 1.1 Personal protective clothing and equipment is selected and used
  • 1.2 Health and safety hazards / maintenance requirements are identified and reported to appropriate personnel according to workplace reporting procedures
2 Move full cane bins
  • 2.1 Continuity of cane supply to mill is managed to meet cut to crush sequence
  • 2.2 Cane bins are connected to the weighbridge system in accordance with workplace procedures
  • 2.3 Yard control systems are operated to potential
  • 2.4 Bins are un-coupled in accordance with OHS requirements and workplace procedures
3 Move empty cane bins
  • 3.1 Bin supply to empty yard is managed to meet traffic schedule requirements
  • 3.2 Bins are re-coupled/pinned in accordance with OHS
  • requirements and workplace procedures
  • 3.3 Yard control systems are operated to potential
4. Analyse and respond to unacceptable performance
  • 4.1 System operating conditions are monitored to identify causes of unacceptable performance
  • 4.2 Yard derailments are reported and rectified in accordance with workplace procedures
  • 4.3 Bins requiring repair are identified and removed to bin repair line
  • 4.4 System error messages are responded to and appropriate corrective action is taken
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Workplace information
Workplace information can include:
Standard Operating Procedures (SOPs) and
traffic schedules
manufacturer's specifications.
Information systems
Information systems may be print or screen based.
Equipment
Equipment may include:
2-way communication system
mimic or computer board
process control interface and
related control system.
Signalling devices
Signalling devices typically include:
colour aspect lights
mechanical signage.
Rakes
Movement of rakes may be:
automated
done using a dedicated loco, tractors or
using winch equipment.
Teamwork
Work may require the ability to work within a team environment
Communication methods
Communication methods include:
use of two-way radios used in accordance with workplace requirements and state authority protocols and
hand and audible signalling.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
monitor yard capacity to direct cane bins to appropriate yard location
sequence supply of full bins to the weighbridge system to meet cut-to-crush sequence
couple and uncouple cane bins safely to meet required length
liaise with loco and equipment drivers
use communication systems.
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Cane yards and related signalling and control systems
Cane locos (does not include operation)
Relevant codes of practice and industry standards
Bin consignment and trip/cut-to-crush documentation
Operating procedures and related advice on equipment operation
Loaded and empty bins
Personal protective clothing and equipment
Communication systems and equipment
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures.
Method of assessment
This unit should be assessed together with core units and other units of competency relevant to the function or work role.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Other units of competency relevant to the work role should be assessed in conjunction with this unit.
Replaces
State Code National Code Title Type
AYL35 SUGTCYM1A Control yard movements Unit of competency
Replaced By
State Code National Code Title Type
OAM26 FBPSUG1003 Move cane bins in a marshalling yard Unit of competency
No information