Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Control hydro generation pumping

Control hydro generation pumping

Unit of competency
National Code
UEPOPS514
State Code
OAG08
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
31/10/2018
State Implementation and Classification
Approved Date
15/05/2019
Field of Education
031301 - Electrical Engineering
Original Release Date
15/05/2019
Nominal Hours
54
Description
This unit involves the skills and knowledge required to undertake the control of hydro generation pumping through remote control of hydro generating plant.Hydro pumping is a system for generating hydroelectricpower for peak periods. This is performed bypumping water from a lower to a higher reservoir during low demand periods and then releasing it during peak periods.Competency in this unit requires the ability to maintain key indicator limits, operate remote hydro plant, maintain policies and procedures and complete work. Individuals will, in general, work as an operator, in a power generation facility. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Maintain key indicator limits
  • 1.1 Pond levels, power station discharges, plant voltage and current limits, frequency and time errors are maintained, in accordance with workplace procedures and manufacturers' specifications
  • 1.2 Hydro generation plant is run at peak efficiency, or to the load schedule, avoiding rough running zones, in accordance with workplace procedures
2 Operate remote hydro plant
  • 2.1 Hydro generation power plant is remotely stopped, started, loaded and unloaded, in accordance with workplace procedures and the operating regimes dictated by the electricity generation schedule
  • 2.2 Power generating plant is remotely switched in and out of synchronous condenser operation, as required, in accordance with workplace procedures
3 Maintain policiesand procedures
  • 3.1 Communication procedures used to alert public of increased river flows, in accordance with workplace procedures
  • 3.2 Minimum river flows are maintained, in accordance with workplace procedures and agreed limits
  • 3.3 Water storage levels are monitored and maintained, in accordance with workplace procedures, legislative requirements and policy guidelines
4 Complete documentation
  • 4.1 Equipment problems, movements, and status are reported, in accordance with workplace procedures
  • 4.2 Documentation is updated, in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WE444 UEPOPS514B Control hydro generation pumping Unit of competency
Replaced By
State Code National Code Title Type
ODZ13 UEPOPS020 Control hydro generation pumping Unit of competency