Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare specifications for the supply of materials and equipment for electrotechnology projects

Prepare specifications for the supply of materials and equipment for electrotechnology projects

Unit of competency
National Code
UEECO0013
State Code
OBZ43
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to write technical specifications for the supply of materials and equipment for electrotechnology projects.It includes establishing performance requirements and prescribing parameters, and preparing specifications for the supply of materials and equipment. It also includes documenting and submitting quotations.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine performance and parameters of materials and equipment
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures are identified and applied
  • 1.2 Extent of project work is determined from design brief specifications, other relevant documentation and discussions with appropriate person/s
  • 1.3 Performance and prescribed parameters of materials and equipment are established from design brief specifications, other relevant documentation and discussions with relevant person/s
  • 1.4 Required date for materials and equipment is determined from design brief specifications, other relevant documentation and discussions with relevant person/s
  • 1.5 Activities are planned to meet scheduled timeframes in consultation with relevant person/s
2 Prepare specifications for supply of materials and equipment
  • 2.1 Manufacturer specifications and limitations of materials and equipment are sought
  • 2.2 Manufacturer specifications and limitations are compared with the established performance and prescribed parameters for materials and equipment
  • 2.3 Sources and availability of materials and equipment are established in accordance with workplace procedures
  • 2.4 Specifications for the supply of materials and equipment, including required evidence of compliance, are developed in accordance with workplace procedures
  • 2.5 Additional services are incorporated in the specifications, as required
  • 2.6 Solutions to unplanned events are implemented in accordance with workplace procedures
3 Document and submit quotation
  • 3.1 Material and equipment supply documentation is forwarded to relevant person/s for processing in accordance with workplace procedures
  • 3.2 Material and equipment supply documentation is filed in accordance with workplace procedures