Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install pre-ballast

Install pre-ballast

Unit of competency
National Code
FDFSUG101A
State Code
WD826
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/05/2012
State Implementation and Classification
Approved Date
31/07/2014
Field of Education
039907 - Rail Operations
Original Release Date
31/07/2014
Nominal Hours
10
Description
This unit describes the outcomes required to lay pre-ballast in preparation for laying railway track for a cane haulage system.
Notes
Elements and Performance Criteria
1. Plan and prepare work
  • 1.1 The location and scope of work are identified
  • 1.2 Materials required to complete the work are confirmed and available
  • 1.3 Equipment status is confirmed
  • 1.4 Personal protective equipment is selected, correctly fitted and used
  • 1.5 Safety procedures are followed to confirm that work is clearly signed and relevant authorities are advised that work is in progress
  • 1.6 Site is inspected prior to commencing work to identify and remove potential hazards
2. Set out base and run pre-ballast
  • 2.1 Base/foundation is set out from off-set pegs to centre line and width for ballast according to track design and specifications
  • 2.2 Pre-ballast is applied evenly to meet specified thickness
  • 2.3 Pre-ballast is compacted to meet specifications
3. Complete work
  • 3.1 The construction area is cleared of debris
  • 3.2 Unused materials are stored as required
  • 3.3 Tools, plant and equipment is cleaned and stored as required
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Workplace information
Workplace information can include:
Standard Operating Procedures (SOPs) and
manufacturer's specifications.
Cane railway networks
Cane railway network features and their characteristics may include:
main and branch lines
yards
sidings
loops
dump points and pads
and road transport delivery points.
Information systems
Information systems may be print or screen based.
Equipment
Equipment may include:
materials handling equipment such loaders and jacks,
spreader
roller and
compacting equipment.
Equipment status
Confirming equipment status involves
conducting relevant pre-start checks
confirming that all safety guards and equipment are ready and safe to operate.
Teamwork
Work may require the ability to work within a team environment.
Communication
Communication methods may include:
use of two-way radios.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
estimate material requirements for a given project
operate pre-ballast equipment to lay and compact materials to the required location and thickness
take corrective action in response to abnormal or unacceptable performance.
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Site and related project information
Relevant codes of practice and industry standards
Spreader, roller and related equipment
Materials handling equipment as required
Operating procedures and related advice on equipment operation
Base materials - typically gravel and stone
Personal protective clothing and equipment
Communication systems and equipment
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures.
Method of assessment
Other units of competency relevant to the work role should be assessed in conjunction with this unit.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Replaces
State Code National Code Title Type
S2853 SUGSPPB1A Prepare pre-ballast Unit of competency
Replaced By
State Code National Code Title Type
OAM00 FBPSUG1001 Install pre-ballast Unit of competency