Unit of competency Outline

Date retreived
23/07/2026 5:51 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Respond to complex power system protection operations

Respond to complex power system protection operations

Unit of competency
National Code
UETTDRSO50
State Code
OBG73
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
20/04/2021
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031301 - Electrical Engineering
Original Release Date
04/12/2019
Nominal Hours
162
Description
This unit covers the coordination of response to complex protection operations due to system faults. It includes planning, carrying out and completing the response to complex protection operations. The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan response to complex protection operations
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) practices/procedures and environmental and sustainable energy procedures, which may influence the preparation of response to complex protection operations, are reviewed and determined
  • 1.2 Purpose of the response is established after data is analysed and expected outcomes of the work are confirmed with appropriate personnel
  • 1.3 Established policies, procedures and specifications for the response are obtained or established with appropriate personnel
  • 1.4 Response to complex protection operations are discussed with and/or directed to appropriate personnel in order to ascertain the scope of the work/testing required
  • 1.5 Testing parameters are ascertained from established policies, procedures and specifications
  • 1.6 Equipment/tools and personal protective equipment (PPE) are selected based on specified performance criteria and established procedures
  • 1.7 Work roles and tasks are allocated according to requirements and individual competencies
  • 1.8 Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe, to a quality standard and in accordance with established procedures
  • 1.9 Liaison and communication issues with others/authorised personnel, authorities and clients are resolved and activities coordinated to carry out work
  • 1.10 Risk control measures are identified, prioritised and evaluated against the work schedule
  • 1.11 Need for relevant work permits is identified to coordinate the performance of work according to requirements and/or established procedures
  • 1.12 Circuit/systems modelling is used to evaluate alternative proposals in accordance with established procedures
2 Carry out response to complex protection operations
  • 2.1 Strategic plans are developed incorporating organisational initiatives as per established procedures
  • 2.2 WHS/OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures
  • 2.3 Decisions concerning the response to complex protection operations are made on the basis of safety and effective outcomes according to requirements and/or established procedures
  • 2.4 Stakeholders/customers are kept informed of current status regarding plan progress and recent developments
  • 2.5 Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures
  • 2.6 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the work within an agreed timeframe according to requirements
  • 2.7 Testing of the decision to be implemented is undertaken according to requirements and established procedures
  • 2.8 Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures
  • 2.9 Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements
  • 2.10 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards
3 Complete the response to complex protection operations
  • 3.1 Final review of the response to complex protection operation is undertaken to ensure it complies with all requirements and includes all specifications and documentations needed to complete the work
  • 3.2 Appropriate personnel are notified of completion and reports and/or completion documents (electronic/paper) are finalised/commissioned
  • 3.3 Reports and/or completion documents (electronic/paper) are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval
  • 3.4 Approved copies of the response to complex protection operation documents (electronic/paper) are issued and records are updated in accordance with established procedures
No information
No information
Replaces
State Code National Code Title Type
WD767 UETTDRSO50A Respond to complex power system protection operations Unit of competency
Replaced By
State Code National Code Title Type
ODN63 UETDRSO010 Respond to complex power system protection operations Unit of competency