Unit of competency Outline

Date retreived
22/07/2026 8:15 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct continuous flight auger drilling

Conduct continuous flight auger drilling

Unit of competency
National Code
RIINHB305A
State Code
WB177
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
22/06/2011
State Implementation and Classification
Approved Date
20/01/2010
Field of Education
030303 - Mining Engineering
Original Release Date
20/01/2010
Nominal Hours
60
Description
This unit covers the conduct of continuous flight auger drilling in resources and infrastructure industries. It includes planning and preparing for conducting continuous flight auger drilling; operating continuous flight auger drills; maintaining equipment; and respond to problems.
Notes
Elements and Performance Criteria
1. Plan and prepare for conducting continuous flight auger drilling
  • 1.1. Access, interpret and apply compliance documentation relevant to the work activity
  • 1.2. Obtain, confirm and apply work instructions for the allocated task
  • 1.3. Identify, manage and report all potential hazards
  • 1.4. Resolve coordination requirements with others at the site prior to commencing and during work activities
  • 1.5. Take steps to protect the environment and record any environmental incidents
2. Operate continuous flight auger drill
  • 2.1. Collar borehole, start hole, maintain hole alignment, take corrective action for deflections
  • 2.2. Make up appropriate drill string
  • 2.3. Handle additional augers, inserting them in the drill string
  • 2.4. Apply rotation, feed and holdback so that flights are substantially full for the soil being drilled at any given depth
  • 2.5. Interpret flow from the flights and other factors to determine conditions at the bit
  • 2.6. Describe and log, or record, description of the soils being excavated
  • 2.7. Make, break auger string and drive head connections safely
  • 2.8. Deploy and recover associated sampling equipment, obtain samples, bag, label and record samples
  • 2.9. Maintain a clear hole and a clear bottom and deploy tools for cleaning hole bottom at completed depth and/or prior to sampling tool deployment
  • 2.10. Interpret and/or calculate actual depth at any point during drilling, interpret depth of strata changes and identify fill depth in any bore
  • 2.11. Select appropriate strategies for recovery of dropped augers
  • 2.12. Recover drill string using winch and/or head/kelly and disassemble drill string
  • 2.13. Select bits for formation being drilled
  • 2.14. Select appropriate augering method for situation
  • 2.15. Maintain spoil removal from hole collar with appropriate safety protocols and constantly maintain safe working conditions
  • 2.16. Abandon, cover and/or secure bores to ensure safety of others and crew
  • 2.17. Communicate effectively with crew, clients and management
  • 2.18. Prepare and submit paperwork for daily activities including bore logs where appropriate
  • 2.19. Ensure appropriate personal protective equipment and work clothing for the task is worn
3. Maintain equipment
  • 3.1. Monitor external wear in drill string, rotate string elements to ensure even wear
  • 3.2. Interchange drill bits and/or drill bit elements to maintain free cutting ability
  • 3.3. Check all string and equipment elements for wear and proper function
  • 3.4. Replace worn elements in string, bits and equipment and recycle 'out of specification' equipment for repair or redundancy
  • 3.5. Apply lubrication as appropriate
  • 3.6. Maintain good housekeeping on site and for equipment in storage
  • 3.7. Keep auger equipment clean
4. Respond to problems
  • 4.1. Identify possible operational problems in equipment or process
  • 4.2. Identify symptoms of problems needing remedial action
  • 4.3. Determine possible fault causes
  • 4.4. Rectify problem using appropriate solution within area of responsibility
  • 4.5. Follow through items initiated until final resolution has occurred
  • 4.6. Report problems outside area of responsibility to designated person
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Work instructions may come from:
briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:
nature and scope of tasks
specifications
quality of finished works
achievement targets
operational conditions
obtaining of permits required
site layout
out of bounds areas
worksite inspection requirements
lighting conditions
plant or equipment defects
hazards and potential hazards
coordination requirements or issues
contamination control requirements
environmental control requirements
barricade and signage requirements
Coordination requirements may include
drill team
other equipment operators
maintenance personnel
supervisors
worksite personnel
Hazards may include:
release of gases from formation or samples obtained
spread of contaminants as a result of drilling or cleaning processes
change in the chemistry of contaminants as a result of drilling and recovery of the samples
working in proximity to drilling rig
use of high pressure air for drilling operations
entanglement in rotating pipes
string makeup and breakout hazards
drilling equipment and down-hole tools will depend on the air drilling method being used
Personal protective equipment includes:
steel-capped boots and hardhat
gloves
dust mask
eye and hearing protection
general protective and reflective clothing
Equipment includes:
solid flight augers including hex coupled augers, hex pins, D clips, screw taper thread (jet augers) and thread lube
hollow flight augers including overshot deployment of sampling tools, various manufacturer's tooling, taper screw threads and dog coupled reversible hollow augers, older hollow auger systems using parallel wall threads and plug bits deployed on inner rods
sampling systems including SPT hammers and split spoons
auger recovery tools, auger retaining plate, lifting sockets and hoisting plugs
O rings and flush hole plug spares for dog couples reversible hollow augers, circlip pliers
Operational problems may include:
straighten holes and starting straight holes
encountering excessive water
sand blowback with hollow augers in wet unconsolidated formations
cork screwing effect when hold back not set properly
rotating too fast so that flights are not properly filled
cross contamination of samples when using solid flight augers
balancing bit cutting action with hole clearing action
recovering samples in wet conditions
OHS issues relating to rotating plant including catching long hair, loose clothing, finger injuries, safety with lifting and carrying

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for conducting of continuous flight auger drilling
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of continuous flight auger drilling
working with others to undertake and complete the continuous flight auger drilling tasks that meets all of the required outcomes
consistent timely completion of continuous flight auger drilling tasks that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete continuous flight auger drilling tasks
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Replaces
State Code National Code Title Type
W2166 DRTNHB28A Conduct continuous flight auger drilling Unit of competency
Replaced By
State Code National Code Title Type
WH474 RIINHB305D Conduct continuous flight auger drilling Unit of competency
State Code National Code Title Type
W682 RII31809 Certificate III in Drilling Operations Qualification