Unit of competency Outline

Date retreived
22/07/2026 8:17 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install structures for permaculture systems

Install structures for permaculture systems

Unit of competency
National Code
AHCPER310
State Code
BAR33
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
27/06/2016
State Implementation and Classification
Approved Date
12/01/2017
Field of Education
059999 - Agriculture, Environmental And Related Studies, N.e.c.
Original Release Date
12/01/2017
Nominal Hours
30
Description
This unit of competency describes the skills and knowledge required to install permaculture structures and features. These structures and features may include fences, trellises, animal housing, sheds, pergolas, appropriate technologies and other constructed features.All work is carried out to comply with workplace procedures. Manufacturer’s specifications are observed and operating instructions are followed when using tools and equipment.This unit applies to individuals who take responsibility for their own work and for the quality of the work of others. They use discretion and judgement in the selection, allocation and use of available resources.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for structural work
  • 1.1 Interpret plans and clarify specifications with the manager, client or owner
  • 1.2 Check the quantity and quality of materials to ensure they conform to permaculture design drawings and specifications
  • 1.3 Select and check tools and equipment
  • 1.4 Identify work health and safety hazards, assess risks, implement controls and take appropriate action
  • 1.5 Identify environmental implications of installing permaculture structures
2. Set out the site for the structure
  • 2.1 Determine the location of services from site plans and from local knowledge
  • 2.2 Mark out the position of the structure or feature using permaculture design drawings and specifications
  • 2.3 Excavate and prepare any footings or post holes appropriate to the type of structure to be installed
3. Prepare and cut materials
  • 3.1 Lay out materials ready for assembly
  • 3.2 Mark out the length of materials and the positions of joins according to designated specifications in the permaculture design drawings
  • 3.3 Select, use and maintain cutting and other tools
  • 3.4 Cut and join materials in preparation for assembly
4. Assemble and erect structure
  • 4.1 Assemble materials into position and fix into place
  • 4.2 Finish structure to ensure all materials are secure and complete
  • 4.3 Apply any required coatings
5. Check quality of work and clean-up site
  • 5.1 Inspect quality of finished works and ensure the standard of the finished structure or feature is appropriate to the permaculture design drawings and specifications
  • 5.2 Clean up debris from structure and site
  • 5.3 Dispose of waste material
  • 5.4 Store or recycle unused materials for future re-use
  • 5.5 Clean and store tools and equipment
No information
No information
Replaced By
State Code National Code Title Type
OFC48 AHCPER327 Install structures for permaculture systems Unit of competency
State Code National Code Title Type
BDD1 AHC33816 Certificate III in Permaculture Qualification