Unit of competency Outline

Date retreived
22/07/2026 5:06 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Implement landfill rehabilitation plan

Implement landfill rehabilitation plan

Unit of competency
National Code
PRMWM56A
State Code
S4410
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
30/03/2009
State Implementation and Classification
Approved Date
06/07/2005
Field of Education
039901 - Environmental Engineering
Original Release Date
06/07/2005
Nominal Hours
18
Description
This unit of competency describes the rehabilitation of a landfill site, including recontouring, profiling soil, constructing drains and berms, and planting flora. This unit would usually be carried out under routine supervision and within organisational guidelines.
Notes
Elements and Performance Criteria
1 Organise for rehabilitation
  • 1.1 Review environmental management and site development plans to clearly identify all job requirements1.2 Identify and manage potential risks and hazards to job requirements, in accordance with company requirements, OHS, and other relevant legislation1.3 Identify and obtain appropriate plant and equipment required for work in accordance with company requirements1.4 Identify and obtain appropriate tools and materials required for work, in accordance with company requirements1.5 Select and fit emergency and personal protective equipment in accordance with job requirements, manufacturers' specifications, company requirements and relevant legislation1.6 Erect safety barriers and signage at work sites to ensure safety of surrounding personnel and public, in accordance with company requirements and relevant legislation
2 Recontour rehabilitation area
  • 2.1 Ensure recontouring blends into the surrounding environment or as specified in the closure/rehabilitation plan2.2 Minimise creation of dust using appropriate earthmoving techniques
  • 2.3 Ensure final landform replicates surrounding environment or as specified by closure/rehabilitation plan and environmental guidelines2.4 Determine catchment construction by site and weather conditions according to closure/rehabilitation plan and environmental guidelines
  • 2.5 Carry out recontouring activities in accordance with closure/rehabilitation plan and environmental guidelines
3 Profile soil
  • 3.1 Construct the soil profile in accordance with environmental guidelines, which are designed to stabilise contamination of materials and present contamination of soil and surrounding areas3.2 Choose appropriate selection of materials for sub-soil, taking into account vegetation requirements3.3 Ensure that construction of soil profile horizons emulate the surrounding environment or are in accordance with closure/rehabilitation plan3.4 Check landform construction for completion prior to placement of final soil layer3.5 Ensure that soil horizon construction follows land contour to reduce water flow down slope and increase water storage capabilities3.6 Add nutrients to soil in accordance with closure/rehabilitation plan and environmental guidelines
4 Construct drains and berms
  • 4.1 Peg and construct drain locations in appropriate locations and angles to ensure the control of water flow, in accordance with closure/rehabilitation plan4.2 Place drain mechanisms at required dimensions and provide appropriate catchment locations for sediment in accordance with closure/rehabilitation plan4.3 Construct berms to ensure water flows into designated areas in accordance with closure/rehabilitation plan4.4 Control erosion of drain edges through the placement of appropriate drain mechanisms to reduce the speed of water flow4.5 Reduce erosion by placing berms and intervals in accordance with closure/rehabilitation plan
5 Plant flora
  • 5.1 Ensure planting activities are undertaken within appropriate season and growing conditions5.2 Plant, protect and maintain seeds, ground covering, plants and trees in accordance with planting requirements and specifications5.3 Apply fertiliser according to plant type, soil quality, manufacturers' specifications, company requirements and rehabilitation plan5.4 Ensure planting arrangement conforms to contour of site and pattern specification as detailed in closure/rehabilitation plan
6 Document rehabilitation activities
  • 6.1 Document all details of landfill site rehabilitation accurately and promptly in accordance with company requirements and relevant legislation
Catchment devices may include
diversion channels, holding structures (banks, drains and dams) and sediment dams.

Company includes
all forms of business enterprises in this context including local governments/councils.

Company requirements
are found in briefing papers, letters, quality assurance documents, tender/contract documents and verbal or written instructions.

Contamination may include
exposure to sunlight
infestation
mixing with other waste types
rot or mould
waterlogging.

Drain and berm
may be concrete, plastic, rock and soil.

Drain mechanisms may include
berm, flora coverage (grasses and small bushes) and netting.

Emergency and personal protective equipment must include
communications equipment
eye protection
eyewash kit
fire extinguishers
First Aid kit
gloves
overalls and protective clothing
protective boots.

Emergency and personal protective equipment could also include
breathing apparatus
emergency procedure guides
face shield/mask
hard hat
hearing protection
material safety data sheets (MSDS)
spill kit.

Emergency response action/procedures include but are not limited to
clean up
contain emergency
equipment/plant isolation and shut-down
evacuation
First Aid
make safe
notification of authorities
use of appropriate personal protective equipment.

Environmental issues may include
environmental incidents
minimisation of waste
recycling
reduction in use of non-renewable resources
relevant environmental protection legislation
resource efficiency
voluntary environmental agreements entered into with external organisations.

Erosion
may be water run-off and wind.

Manufacturers' specifications
are found in equipment operators' manuals.

Materials include
drainage materials
fertiliser
gravel
ground covers
lawn seed
netting
pesticides
plant protection covers
plants
seedlings
seeds
shrubs
stakes
topsoil
water.

Performance of this unit is carried out in accordance with relevant requirements of the following
Australian Standards
environmental regulations
legislative requirements
manufacturers' specifications
OHS regulations and procedures
organisational procedures
relevant state/territory regulations.

Personal protective equipment required
will be cleaned, stored, worn/fitted in accordance with company requirements, equipment specifications, and occupational health and safety and other legislation.

Plant and equipment includes but is not limited to
communications equipment
compactor
dozer
grader
lawnmower
loader
planting equipment
roller
scraper
signage
tractor
truck
whipper snipper.

Relevant legislation and codes cover state and federal
duty of care
industry codes of conduct
occupational health and safety legislation
Australian Standards
environmental protection legislation
road laws.

Safe operating procedures include
any activity or operation, conducted on site to ensure health and safety of personnel/equipment in the area.

Soil profile may include
gravel, topsoil and various grades and types of materials.

Critical aspects of competency
Correct determination of rehabilitation work required (including reviews closure/rehabilitation plan and job requirements).
Accurate determination of plant, equipment, tools, and materials requirements.
Correct selection of appropriate emergency and personal protective equipment requirements.
Accurate identification of potential risks and hazards to rehabilitation activities.
Rehabilitation of site in accordance with closure/rehabilitation plan.
Recontours rehabilitation area in accordance with closure/rehabilitation plan.
Profiles soil in accordance with closure/rehabilitation plan.
Constructs drains and berms in accordance with closure/rehabilitation plan.

Knowledge needed to achieve the performance criteria
Knowledge and understanding are essential to apply this unit in the workplace, to transfer the skills to other contexts, and to deal with unplanned events. The knowledge requirements for this unit are listed below.
Closure/rehabilitation plan.
Material placement procedures.
Recontouring characteristics.
Recontouring procedures.
Catchment systems.
Principles of erosion and water run-off.
Dust suppression procedures.
Soil profiling methods.
Soil horizon construction methods.
Flora, soil and nutrient requirements.
Draining methods.
Seed and plant varieties.
Seed and plant planting methods.
Watering principles.
Soil dynamics.
Fertiliser characteristics and application methods.
Company requirements.
Occupational health and safety requirements.
Duty of care in provision of services.
Relevant industry standards.
Relevant legislation.
Relevant environmental regulations.
OHS hierarchy of control.

Specific skills needed to achieve the performance criteria

To achieve the performance criteria, some complementary skills are required. These are:

communication including liaison, report writing, interpersonal, listening, questioning, following instructions
use of personal protective equipment
interpretation of ground conditions
interpretation of plans, reports, maps, specifications
driving techniques
dumping techniques
pushing techniques
use of relevant hand tools
directing
monitoring
construction skills
planting seedlings (machine or hand)
mixing and applying fertiliser
watering
applying diagnostic techniques
organising work tasks
use of communications equipment (two-way radio and mobile phone)
hazard identification
time management
safe and efficient work practices
following MSDS.

Other units of competency that could be assessed with this unit
This unit could be assessed on its own or in combination with other units relevant to the job function, for example all the units covering landfill maintenance at a similar level may be able to be assessed in conjunction.
Where assessment covering a cluster of units is to be conducted, it may be useful to assess the units together as far as practicable. This may be most useful when an experienced applicant is being assessed for the purpose of recognition of current competency.

Resources required to assess this unit

The following resources should be available:

company environmental management strategy
plant and equipment for rehabilitation
safety barriers and signage
materials for rehabilitation
PPE
OHS requirements
environmental protection legislative requirements
site safety plan.

Gaining evidence to assess this unit
For valid and reliable assessment of this unit, the competency should be demonstrated over a period of time and be observed by the assessor (or assessment team working together to conduct the assessment). The competency is to be demonstrated in a range of situations, which may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Evidence of competency is best obtained by observing activities in the field and reviewing the rehabilitation of a landfill site under normal industry operating conditions. If this is not practicable, observations in realistic simulated environments may be substituted.

Consistency in performance
Assessment requires that strategies meet the objectives of clients and comply with industry expectations in the particular client environment. If the environment is narrowly defined or is not representative of industry needs, it will be necessary to assess the unit within a variety of waste management environments or different client needs to assess competency in the rehabilitation of a landfill site.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge. (In assessment situations where the candidate is offered a preference between oral questioning and written assessment, questions are to be identical.)
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
Note: All practical demonstrations must adhere to the safety and environmental regulations relevant to each state or territory.

Communicating ideas and information
Discuss aspects of rehabilitation with clients and colleagues. (1)

Collecting analysing and organising information
Gather and analyse information from a number of sources (including regulatory sources, relevant personnel and company specifications). (2)

Planning and organising activities
Prepare appropriately for rehabilitation of landfill site. (2)

Working with others and in teams
Conduct discussions with clients and/or colleagues during client contact. (1)

Using mathematical ideas and techniques
Conduct and document appropriate mathematical calculations. (1)

Solving problems
Discuss possible problems and solutions throughout the rehabilitation of landfill site process. (1)

Using technology
Demonstrate understanding of technological principles and physical skills to use appropriate equipment. (1)

Replaced By
State Code National Code Title Type
WC217 CPPWMT4056A Implement landfill rehabilitation plans Unit of competency