Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Lift and move load using a mobile crane

Lift and move load using a mobile crane

Unit of competency
National Code
TLID3036A
State Code
D5086
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/03/2011
State Implementation and Classification
Approved Date
04/08/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
04/08/2014
Nominal Hours
40
Description
This unit involves the skills and knowledge required to lift and move a load using a non-slewing mobile crane or a slewing mobile crane. It includes operating the mobile crane to complete job requirements, monitoring lift conditions, implementing shut-down procedures, packing up crane after operations, and completing all required job records. Licensing, legislative, regulatory or certification requirements are applicable to this unit.
Notes
Elements and Performance Criteria
1Operate mobile crane
  • 1.1 In ascent and descent to/from crane correct use is made of the means provided in accordance with codes of practice and workplace procedures
  • 1.2 Planned hazard control strategies are implemented
  • 1.3 Required signals are correctly given, interpreted and followed in accordance with appropriate workplace procedures
  • 1.4 Boom is positioned to ensure load to be lifted is plumbed under hook
  • 1.5 Load is hoisted and lowered into position using crane movements in accordance with the appropriate workplace procedures
  • 1.6 Crane controls are operated smoothly
  • 1.7 Crane is shut down and secured during periods of non-operation according to manufacturers specifications and workplace procedures
2Monitor lift conditions
  • 2.1 Load is constantly monitored to ensure load and structural stability
  • 2.2 Conditions which may affect the continuing stability of the crane are identified and monitored
  • 2.3 Unplanned situations are responded to in line with workplace procedures in a manner that minimises risk to personnel and equipment
  • 2.4 Dogger is advised of any new information which affects the lift
  • 2.5 Any necessary changes to job plan are discussed and confirmed with rest of crew
  • 2.6 Advice is sought from supervisor where there is doubt about correct response to unanticipated conditions, or conflict with customer request
  • 2.7 Supervisor/allocator is advised of any concern about completing the job within timeframe
3Implement shut-down procedures
  • 3.1 The relevant motion locks and brakes are applied
  • 3.2 Crane is shut down using the correct sequence of procedures in accordance with manufacturers specifications and workplace procedures
  • 3.3 Routine post-operational equipment checks are carried out in accordance with manufacturers specifications
4Pack up crane
  • 4.1 Crane is de-rigged with other crane personnel in accordance with manufacturers instructions
  • 4.2 All lifting equipment and crane components are checked in consultation with crane personnel for any signs of deterioration or damage in accordance with the appropriate Australian Standard
  • 4.3 Damaged or worn equipment is segregated and reported to an authorised person for testing/repair/destruction
  • 4.4 Crane and equipment are correctly stowed and secured in accordance with manufacturers instructions and the appropriate Australian Standard
5Complete job records
  • 5.1 Customer feedback is sought regarding satisfaction with the completed job, and any areas of concern are reported according to workplace procedures
  • 5.2 Customer's signature on job completion documentation is obtained
  • 5.3 Required workplace records are updated accurately and promptly and processed according to workplace procedures
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Operations may be conducted:
by day or night
in a variety of weather conditions
Environment may include movement of:
equipment
goods
materials and vehicular traffic
Customers may be:
internal or external
Mobile crane may be any slewing and non-slewing crane and may be involved in work in a range of industry sectors including:
construction and demolition
manufacturing
waterfront
mining
primary industry
utilities (electricity, gas, water)
arboricultural
swimming pool
quarrying
Hazards may include:
power lines
noise, light, energy sources
overhead service lines
surrounding buildings, structures, facilities
underground services
obstructions
uneven or unstable ground and recently filled trenches
stationary and moving machinery and equipment
hazardous or dangerous materials
traffic hazards and congestion
Hazard management is consistent with:
the principle of hierarchy of control with elimination, substitution, isolation and engineering control measures being selected before safe working practices and personal protective equipment
Personal protective equipment may include:
gloves
safety headwear and footwear
sunscreen, sunglasses and safety glasses
two-way radios
high visibility clothing
Consultative processes may involve:
other employees and supervisors
management
union representatives
clients
industrial relations and OH&S specialists
other professional or technical staff
Requirements for access and/or lift may include:
site restrictions and procedures
authorities and permits
hours of operation
induction
slings, chains, nets, brackets and other specialised lifting equipment
noise restrictions
personal protective equipment
support trucks
additional gear and equipment
communications equipment
Depending on the type of organisation concerned and the local terminology used, workplace procedures may include:
company procedures
enterprise procedures
organisational procedures
established procedures
site procedures
Documentation/records may include:
site plans
Safe Working Load (SWL) and Working Load Limit (WLL)
operations manuals including load charts and crane and rigging manuals
induction documentation
competency standards and training materials
job specifications and procedures
manufacturers specifications
workplace operating procedures and policies
supplier and/or client instructions
communications technology equipment, oral, aural or signed communications
personal and work area work procedures and practices
conditions of service, legislation and industrial agreements including:
workplace agreements and awards
occupational health and safety procedures
standards and certification requirements
quality assurance procedures
emergency procedures
Applicable procedures and codes may include:
relevant state/territory regulations and licence/permit requirements pertaining to mobile cranes
relevant Australian Standards and certification requirements
relevant state/territory road rules
relevant state/territory OH&S legislation
relevant state/territory fatigue management regulations
relevant state/territory environmental protection legislation
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of:
applying the underpinning knowledge and skills
applying relevant legislation and workplace procedures
complying with OH&S licensing legislation
applying risk assessment and management procedures for mobile crane operations
effectively completing the pre-operational checks, positioning, stabilising, set-up, post-operational checks of a mobile crane
using mathematical procedures to determine the weight of a load and the lifting equipment required for the lift
using load charts to determine the limitations of the crane and/or crane set-up required
operating the crane including all functions to their maximum extension in the lifting and moving of a load
Context of and specific resources for assessment
Performance is demonstrated consistently over a period of time and in a suitable range of contexts
Resources for assessment include:
a range of relevant exercises, case studies and/or other simulated practical and knowledge assessment, and/or
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through appropriately simulated activities at the registered training organisation, and/or
in an appropriate range of situations in the workplace
Replaces
State Code National Code Title Type
S5700 TLID3607C Lift and move load using mobile crane up to and including 20 tonnes Unit of competency
Replaced By
State Code National Code Title Type
AWM55 TLID3036 Lift and move load using a mobile crane Unit of competency