Unit of competency Outline

Date retreived
22/07/2026 11:43 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Set up and optimise glass forming process

Set up and optimise glass forming process

Unit of competency
National Code
PMC553040C
State Code
WA961
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
30/04/2010
State Implementation and Classification
Approved Date
14/10/2010
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/10/2010
Nominal Hours
80
Description
This unit of competency covers the setting up and tuning of the glass forming process including technical fault finding and non-routine problem solving, emergency recovery, optimising the process to gain maximum yield, and detailed knowledge of forming process.
Notes
Elements and Performance Criteria
1. Prepare for equipment installation
  • 1.1. Determine the product to be manufactured
  • 1.2. Ensure that the equipment change parts, ancillaries and fixtures are available as required
  • 1.3. Perform pre-instalment equipment preparation according to procedures
  • 1.4. Ensure that the equipment is in a safe condition for use
2. Remove current equipment and/or tooling
  • 2.1. Identify and implement all safety and emergency procedures
  • 2.2. Shut down equipment in accordance with procedures.
  • 2.3. Isolate equipment as per procedures
  • 2.4. Remove ancillary equipment in accordance with procedures
  • 2.5. Complete records and logs for removal of current equipment
3. Install and setup new equipment and/or tooling
  • 3.1. Perform required checks and tests prior to installation
  • 3.2. Identify any faults in equipment/tooling and take appropriate action
  • 3.3. Install and set up appropriate ancillary equipment in accordance with procedures
  • 3.4. Set up equipment/tooling as required
  • 3.5. Monitor and adjust until production is as required
4. Monitor, interpret data and adjust operation
  • 4.1. Monitor process data
  • 4.2. Ensure forming equipment startup function complies with work instructions
  • 4.3. Operate glass forming equipment in accordance with procedures
  • 4.4. Monitor plant and process and deduce conditions of materials in process and products being made
  • 4.5. Take appropriate action to improve process operation
  • 4.6. Check that process operation has improved
  • 4.7. Monitor and adjust until production is as required
5. Sample test and record product data
  • 5.1. Sample as required by the product and in line with enterprise requirements
  • 5.2. Complete appropriate test to enterprise and client requirements
  • 5.3. Identify variations from process parameters and take appropriate action
  • 5.4. Measure/graph and record operating parameters, according to enterprise requirements
  • 5.5. Record test results as required by procedures
6. Rectify equipment and quality problems
  • 6.1. Identify the range of equipment and quality faults that can occur during the operation
  • 6.2. Diagnose possible causes of equipment and quality faults
  • 6.3. Rectify cause of equipment failure and quality faults by established enterprise procedures
  • 6.4. Identify and rectify equipment failure causes in accordance with established enterprise procedures
  • 6.5. Ensure appropriate records and logs of equipment operations are maintained to meet enterprise requirements
  • 6.6. Identify non-routine problems and report to designated person
7. Shut down equipment
  • 7.1. Shut down equipment in accordance with procedures
  • 7.2. Complete appropriate records and logs
  • 7.3. Shut down equipment in an emergency situation
8. Prepare equipment for maintenance
  • 8.1. Isolate equipment in accordance with work instructions
  • 8.2. Make sure area is clear and safe for maintenance
  • 8.3. Complete all records and logs
9. Control hazards
  • 9.1. Identify hazards from the job to be done
  • 9.2. Identify other hazards in the work area
  • 9.3. Assess the risks arising from those hazards
  • 9.4. Implement measures to control those risks in line with procedures
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures and work instructions
Product to be made
The product to be made may be determined by consulting the production schedule or similar means
Required setup
Required setup includes:
alignment of all equipment
checks and adjustments according to product specifications and procedures
production schedule requirements
Monitoring
Monitoring includes analysing and interpreting data for:
variations
fluctuations
trends
with a view to establishing stable, efficient operation producing goods as required
Process data
Process data include that from:
equipment
instruments
control panels
test results
Appropriate action
Appropriate action includes adjusting:
temperature controls
equipments settings
process conditions
to ensure process parameters are maintained to job specifications
Records
Records may be in:
hard copy
electronic form
Application of equipment:
This unit includes equipment applicable to forming glass in each of the specific areas of glass products manufacture:
flat glass
insulation, glass wool insulation, laminated blankets, roll and boards
fibreglass and glass filaments
packaging, bottles and jars
Tools and equipment
Tools and equipment may include:
forming and associated equipment such as:
bushings
finshields
applicators
shoe and winder assemblies
spinners
lapping equipment
process water
lehr
furnace
forehearth
bath
fiberisers
computers
measuring and recording equipment
communication equipment
hand tools
safety clothing and equipment
Process
The process includes:
setting up, monitoring and tuning equipment for optimum performance especially during startup, job change and equipment changes
Typical problems
Typical problems may include:
raw materials supply
equipment alignment
analysis of all plant data
control of temperature within specification
product quality
equipment speed
taking corrective action
Plant data
Plant data may include:
test results
instrument/control panel information
data from physical senses (sight, sound and hearing)
temperatures, pressures, material flow and discharge rates and effects
variations to chemical reactions/material modifications
Occupational health and safety (OHS)
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment
The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.

Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the equipment be understood and that the importance of critical material properties, settings and readings is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
setup/tuning is completed to specifications
temperature and pressures are maintained within limits
adjustments made are completed in a timely manner in accordance with procedures/work instructions
quality is monitored to minimise wastage
startup and shutdown occur first time
early warning signs of equipment/processes needing attention or potential problems are recognised and dealt with in a timely manner
process measurements are continually made or observed
the range of possible causes can be identified and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems to related plant areas are recognised and an appropriate contribution made to their solution.
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.

Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.

Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
Individual enterprises may choose to add prerequisites and co-requisites relevant to their processes.

Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaces
State Code National Code Title Type
W2686 PMCOPS340B Set up and optimise glass forming process Unit of competency
Replaced By
State Code National Code Title Type
BAH23 PMC553040 Set up and optimise glass forming process Unit of competency