Unit of competency Outline
Date retreived
22/07/2026 2:42 PM AWST
22/07/2026 2:42 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Finish stone
Finish stone
Unit of competency
National Code
CPCCST2003A
CPCCST2003A
State Code
W9553
W9553
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040309 - Bricklaying And Stonemasonry
Original Release Date
20/06/2014
Nominal Hours
24
Description
This unit specifies the outcomes required to undertake the cutting and polishing processes used to finish both hard and soft stone.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Stone hardness is identified using Moh's scale.
- 1.8. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.
2. Use abrasives.
- 2.1. Coolant is used as required by selected abrasives, stones and job requirements.
- 2.2. Range of grades of abrasives is used in accordance with job requirements and specifications.
- 2.3. Polishing compounds are used in accordance with job requirements and specifications.
- 2.4. Various polishing heads are used in correct sequence to provide finish to specification.
3. Use stone cutting equipment.
- 3.1. Stone is set into place on cutting table to obtain maximum efficiency in cutting.
- 3.2. Stone is wedged or fixed into place by nailed timber strips to ensure stability and is aligned correctly to cutting blade.
- 3.3. Adjustments are made to machinery as required by maximum depth of cut and size of stone.
- 3.4. Primary cutting machines are used appropriate to their cutting capacity.
- 3.5. Secondary cutting machines are used appropriate to their cutting capacity.
- 3.6. Stone is marked out and cut according to job drawings, specifications and schedules.
4. Polish stone and form edges.
- 4.1. Adhesives are applied as fillers to stone as required by job.
- 4.2. Grinding and polishing heads are set up and operated as required by job.
- 4.3. Adjustments are made to machinery in accordance with job requirements.
- 4.4. Polishing machinery is used in a manner appropriate to its capacity.
- 4.5. Various hand-operated polishing machines are used as required by job to achieve specified finish.
5. Use adhesives and fillers.
- 5.1. Various filling compounds are selected and used according to job requirements.
- 5.2. Various types of adhesives are selected and used according to job requirements.
- 5.3. Tinting procedures for fillers and adhesives are selected and used, where required.
- 5.4. Various reinforcing materials and techniques are selected and used, where required.
6. Clean up.
- 6.1. Surfaces are cleaned as required by job in preparation for transport or installation.
- 6.2. Surface finishes, such as wax, are applied as required by job.
- 6.3. Work area is cleaned up and waste materials disposed of in an appropriate manner and in accordance with Environment Protection Authority (EPA) requirements.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
material safety data sheets (MSDS)
memos
regulatory and legislative requirements pertaining to handling stone
relevant Australian standards
safe work procedures relating to handling stone
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
restricted access barriers
traffic control
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
working platforms and scaffolding
workplace environmental requirements and safety.
Tools and equipment include:
angle grinders
buffs
circular saws
drills
edge polishers
frame saws
hole saws
Jenny Lind type polishers
line polishers
milling machines
rise and fall saws
rotating or transverse tables
stationary slab polishers
twin tables
water jets
wire saws.
Quality requirements include:
attention to specifications of work
control of handling procedures
quality of materials
relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications where specified
workplace operations and procedures
use and maintenance of equipment
workplace operations and procedures.
Materials include:
cementitious material
chemical adhesive
epoxy and polyester resins
plaster.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Statutory and regulatory authority includes:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Adhesives applied as fillers may be to:
apply reinforcing to slabs
fill natural fissures
laminate edges.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
material safety data sheets (MSDS)
memos
regulatory and legislative requirements pertaining to handling stone
relevant Australian standards
safe work procedures relating to handling stone
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
restricted access barriers
traffic control
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
working platforms and scaffolding
workplace environmental requirements and safety.
Tools and equipment include:
angle grinders
buffs
circular saws
drills
edge polishers
frame saws
hole saws
Jenny Lind type polishers
line polishers
milling machines
rise and fall saws
rotating or transverse tables
stationary slab polishers
twin tables
water jets
wire saws.
Quality requirements include:
attention to specifications of work
control of handling procedures
quality of materials
relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications where specified
workplace operations and procedures
use and maintenance of equipment
workplace operations and procedures.
Materials include:
cementitious material
chemical adhesive
epoxy and polyester resins
plaster.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Statutory and regulatory authority includes:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Adhesives applied as fillers may be to:
apply reinforcing to slabs
fill natural fissures
laminate edges.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to finish two types of stone, one hard and one soft, using at least two types of equipment listed in the range statement, providing evidence of the ability to:
comply with OHS regulations applicable to machinery, equipment and workplace operations
apply organisational quality procedures and processes within the context of finishing stone
stabilise stone or equipment, prior to cutting or polishing
select cutting and polishing processes appropriate to stone shape, size and specified finish
use polishing heads in a logical sequence to achieve specified finish
polish, using both hand-held and static polishing machinery
identify typical faults and problems that occur and action required to rectify them
communicate with others to ensure safe and effective workplace operations
complete finishing process to stone to specifications.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace operations
access to equipment and materials for cutting and polishing stone
stone relative to cutting and polishing proposed activity
drawings, specifications and documentation relevant to activity.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm a reasonable inference that competency is not only verified under the particular assessment circumstance, but is able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to finish two types of stone, one hard and one soft, using at least two types of equipment listed in the range statement, providing evidence of the ability to:
comply with OHS regulations applicable to machinery, equipment and workplace operations
apply organisational quality procedures and processes within the context of finishing stone
stabilise stone or equipment, prior to cutting or polishing
select cutting and polishing processes appropriate to stone shape, size and specified finish
use polishing heads in a logical sequence to achieve specified finish
polish, using both hand-held and static polishing machinery
identify typical faults and problems that occur and action required to rectify them
communicate with others to ensure safe and effective workplace operations
complete finishing process to stone to specifications.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace operations
access to equipment and materials for cutting and polishing stone
stone relative to cutting and polishing proposed activity
drawings, specifications and documentation relevant to activity.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm a reasonable inference that competency is not only verified under the particular assessment circumstance, but is able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| N0354 | BCF2003A | Finish stone | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCM69 | CPCCST2003 | Finish stone | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D383 | CPC20211 | Certificate II in Construction Pathways | Qualification |
| W599 | CPC32308 | Certificate III in Stonemasonry (Monumental/Installation) | Qualification |
| J786 | CPC32313 | Certificate III in Stonemasonry (Monumental/Installation) | Qualification |
| D420 | CPC32311 | Certificate III in Stonemasonry (Monumental/Installation) | Qualification |