Unit of competency Outline
Date retreived
22/07/2026 7:48 AM AWST
22/07/2026 7:48 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Handle waterproofing materials and components
Handle waterproofing materials and components
Unit of competency
National Code
CPCCWP2001
CPCCWP2001
State Code
OCN36
OCN36
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
01/06/2021
Nominal Hours
16
Description
This unit specifies the skills and knowledge required to safely handle and store waterproofing materials and components manually and mechanically, meeting all relevant requirements of Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation.It includes the preparation, handling, sorting, stacking and disposal of waterproofing products, materials and components in the application of waterproofing systems. The unit is suitable for those with basic skills and knowledge undertaking routine waterproofing tasks under the direction of more experienced workers.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare to handle waterproofing materials and components.
- 1.1 Read and interpret task work instructions and plan sequence of work.
- 1.2 Select and use personal protective equipment (PPE) as required for each stage of the task.
- 1.3 Plan all work to comply with laws and regulations, Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
- 1.4 Follow handling requirements of job safety analyses and safety data sheets.
- 1.5 Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
- 1.6 Select tools and equipment, check for serviceability and report any faults.
- 1.7 Select materials required for the task.
2 Manually handle waterproofing materials.
- 2.1 Check materials and components for conformity to material schedule, plans and specifications.
- 2.2 Determine handling characteristics of waterproofing materials and components and apply safe and effective handling techniques.
- 2.3 Sort, store and position, and stack waterproofing materials and components.
- 2.4 Protect materials and components against physical damage and environmental impacts and store clear of traffic ways.
3 Prepare for mechanical handling of materials and components.
- 3.1 Prepare and position waterproofing materials and components for mechanical handling for the type of material/component and for the requirements of the equipment to be used.
- 3.2 Load, unload, move, locate and/or install materials and/or components safely with the assistance of mechanical lifting devices/hoists.
4 Handle and remove waste materials and clean up.
- 4.1 Handle waste waterproofing materials and components in accordance with safety data sheets and regulatory requirements.
- 4.2 Identify and locate hazardous material for separate handling.
- 4.3 Clear work area, dispose of materials, and reuse or recycle in compliance with legislation, regulations and codes of practice.
- 4.4 Use dust suppression procedures to minimise health risk to others.
- 4.5 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ recommendations and WHS requirements.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9618 | CPCCWP2001A | Handle waterproofing materials | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGC8 | CPC20220 | Certificate II in Construction Pathways | Qualification |
| BGE0 | CPC31420 | Certificate III in Construction Waterproofing | Qualification |