Unit of competency Outline
Date retreived
21/07/2026 11:32 PM AWST
21/07/2026 11:32 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct, lay and connect a gas distribution service to a steel main
Construct, lay and connect a gas distribution service to a steel main
Unit of competency
National Code
UEGNSG213B
UEGNSG213B
State Code
WJ016
WJ016
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
07/04/2014
Field of Education
040327 - Plumbing
Original Release Date
07/04/2014
Nominal Hours
54
Description
1) Scope:1.1) DescriptorThis unit covers excavated bed preparation and the construction, laying and connection of a gas service to a steel main. This includes the installation of the meter to service riser, subject to local regulatory requirements.It encompasses the use of relevant tools and equipment, working safely using standard operating procedures, complying with relevant legislative, standard and code requirements and completing necessary documentation.
Notes
Elements and Performance Criteria
1 Prepare to construct and lay a service to a steel main
- 1.1 WHS/OHS and environmental measures for the site are identified, obtained and understood.
- 1.2 Relevant requirements and established procedures for the site are discussed with relevant persons to establish and confirm the work schedule.
- 1.3 WHS/OHS, environmental and sustainable energy policies and procedures are received and confirmed.
- 1.4 Hazards are identified, WHS/OHS risks assessed and control measures are prioritised, implemented and monitored according to established procedures
- 1.5 Scope of responsibility under the relevant work permit and/or relevant notification is received and confirmed with relevant persons according to requirements and established procedures
- 1.6 Equipment, plant, tools and personal protective equipment needed to construct and lay gas services are identified, obtained and checked for operation and safety.
- 1.7 Appropriate persons are consulted to ensure the work is coordinated effectively with others involved
- 1.8 Materials, plans, diagrams, drawings and resources required to construct and lay gas services are confirmed, scheduled and obtained in accordance with established procedures
- 1.9 Relevant responsibilities associated with safety and emergency procedures for an incident at the worksite are checked and confirmed.
- 1.10 Third party issues are referred to appropriate persons in accordance with established procedures.
- 1.11 Site preparation, safety plan and the work schedule are confirmed in accordance with established procedures.
2 Carry out construction and laying of a service to a steel main
- 2.1 WHS/OHS risk control measures, schedule of work and standard operating procedures for carrying out the work are followed.
- 2.2 Appropriate materials, tools, equipment and measuring devices are selected and used correctly and safely.
- 2.3 Hazardous activities such as lifting, climbing, working in confined spaces, excavations, trenches and use of power tools, techniques and practices are conducted safely in accordance with given instructions and to requirements.
- 2.4 Excavation is prepared for laying of pipe according to appropriate standards and procedures
- 2.5 Construction and laying of gas services are conducted according to appropriate standards and procedures
- 2.6 Work is carried out efficiently, to the required standard without waste of materials or damage to apparatus, equipment, the surrounding environment or services and using sustainable energy principles.
- 2.7 WHS/OHS risks and incidents are reported to the immediate authorised persons for directions according to established procedures
- 2.8 Procedures for referring non-routine events to the immediate authorised persons for directions are followed.
- 2.9 Routine quality checks are carried out in accordance with work instructions including testing of pipework.
3 Complete the work and relevant documentation
- 3.1 WHS/OHS risk control work completion measures and procedures are followed.
- 3.2 Appropriate persons are notified of completion of the work according to established procedures.
- 3.3 Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored
- 3.4 Work site is tidied and made safe in accordance with established procedures
- 3.5 Work completion documentation is completed and provided to appropriate persons in accordance with established procedures
RANGE STATEMENT
9)This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.
This Unit shall/may be demonstrated in relation to preparing an excavation bed, constructing and laying of a gas service and connection to a steel main. This includes the installation of the meter to service riser.
The following constants and variables included in the element/Performance Criteria in this unit are fully described in the Definitions Section of this volume and form an integral part of the Range Statement of this unit:
Services
Appropriate persons
Materials
Tools and equipment
Safe working procedures
Legislative requirements
Standards
9)This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.
This Unit shall/may be demonstrated in relation to preparing an excavation bed, constructing and laying of a gas service and connection to a steel main. This includes the installation of the meter to service riser.
The following constants and variables included in the element/Performance Criteria in this unit are fully described in the Definitions Section of this volume and form an integral part of the Range Statement of this unit:
Services
Appropriate persons
Materials
Tools and equipment
Safe working procedures
Legislative requirements
Standards
EVIDENCE GUIDE
8) The Evidence Guide forms an integral part of this Unit and shall be used in conjunction with all components parts of this unit and performed in accordance with the Assessment Guidelines of this Training Package.
Overview of Assessment
8.1)
Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with industry and regulatory policy in this regard.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.
Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.
Critical aspects of evidence required to demonstrate competency in this unit
8.2)
Before the critical aspects of evidence are considered all prerequisites shall be met.
Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the ‘Assessment Guidelines — UEG11’. Evidence shall also comprise:
A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:
Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range
Apply sustainable energy principles and practices as specified in the Performance Criteria and range
Demonstrate an understanding of the required knowledge and skills as described in this unit to such an extent that the learner’s performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment
Demonstrate an appropriate level of skills enabling employment
Conduct work observing the relevant Anti-discrimination legislation, regulations, polices and workplace procedures
Demonstrate performance across a representative range of contexts from the prescribed items below:
Construct and lay gas services and connection to a steel main in accordance with relevant legislation, code, regulations and procedures as described as described in 9.) Range Statement and including:
A.
Identifying and interpreting correctly drawings, diagrams, schedules, procedures and manuals relevant to the work to be undertaken.
B.
Identifying the plant and equipment and their safe operating parameters/requirements
C.
Cutting, joining, laying, covering and connecting gas distribution services pipelines in accordance with requirements
D.
Isolating, venting, purging and testing for soundness and leaks, commissioning and making safe gas services
E.
Completing required documentation and reporting.
F.
Dealing with unplanned events by drawing on essential knowledge and skills, procedures/ protocols to provide appropriate solutions incorporated in the holistic assessment with the above listed items, for example encroachment and/or contact with assets
Context of and specific resources for assessment
8.3)
This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
WHS/OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this Unit.
Appropriate environmental regulation and work practices.
Appropriate organisational requirements
Appropriate work environment, equipment and tools.
steel
These should be part of the formal learning/assessment environment.
Assessment of this competency must also be undertaken in either an actual workplace or under a simulated work environment.
Assessment must also integrate the key competencies.
Note:
Where simulation is considered a suitable strategy for assessment, conditions must be authentic and as far as possible reproduce and replicate the workplace and be consistent with the approved industry simulation policy.
The resources used for assessment should reflect current industry practices in relation to locating, proving and protecting utility assets.
Method of assessment
8.4)
This Unit shall be assessed by methods given in Volume 1 Part 3 ‘Assessment Guidelines’.
Note: Competent performance with inherent safe working practices is expected in the Industry to which this Unit applies. This requires that the specified Required Knowledge and Associated Skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the Required Knowledge and Associated Skills described in this unit.
Concurrent assessment and relationship with other units
8.5)
There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied Units where listed.
UEGNSG132A
Carry out basic work activities in a gas industry work environment
UEGNSG140A
Apply with environmental policies and procedures in the utilities industry
UEGNSG134A
Establish a utilities infrastructure work site
UEGNSG219A
Conduct excavations in the utilities industry
8) The Evidence Guide forms an integral part of this Unit and shall be used in conjunction with all components parts of this unit and performed in accordance with the Assessment Guidelines of this Training Package.
Overview of Assessment
8.1)
Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with industry and regulatory policy in this regard.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.
Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.
Critical aspects of evidence required to demonstrate competency in this unit
8.2)
Before the critical aspects of evidence are considered all prerequisites shall be met.
Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the ‘Assessment Guidelines — UEG11’. Evidence shall also comprise:
A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:
Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range
Apply sustainable energy principles and practices as specified in the Performance Criteria and range
Demonstrate an understanding of the required knowledge and skills as described in this unit to such an extent that the learner’s performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment
Demonstrate an appropriate level of skills enabling employment
Conduct work observing the relevant Anti-discrimination legislation, regulations, polices and workplace procedures
Demonstrate performance across a representative range of contexts from the prescribed items below:
Construct and lay gas services and connection to a steel main in accordance with relevant legislation, code, regulations and procedures as described as described in 9.) Range Statement and including:
A.
Identifying and interpreting correctly drawings, diagrams, schedules, procedures and manuals relevant to the work to be undertaken.
B.
Identifying the plant and equipment and their safe operating parameters/requirements
C.
Cutting, joining, laying, covering and connecting gas distribution services pipelines in accordance with requirements
D.
Isolating, venting, purging and testing for soundness and leaks, commissioning and making safe gas services
E.
Completing required documentation and reporting.
F.
Dealing with unplanned events by drawing on essential knowledge and skills, procedures/ protocols to provide appropriate solutions incorporated in the holistic assessment with the above listed items, for example encroachment and/or contact with assets
Context of and specific resources for assessment
8.3)
This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
WHS/OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this Unit.
Appropriate environmental regulation and work practices.
Appropriate organisational requirements
Appropriate work environment, equipment and tools.
steel
These should be part of the formal learning/assessment environment.
Assessment of this competency must also be undertaken in either an actual workplace or under a simulated work environment.
Assessment must also integrate the key competencies.
Note:
Where simulation is considered a suitable strategy for assessment, conditions must be authentic and as far as possible reproduce and replicate the workplace and be consistent with the approved industry simulation policy.
The resources used for assessment should reflect current industry practices in relation to locating, proving and protecting utility assets.
Method of assessment
8.4)
This Unit shall be assessed by methods given in Volume 1 Part 3 ‘Assessment Guidelines’.
Note: Competent performance with inherent safe working practices is expected in the Industry to which this Unit applies. This requires that the specified Required Knowledge and Associated Skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the Required Knowledge and Associated Skills described in this unit.
Concurrent assessment and relationship with other units
8.5)
There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied Units where listed.
UEGNSG132A
Carry out basic work activities in a gas industry work environment
UEGNSG140A
Apply with environmental policies and procedures in the utilities industry
UEGNSG134A
Establish a utilities infrastructure work site
UEGNSG219A
Conduct excavations in the utilities industry
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S8166 | UEGNSG213A | Construct, lay and connect a residential single point gas distribution service to a metal main | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAD62 | UEGNSG213 | Construct, lay and connect a gas distribution service to a steel main | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AC151 | UEGSS00005 | Construct, lay and connect a gas distribution service to steel mains | Skill set |
| J837 | UEG60114 | Advanced Diploma of Gas Supply Industry Operations | Qualification |
| J836 | UEG50114 | Diploma of Gas Supply Industry Operations | Qualification |
| J835 | UEG40114 | Certificate IV in Gas Supply Industry Operations | Qualification |
| J834 | UEG30114 | Certificate III in Gas Supply Industry Operations | Qualification |