Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Schedule Generation
Schedule Generation
Unit of competency
National Code
UEPOPS422A
UEPOPS422A
State Code
S5264
S5264
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
22/06/2011
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
22/06/2011
Nominal Hours
60
Description
1)
This unit deals with the skills and knowledge required to undertake the scheduling of a generation plant to economically meet forecast demand.
This unit deals with the skills and knowledge required to undertake the scheduling of a generation plant to economically meet forecast demand.
Notes
Elements and Performance Criteria
1 Forecast load profile
- 1.1 Comprehensive information on all variables which have the potential to affect demand is obtained and employed to enable a realistic forecast
- 1.2 Information integrity is confirmed and recorded, and deficiencies are detected and rectified
- 1.3 Forecast prediction is based on the interpretation and analysis of relevant information
- 1.4 Forecast outcomes are produced in a time frame that enables system security and economic operation criteria to be maintained
- 1.5 Forecast prediction is continuously assessed against real time trends and adjustments made where applicable
- 1.6 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
2 Identify unit availability and capability
- 2.1 Unit status information is sought with sufficient regularity to maintain the integrity of scheduling plans
- 2.2 Information integrity is confirmed and deficiencies are detected and rectified
- 2.3 Information is processed and recorded in a time frame that enables effective scheduling
- 2.4 Comprehensive information on all factors which have the potential to affect the unit status is obtained
- 2.5 Effective relationships are cultivated and maintained with remote/independent power generators
3 Prepare generation unit schedules
- 3.1 Base load generation is scheduled in accordance with contractual obligations and enterprise procedures
- 3.2 Peak load generation is scheduled to meet system demand and maintain adequate spinning reserve capability
- 3.3 Units are operated in economic merit within the framework of the enterprise fuel strategies
- 3.4 Megawatts and megavar spinning reserve criteria are met at all times in accordance with local instructions
- 3.5 System security criteria are met at all times in accordance with enterprise procedures
- 3.6 Quality of supply standards are met at all times in accordance with statutory requirements
- 3.7 Plant maintenance commitments are incorporated in setting priorities for committing units
- 3.8 Schedule is produced with sufficient lead time to allow effective plant movements to occur
- 3.9 Power station plant problems are accurately assessed in terms of impact on unit commitment and scheduling requirements
- 3.10 Plant testing commitments are incorporated in setting priorities for committing units
4 Implement generation unit schedules
- 4.1 Circumstances resulting in unexpected changes to demand are identified and managed in accordance with system requirements
- 4.2 Transmission system losses are identified and minimised in accordance with system procedures
- 4.3 Transmission and generation system status changes are identified and accommodate in accordance with system procedures
- 4.4 Fuel supply status changes are identified and accommodated in accordance with system procedures
- 4.5 Generation outputs are monitored in accordance with system procedures
- 4.6 Power station plant problems are assessed in terms of impact on unit commitment and scheduling requirements in accordance with system procedures
- 4.7 System fault levels and transmission plant load levels are identified and not exceeded in accordance with system procedures
- 4.8 Scheduling of units is timed to optimise system efficiency in accordance with system procedures
- 4.9 Scheduling information is recorded and communicated to all stakeholders in accordance with system procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYG09 | UTPNEG273A | Schedule generation | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE405 | UEPOPS422B | Schedule generation | Unit of competency |