Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install, commission, service and maintain air conditioning systems
Install, commission, service and maintain air conditioning systems
Unit of competency
National Code
UEERA0099
UEERA0099
State Code
OFG16
OFG16
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
06/10/2025
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
06/10/2025
Nominal Hours
72
Description
This unit involves the skills and knowledge required to safely and effectively install, commission, service and maintain air conditioning systems. It includes the ability to source relevant data and schematics; install components, pipe work, accessories and controls to create a functional air conditioning system. It covers selecting installing and replacing cables within air conditioning equipment operating at voltages up to 500 volt (V) alternating current (a.c.), according to relevant State/Territory legislation and regulations. Commissioning the system to ensure it operates at the specified design conditions, locating and rectifying faults and carrying out routine maintenance procedures.The skills and knowledge of this unit of competency will be applied by refrigeration and air conditioning technicians during the installation, commissioning and servicing of air conditioning systems.To undertake this unit, the learner must have a current Trainee Refrigerant Handling Licence as it includes work on refrigeration and air conditioning equipment that carries the risk of a fluorocarbon refrigerant being emitted.The skills and knowledge described in this unit require a national Refrigerant Handling Licence as it includes work on refrigeration and air conditioningequipment that carries the risk of a fluorocarbon refrigerant being emitted while decanting the refrigerant or manufacturing, installing, commissioning, servicing,maintaining or decommissioning refrigeration and air conditioning equipment.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 V alternating current (a.c.) or 120 V direct current (d.c.).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, skills and knowledge described in this unit require a relevant contract of training, such as an Australian Apprenticeship. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to refrigeration, air conditioning and electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations. Permits may also be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.
Notes
Elements and Performance Criteria
1 Prepare to install air conditioning systems
- 1.1 WHS/OHS risk control measures and procedures for carrying out the work are obtained and implemented in accordance with workplace procedures
- 1.2 Work details are determined from documentation and/or supervisor to establish scope of work to be completed in accordance with workplace procedures
- 1.3 Components, piping, accessories, controls and consumables for the installation work are obtained and checked against job requirements in accordance with industry standards and codes of practice
- 1.4 Tools, equipment and testing devices to complete work are obtained in accordance with workplace procedures and checked for operational safety in accordance with workplace procedures
2 Select, install, replace and terminate low voltage (LV) and extra-low voltage (ELV) cables within air conditioning equipment.
- 2.1 Cable conductor sizes are selected to meet the equipment manufacturer specifications, current-carrying capacity requirements
- 2.2 Reasons for selections made are documented in accordance with established procedures
- 2.3 Cables are installed and replaced to comply with technical standards, job specifications and relevant State/Territory legislation and regulations and with sufficient access to affect terminations
- 2.4 Cables and conductors are terminated at accessories in accordance with manufacturer specifications and regulatory requirements
- 2.5 Safety inspection of installed cables and testing of installed circuits are undertaken and any defects are rectified
- 2.6 'As-installed' cables/wiring are documented and appropriate person/s notified in accordance with established procedures
3 Install non-ducted split air conditioning systems
- 3.1 All required major components are securely mounted in the locations identified by the documentation or the supervisor in accordance with workplace procedures
- 3.2 Refrigerant pipe work and associated components are installed according to specifications ensuring all connections and tube cleanliness are in accordance with requirements and workplace procedures
- 3.3 Pressure testing of the installed components and pipe work is conducted to the required level for the type of refrigerant being used in accordance relevant codes of practice and industry standards
- 3.4 Leaks are located and rectified employing appropriate methods in accordance with relevant codes of practice and industry standards
- 3.5 Air conditioning system is evacuated to remove moisture and other contaminates in accordance with relevant codes of practice and industry standards
- 3.6 Vacuum drop test is carried out to verify all moisture and other contaminants have been removed from the system in accordance with relevant codes of practice and industry standards
- 3.7 Power and control circuit wiring is checked to ensure it conforms to circuit diagram specifications and system is electrically safe to energise in accordance with relevant codes of practice and industry standards
4 Install ducted split air conditioning systems
- 4.1 Major components are securely mounted in the locations identified by the documentation or the supervisor in accordance with workplace procedures
- 4.2 Flexible ductwork, associated fittings and flow control devices are installed according to specifications ensuring all connections are in accordance with workplace procedures and industry standards
- 4.3 Refrigerant pipework and associated components are installed ensuring all connections and tube cleanliness is maintained at all times in accordance with workplace procedures and manufacturer specifications
- 4.4 Pressure testing of the installed components and pipe work is conducted to the required level for the type of refrigerant being used in accordance with relevant industry standards and workplace procedures
- 4.5 Leaks are located and rectified employing appropriate methods in accordance with industry standards and codes of practices
- 4.6 Air conditioning system is evacuated to remove moisture and other contaminates in accordance with industry standards, relevant codes of practices and workplace procedures
- 4.7 Vacuum drop test is carried out to verify all moisture and other contaminants have been removed from the system in accordance with industry standards, relevant codes of practices and workplace procedures
- 4.8 Power and control circuit wiring is checked to ensure it conforms to circuit diagram specifications and system is electrically safe to energise in accordance with industry standards, relevant codes of practices and workplace procedures
5 Commission air conditioning systems
- 5.1 Air conditioning system is charged with the appropriate type and quantity of refrigerant in accordance with industry standards, relevant codes of practices and workplace procedures
- 5.2 Measurements are obtained and recorded to confirm that the refrigerant charge is optimal in accordance with the system's design and manufacturer specifications
- 5.3 Control devices installed in the air stream for air flow quantity and distribution control are adjusted in accordance with the system's design and manufacturer specifications
- 5.4 Measurements are obtained and recorded to confirm that air flow quantities and distribution is optimal in accordance with the system's design and manufacturer specifications
6 Locate and rectify faults and carry out maintenance on air conditioning systems
- 6.1 Fault diagnosis is carried out in accordance with industry standards, relevant codes of practices and workplace procedures
- 6.2 Fault-finding and rectification processes are carried out effectively without damage to the system and components in accordance with relevant codes of practice, industry standards and workplace procedures
- 6.3 System is returned to an operational state in accordance with workplace procedures and manufacturer specifications
- 6.4 Components that require routine maintenance are identified and regularly maintained in accordance with relevant timeframes, industry standards and workplace procedures
7 Complete work and report activities
- 7.1 WHS/OHS risk control measures continue to be applied in accordance with workplace procedures
- 7.2 Worksite and equipment are cleaned and made safe in accordance with workplace procedures
- 7.3 Refrigerant usage is recorded in accordance with relevant industry regulations and codes of practice
- 7.4 Supervisor is notified of task completion in accordance with workplace procedures