Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Draft and layout underground distribution extension
Draft and layout underground distribution extension
Unit of competency
National Code
UETDRDS026
UETDRDS026
State Code
OED93
OED93
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
17/02/2023
Field of Education
031301 - Electrical Engineering
Original Release Date
17/02/2023
Nominal Hours
35
Description
This unit includes the skills and knowledge required to draft and layout underground distribution extensions in the electricity supply industry (ESI).It includes principles and installation procedures of underground cables and associated infrastructure.It also includes use of manuals, system diagrams, plans and drawings, fundamentals of surveying and computer-aided drafting.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may also apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to draft and layout underground distribution extension
- 1.1 Project requirements are determined
- 1.2 Draft and layout specifications are determined in accordance with workplace requirements
- 1.3 Tools, equipment and personal protective equipment (PPE) required for site inspections are determined, obtained and confirmed in working order
- 1.4 Requirements for site inspections are determined in accordance with workplace requirements
- 1.5 Work is prioritised and sequenced for completion in accordance with workplace requirements
2 Draft and layout underground distribution extension
- 2.1 Site inspection is performed
- 2.2 Underground distribution extension is drafted and laid out in accordance with workplace requirements
- 2.3 Sustainable energy principles are used to evaluate and determine best outcomes in accordance with workplace requirements
- 2.4 Environmental sustainability principles are used to evaluate and determine best outcomes in accordance with workplace requirements
- 2.5 Draft and layout are checked for compliance against legislation, regulations, standards and codes of practice
- 2.6 Health and safety risks are identified and minimised or eliminated by using safety and control measures in the draft and layout process
- 2.7 Quality checks of work are undertaken in accordance with workplace requirements
3 Complete work and documentation
- 3.1 Completed work is checked against project and workplace requirements
- 3.2 Work records, reports and documentation are completed, approved and appropriate personnel notified in accordance with workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODM84 | UETDRDS011 | Draft and layout a power system underground distribution extension | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHY4 | UET60222 | Advanced Diploma of ESI - Power Systems | Qualification |