Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install stormwater systems

Install stormwater systems

Unit of competency
National Code
RIICPL302D
State Code
WH103
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
040327 - Plumbing
Original Release Date
27/05/2014
Nominal Hours
36
Description
This unit describes a participant’s skills and knowledge required to install stormwater systems in Civil Construction.This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for installing stormwater systems
  • 1.1 Access, interpret and apply stormwater systems documentation and ensure the work activity is compliant
  • 1.2 Obtain, interpret, clarify and confirm work/plans/specifications requirements
  • 1.3 Identify, obtain and implement traffic signage requirements
  • 1.4 Select, and check for faults, equipment/tools for work activities
  • 1.5 Identify, confirm and apply environmental protection requirements
  • 1.6 Select and wear personal protective equipment appropriate for work activities
  • 1.7 Identify, address and report potential hazards and risks
  • 1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Set out and excavate
  • 2.1 Prepare work area and materials
  • 2.2 Determine and apply dewatering requirements
  • 2.3 Determine location, alignment direction, level and grade of stormwater system
  • 2.4 Set out works to specification
  • 2.5 Advise plant operator of excavation requirements and monitor levels
  • 2.6 Install stormwater system bedding
3. Install stormwater system
  • 3.1 Lower pipes and place in position
  • 3.2 Join pipes correctly
  • 3.3 Continuously check alignment level and grade continuously for conformance
  • 3.4 Position side support and/or overlay beside the pipes
  • 3.5 Fit inspection openings
  • 3.6 Monitor backfill procedure and ensure work is completed to requirements
4. Test stormwater system
  • 4.1 Perform stormwater system test procedures establishing functionality and serviceability
  • 4.2 Record and report test results
5. Clean up
  • 5.1 Clear work area and dispose of or recycle materials
  • 5.2 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaces
State Code National Code Title Type
WB534 RIICPL302A Install stormwater systems Unit of competency
Replaced By
State Code National Code Title Type
OCX83 RIICPL302E Install stormwater systems Unit of competency