Unit of competency Outline
Date retreived
22/07/2026 10:15 AM AWST
22/07/2026 10:15 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply finishes to cork flooring
Apply finishes to cork flooring
Unit of competency
National Code
MSFFL3046
MSFFL3046
State Code
WI403
WI403
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
20
Description
This unit of competency covers selecting coating systems appropriate for the job, preparing for the work and applying the selected finishes to cork flooring.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Identify and prepare for work requirements
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to the application of finishes are verified and complied with
- 1.2 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- 1.3 Coating material is selected with regard to durability, longevity, aesthetics, manufacturer recommendations and client expectations
- 1.4 Selected coating materials are assessed as being compatible with each other, with the surface to be finished and with manufacturer recommendations
- 1.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 1.6 Surface to be finished is inspected and assessed as being ready for coating
- 1.7 Work sequence is planned to ensure efficiency and quality of application
- 1.8 WHS requirements, including isolation, ventilation and other personal protection needs, are observed throughout the work
2 Apply finishing system
- 2.1 Ventilation is checked before chemical fumes are released, and all WHS requirements are met, including use of personal protective equipment
- 2.2 Environmental protection regulations are complied with
- 2.3 Coating material is applied in accordance with manufacturer recommendations
- 2.4 Recommended drying times between coats are observed
- 2.5 Buffing or sanding between coats, where required, is carried out according to manufacturer recommendations
- 2.6 Final finish meets the requirements of the job
3 Complete housekeeping
- 3.1 Unused materials are stored or recycled as required
- 3.2 Tools and equipment are cleaned and stored appropriately
- 3.3 Work area is cleaned and rubbish disposed of appropriately
- 3.4 Workplace documentation is completed
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8596 | LMFFL3605A | Apply finishes to cork flooring | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAJ30 | MSFFL3099 | Apply finishes to cork flooring | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J736 | MSF30813 | Certificate III in Flooring Technology | Qualification |