Unit of competency Outline
Date retreived
22/07/2026 7:51 PM AWST
22/07/2026 7:51 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Fabricate and install roof drainage components
Fabricate and install roof drainage components
Unit of competency
National Code
CPCPRF3022A
CPCPRF3022A
State Code
WF951
WF951
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040327 - Plumbing
Original Release Date
20/06/2014
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to fabricate and install roof drainage components and rainwater goods for commercial and residential roof systems.
Notes
Elements and Performance Criteria
1 Prepare for work.
- 1.1 Plans and specifications are obtained and confirmed by site inspection.
- 1.2 Work health and safety (WHS) and environmental requirements associated with fabricating and installing roof drainage componentsare adhered to throughout the work.
- 1.3 Quality assurance requirements are identified and adhered to according to workplace requirements.
- 1.4 Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authorities’ requirements.
- 1.5 Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- 1.6 Work area is prepared to support the fabrication and installation of roof drainage components.
2 Identify installation requirements.
- 2.1 Rainwater management system is identified as suitable for preventing rainwater penetration into building structure.
- 2.2 Roof drainage componentsrequired for installation are identified from drawings and specifications.
- 2.3 Fabrication patternsare drawn based on design and freehand sketch of roof drainage.
- 2.4 Quantity, type and sizing of drainage components, rainwater materials and accessories required are calculated from drawings and specifications in compliance with relevant Australian standards, local authorities' requirements and relevant information.
- 2.5 Box gutter support system is fabricated according to relevant Australian standard.
- 2.6 Materialsare identified from drawings, specifications, patterns and/or calculations and ordered and collected according to workplace procedures.
- 2.7 Materials and equipment are checked for compliance with docket and order form and for acceptable condition, and faults are reported.
3 Fabricate roof drainage components.
- 3.1 Method of fabrication, tools and machinery requirements are determined to suit job requirements.
- 3.2 Materials are marked out from drawings to fabricate roof drainage components.
- 3.3 Roof drainage components are fabricated in compliance with relevant Australian standards, drawings, specifications and site measurements.
- 3.4 Components are marked, packaged and prepared for delivery and installation according to workplace procedures.
4 Set out and install roof drainage components.
- 4.1 Components are checked for compliance with docket and order form and for acceptable condition, and arranged in order of installation.
- 4.2 Roof drainage components are set out to comply with job specifications and site measurements.
- 4.3 Structural supports are installed in compliance with job specifications.
- 4.4 Roof drainage components are jointed in compliance with job specifications and relevant Australian standards.
- 4.5 Roof drainage system is installed according to relevant Australian standards and job specifications.
- 4.6 Sustainability principles and concepts are applied throughout the installation.
- 4.7 System is performance tested for satisfactory installation and remedied.
5 Clean up.
- 5.1 Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
- 5.2 Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and workplace procedures.
- 5.3 Documentation is completed according to workplace requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
hazardous materials and substances
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
environment policy
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.
Tools and equipment may include:
drawing equipment
fall protection equipment
hand and power tools
ladders
lifting and load shifting equipment, including:
chain blocks
cranes
elevated work platforms
forklifts
hand trolleys
hoists and jacks
restricted height scaffolds
rollers
measuring equipment.
Roof drainage components may include:
box gutters
downpipes
eaves gutters
gutter support system
parapet gutters
rainwater heads
siphonic drainage downpipe systems and materials
standing overflows
sumps
valley gutters.
Fabrication patterns may be:
actual size or scaled.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
building codes
WHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to fabricating and installing roof drainage components
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Materials for fabricating and installing roof drainage components may include:
fibreglass
laminate
metal gutter and structural supports
metal rainwater goods
metal roof covers of concealed or pierce fixed types
metal self drilling and tapping screws
plastic building sheets for walls and roofs
polyethylene
PVC sheet goods
rivets and sealants
thermal insulation of reflective foil
roof tiles.
Fault reporting:
may be written or verbal
is to be according to company's workplace procedures.
Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include:
rainwater harvesting
efficient energy use
efficient use and recycling of material
correct handling of hazardous materials
disposing of waste material to ensure minimal environmental impact
selecting appropriate components to ensure minimal environmental impact.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
hazardous materials and substances
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
environment policy
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.
Tools and equipment may include:
drawing equipment
fall protection equipment
hand and power tools
ladders
lifting and load shifting equipment, including:
chain blocks
cranes
elevated work platforms
forklifts
hand trolleys
hoists and jacks
restricted height scaffolds
rollers
measuring equipment.
Roof drainage components may include:
box gutters
downpipes
eaves gutters
gutter support system
parapet gutters
rainwater heads
siphonic drainage downpipe systems and materials
standing overflows
sumps
valley gutters.
Fabrication patterns may be:
actual size or scaled.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
building codes
WHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to fabricating and installing roof drainage components
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Materials for fabricating and installing roof drainage components may include:
fibreglass
laminate
metal gutter and structural supports
metal rainwater goods
metal roof covers of concealed or pierce fixed types
metal self drilling and tapping screws
plastic building sheets for walls and roofs
polyethylene
PVC sheet goods
rivets and sealants
thermal insulation of reflective foil
roof tiles.
Fault reporting:
may be written or verbal
is to be according to company's workplace procedures.
Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include:
rainwater harvesting
efficient energy use
efficient use and recycling of material
correct handling of hazardous materials
disposing of waste material to ensure minimal environmental impact
selecting appropriate components to ensure minimal environmental impact.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, relevant Australian standards and specifications to the fabrication and installation of roof drainage components
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications of a roof-management system for a roofed area of at least 4 square metres, determining the requirements, selecting, fabricating and installing:
valley gutter
box gutter, to include a sump or rainhead and overflow
eaves gutter and downpipe system, complete with gutter supports, expansion joints and caps
ensuring:
application of sustainability principles and concepts throughout the installation
correct identification of requirements and details of proposed installation
correct fit of the completed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, relevant Australian standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, relevant Australian standards and specifications to the fabrication and installation of roof drainage components
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications of a roof-management system for a roofed area of at least 4 square metres, determining the requirements, selecting, fabricating and installing:
valley gutter
box gutter, to include a sump or rainhead and overflow
eaves gutter and downpipe system, complete with gutter supports, expansion joints and caps
ensuring:
application of sustainability principles and concepts throughout the installation
correct identification of requirements and details of proposed installation
correct fit of the completed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, relevant Australian standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7485 | CPCPRF3012A | Fabricate and install roof drainage components | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCM99 | CPCPRF3022 | Fabricate and install roof drainage systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J485 | CPC20812 | Certificate II in Metal Roofing and Cladding | Qualification |
| J787 | CPC32413 | Certificate III in Plumbing | Qualification |
| J491 | CPC32412 | Certificate III in Plumbing | Qualification |
| J788 | CPC32513 | Certificate III in Plumbing (Mechanical Services) | Qualification |
| J493 | CPC32612 | Certificate III in Roof Plumbing | Qualification |