Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install patterned parquetry flooring
Install patterned parquetry flooring
Unit of competency
National Code
LMFFL3507A
LMFFL3507A
State Code
W8585
W8585
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
16/06/2009
Field of Education
040321 - Floor Coverings
Original Release Date
16/06/2009
Nominal Hours
60
Description
This unit specifies the outcomes required to prepare, set out, cut and install patterned parquetry flooring in domestic and commercial sites.
Notes
Elements and Performance Criteria
1. Prepare for work
- 1.1. Applicable legislative, OHS and organisational requirements relevant to the installation of patterned parquetry are verified and complied with
- 1.2. Workplace health and safety requirements, including personal protection needs, are observed throughout the work
- 1.3. Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- 1.4. Sub-floor condition is assessed for suitability for installation of patterned parquetry flooring consistent with Australian Standards, industry standards and manufacturer recommendations
- 1.5. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 1.6. Skirting boards or cover trims are removed or undercut if required and stored for refitting
- 1.7. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
2. Set out patterned parquetry flooring
- 2.1. Patterned parquetry flooring are acclimatised according to manufacturer recommendations
- 2.2. Patterned parquetry flooring for fixing are organised and used in accordance with relevant safety management requirements
- 2.3. Adhesives and edge strips are prepared for use as required
- 2.4. Area to be covered is measured, working lines and starting point are established
3. Layout and cut parquetry patterns
- 3.1. Instructions and sequence for laying and fixing are followed
- 3.2. Appropriate underlay is laid according to manufacturer recommendations
- 3.3. Patterned parquetry flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins
- 3.4. The aesthetics of the materials are maximised including matching grains and colours
- 3.5. Cutting jigs for pattern components are measured and set for repetitive use
- 3.6. Parquetry blocks are set in appropriate jig and cut
4. Install patterned parquetry
- 4.1. Adhesives and edge strips/accessories are prepared for use as required
- 4.2. Adhesives are used following workplace procedures
- 4.3. Fixing methods and equipment are used following manufacturer recommendations
- 4.4. Parquetry is installed and fixed to produce required pattern
- 4.5. Appropriate field and perimeter expansion joints are allowed
- 4.6. Skirting boards or cover trims are fitted/refitted and finished
- 4.7. Finished job is inspected and any imperfections are rectified following workplace procedures
5. Complete housekeeping
- 5.1. Off-cuts or leftover materials are collected and removed following workplace procedures
- 5.2. Tools and equipment are cleaned, maintained and stored
- 5.3. Work area is cleaned and waste material is removed and disposed of safely
- 5.4. Documentation/reporting is completed following workplace procedures
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Legislative requirements
are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage
OHS requirements
are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling, including lifting and carrying
Organisational requirements
may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)
Instructions
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to reporting and communications
Manufacturer instructions for the use of equipment and materials
Sub-floor assessment
is to include testing for moisture content, expansion, rot, structural strength, smoothness and plane
Tools and equipment
are to include drop saw, hand saw, radial arm saw, router, stringline, chalk and chalk line, square, notched trowel, moisture meter, straight edge and template
may include plunge saw, jig saw, bench saw, band saw, circular saw, planer and laser level
Materials
may include underlays, adhesives, timber fillers, skirting boards, cover trims and accessories
Adhesives
may include PVAs, epoxys and polyurethane elastamerics
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Legislative requirements
are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage
OHS requirements
are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling, including lifting and carrying
Organisational requirements
may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)
Instructions
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to reporting and communications
Manufacturer instructions for the use of equipment and materials
Sub-floor assessment
is to include testing for moisture content, expansion, rot, structural strength, smoothness and plane
Tools and equipment
are to include drop saw, hand saw, radial arm saw, router, stringline, chalk and chalk line, square, notched trowel, moisture meter, straight edge and template
may include plunge saw, jig saw, bench saw, band saw, circular saw, planer and laser level
Materials
may include underlays, adhesives, timber fillers, skirting boards, cover trims and accessories
Adhesives
may include PVAs, epoxys and polyurethane elastamerics
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing patterned parquetry
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including the use of personal protective equipment
Establish and maintain appropriate ventilation
Follow work instructions, operating procedures and inspection practices to:
prevent damage to goods, equipment and products
minimise the risk of injury to self and others
achieve a final finish in accordance with Australian Standards and accepted industry practices
Complete a minimum of two patterned parquetry floors, which are to include at least:
one personally designed pattern
one patterned floor, herringbone pattern with a two patterned border
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment
Context of, and specific resources for assessment
The application of competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements
The following resources should be made available:
a realistic patterned parquetry installation requirement
workplace location or simulated workplace
materials and equipment relevant to the installation of patterned parquetry
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing patterned parquetry
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including the use of personal protective equipment
Establish and maintain appropriate ventilation
Follow work instructions, operating procedures and inspection practices to:
prevent damage to goods, equipment and products
minimise the risk of injury to self and others
achieve a final finish in accordance with Australian Standards and accepted industry practices
Complete a minimum of two patterned parquetry floors, which are to include at least:
one personally designed pattern
one patterned floor, herringbone pattern with a two patterned border
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment
Context of, and specific resources for assessment
The application of competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements
The following resources should be made available:
a realistic patterned parquetry installation requirement
workplace location or simulated workplace
materials and equipment relevant to the installation of patterned parquetry
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W0208 | LMFFC3030A | Install parquetry flooring | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WI392 | MSFFL3035 | Install patterned parquetry flooring | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W506 | LMF31208 | Certificate III in Flooring Technology | Qualification |