Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain evaporative air cooling systems
Install and maintain evaporative air cooling systems
Unit of competency
National Code
CPCPMS3040A
CPCPMS3040A
State Code
WF923
WF923
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
20/06/2014
Nominal Hours
12
Description
This unit of competency specifies the outcomes required to install and maintain evaporative air cooling systems.
Notes
Elements and Performance Criteria
1 Prepare for work.
- 1.1 Plans and specifications are obtained.
- 1.2 Work health and safety (WHS) and environmental requirements installing evaporative air cooling systems are adhered to throughout the work.
- 1.3 Quality assurance requirements are identified and adhered to according to workplace requirements.
- 1.4 Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authorities’ requirements.
- 1.5 Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- 1.6 Work area is prepared to support efficient installation and maintenance of evaporative air cooling systems.
2 Identify installation requirements.
- 2.1 Quantity and type of materials required for installation are determined from plans and specifications.
- 2.2 Materialsare identified, ordered and collected according to workplace procedures.
- 2.3 Requirements for other services are identified and connection is planned according to regulatory requirements.
- 2.4 Materials and equipment are checked for compliance with standards, and docket and order form, and for acceptable condition.
3 Install and test unit.
- 3.1 Installation is set out in compliance with plans, specifications and relevant information.
- 3.2 Existing services are located and installation process is adjusted accordingly to avoid any disturbance.
- 3.3 Preparatory work, including installation of piping and isolating valve and roof penetration and flashing, is carried out to specifications without unnecessary damage to surrounding structures or environment.
- 3.4 Structural supports are installed in compliance with plans and specifications and National Construction Code.
- 3.5 Ducting and control panels are installed according to authorities' requirements, plans, specifications and manufacturer recommendations.
- 3.6 System is installed to plans, specifications and manufacturer recommendations.
- 3.7 Installation is tested according to specification, code or standards for the application.
- 3.8 Sustainability principles and concepts are applied throughout the installation and maintenance process.
- 3.9 Test results are documented in required format.
4 Maintain unit.
- 4.1 Service and maintenance requirements are identified from manufacturer specifications or authorities' requirements.
- 4.2 Replacement components are checked and fitted periodically and as required according to specification.
- 4.3 Other services to the unitand maintenance operations are conducted, observing manufacturer and authorities' requirements.
5 Clean up.
- 5.1 Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice, and job specification.
- 5.2 Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and workplace procedures.
- 5.3 Documentation is completed according to workplace requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
hazardous materials and substances
identifying and testing for electrical hazards
manual handling
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements may include:
clean-up protection
waste management.
Quality assurance requirements may include:
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.
Tools and equipment may include:
hand and power tools
ladders
lifting and load shifting equipment, including:
chain blocks
elevated work platforms
forklifts
hand trolleys
hoists and jacks
rollers
scaffolds
measuring equipment
roof safety equipment
test equipment.
Materials may include:
control panels
diffusers
ducting materials
evaporative air cooling systems
grills
insulation.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
WHS and environmental requirements
plumbing regulations
relevant Australian standards and building codes
safe work procedures relating to installing evaporative cooling systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Preparatory work that may need to be completed includes:
ensuring structural integrity of roof
installing piping and isolating valve
installing piping and isolating valve in roof cavity
installing plinths
installing structural supports
installing roof penetration and flashing for the unit.
Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include:
efficient use of material
correct handling of hazardous materials
appropriate recycling of material
efficient water use
efficient energy retention
reuse of waste water
selecting appropriate products, components and material to ensure minimal environmental impact.
Other services to units may include:
electrical connections
water supply.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
hazardous materials and substances
identifying and testing for electrical hazards
manual handling
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements may include:
clean-up protection
waste management.
Quality assurance requirements may include:
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.
Tools and equipment may include:
hand and power tools
ladders
lifting and load shifting equipment, including:
chain blocks
elevated work platforms
forklifts
hand trolleys
hoists and jacks
rollers
scaffolds
measuring equipment
roof safety equipment
test equipment.
Materials may include:
control panels
diffusers
ducting materials
evaporative air cooling systems
grills
insulation.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
WHS and environmental requirements
plumbing regulations
relevant Australian standards and building codes
safe work procedures relating to installing evaporative cooling systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Preparatory work that may need to be completed includes:
ensuring structural integrity of roof
installing piping and isolating valve
installing piping and isolating valve in roof cavity
installing plinths
installing structural supports
installing roof penetration and flashing for the unit.
Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include:
efficient use of material
correct handling of hazardous materials
appropriate recycling of material
efficient water use
efficient energy retention
reuse of waste water
selecting appropriate products, components and material to ensure minimal environmental impact.
Other services to units may include:
electrical connections
water supply.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, standards and specifications to install evaporative units
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications, installing an evaporative air cooling system on a roof, including flashing the roof penetration; installing a plenum box and duct work to three diffusers; connecting cold water to an isolation valve within 1 metre of the appliance; connecting and completing installation testing, and commissioning its operation, ensuring:
application of sustainability principles and concepts
correct identification of requirements and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, standards and specifications to install evaporative units
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications, installing an evaporative air cooling system on a roof, including flashing the roof penetration; installing a plenum box and duct work to three diffusers; connecting cold water to an isolation valve within 1 metre of the appliance; connecting and completing installation testing, and commissioning its operation, ensuring:
application of sustainability principles and concepts
correct identification of requirements and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7478 | CPCPMS3020A | Install and maintain evaporative air cooling systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCN53 | CPCPMS3040 | Install and commission evaporative air cooling systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J787 | CPC32413 | Certificate III in Plumbing | Qualification |
| J788 | CPC32513 | Certificate III in Plumbing (Mechanical Services) | Qualification |