Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Run Up a Steam Turbine
Run Up a Steam Turbine
Unit of competency
National Code
UEPOPS411A
UEPOPS411A
State Code
S5254
S5254
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/05/2011
Field of Education
030717 - Plant And Machine Operations
Original Release Date
31/05/2011
Nominal Hours
40
Description
1)
This unit deals with the skills and knowledge required to conduct a steam turbine run up to a stable operating condition.
This unit deals with the skills and knowledge required to conduct a steam turbine run up to a stable operating condition.
Notes
Elements and Performance Criteria
1 Plan and prepare work
- 1.1 Safety issues are identified to comply with enterprise/site requirements
- 1.2 Work requirements are identified from relevant personnel and documentation
- 1.3 Pre-operational checks are carried out on plant according to manufacturer's recommendations and site requirements
- 1.4 The turbine running up and loading schedule are ascertained from relevant documentation and in accordance with enterprise/site requirements
- 1.5 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training.
2 Operate plant
- 2.1 Plant is operated in accordance with enterprise and manufacturer's operating procedures
- 2.2 Plant is monitored and observed to detect deviations from normal operating conditions
- 2.3 Corrective actions are taken to rectify abnormalities in accordance with manufacturer's and enterprise/site procedures
3 Test plant operation
- 3.1 Tests are performed in accordance with defined procedures applicable to the operational test
- 3.2 System and plant are observed for correct operational response
- 3.3 Corrective action is taken when response is not in accordance with documentation, plant integrity or personnel safety requirements
- 3.4 Plant is returned to required operational status upon completion of test
4 Analyse system faults
- 4.1 Causes of abnormal plant operating conditions are identified by analysing the technical and operational information in a logical and sequential manner
- 4.2 Corrective action taken is in accordance with enterprise/site procedures
- 4.3 Plant integrity and personnel safety is maintained through consultation with appropriate personnel, and reference to plant, technical and operational documentation
- 4.4 Appropriate personnel are notified when defects are detected
5 Complete documentation
- 5.1 Documentation is updated and plant problems, movements, abnormalities and status are reported and logged in accordance with enterprise/site procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| M1652 | UTPNEG209A | Manage a steam turbine run up | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE397 | UEPOPS411B | Run up a steam turbine | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S508 | UEP50106 | Diploma of ESI Generation (Systems Operations) | Qualification |
| S503 | UEP40106 | Certificate IV in ESI Generation (Systems Operations) | Qualification |