Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Place and compact concrete

Place and compact concrete

Unit of competency
National Code
RIICRC316D
State Code
WH132
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
030901 - Construction Engineering
Original Release Date
27/05/2014
Nominal Hours
170
Description
This unit describes a participant’s skills and knowledge required to place and compact concrete in Civil Construction.This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to place and compact concrete
  • 1.1 Access, interpret and apply concrete compaction documentation and ensure the work activity is compliant
  • 1.2 Obtain, read, interpret, clarify and confirm work requirements
  • 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
  • 1.4 Select and wear correct personal protective equipment appropriate for work activities
  • 1.5 Identify, obtain, confirm and implement signage requirements
  • 1.6 Select and check for faults all plant, tools and equipment to carry out tasks
2. Define and prepare work area
  • 2.1 Check location of concrete placement is determined from plans and specifications and location for placement is free of debris and waste
  • 2.2 Maintain safe working area around pour location using barriers and signage
  • 2.3 Locate plant, tools and equipment to suit planned placement
  • 2.4 Undertake pre-pour inspections before concrete arrives on site
3. Place concrete and compact
  • 3.1 Place concrete in horizontal layers into location to levels indicated by markers, level pegs or lines
  • 3.2 Minimise height of vertical drop of concrete to avoid segregation of concrete materials
  • 3.3 Consolidate poured concrete during process using approved compaction or vibration method
  • 3.4 Check finished levels against datum using levelling device
4. Screed/level concrete
  • 4.1 Screed concrete to correct levels and grades using straight edged tool/formwork mounted screed
5. Clean up
  • 5.1 Clear work area and dispose, reuse or recycle materials
  • 5.2 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaces
State Code National Code Title Type
WC335 RIICRC316 Place and compact concrete Unit of competency
Replaced By
State Code National Code Title Type
OCY55 RIICRC316E Place and compact concrete Unit of competency