Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Cut over new and replacement network equipment
Cut over new and replacement network equipment
Unit of competency
National Code
ICTTEN5061A
ICTTEN5061A
State Code
D3482
D3482
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/06/2014
Field of Education
031307 - Communications Technologies
Original Release Date
12/06/2014
Nominal Hours
120
Description
This unit describes the performance outcomes, skills and knowledge required to effectively cut over and test telecommunications network equipment in a short period of time.It includes processes for checking plans, obtaining equipment and supplies, testing procedures and administrative tasks.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.
Notes
Elements and Performance Criteria
1. Plan the cut over strategy
- 1.1. Determine the nature and scope of the cut over activity from appropriate personnel
- 1.2. Prepare a cut over management plan in agreement with appropriate personnel
- 1.3. Obtain outage management plan if available otherwise prepare a contingency plan to ensure the system integration proceeds according to plan
- 1.4. Notify alarm management centre of action planned and obtain authority to proceed
- 1.5. Notify customers affected by the outage of time and likely duration
2. Cut over and test equipment into service
- 2.1. Perform cut over activities in a safe manner with minimal interruption to service and according to the cut over management plan
- 2.2. Conduct tests specified in the cut over plan according to technical manuals and specifications
- 2.3. Record and assess test results and ensure problems identified during cut over are rectified or escalated according to enterprise procedures
- 2.4. Analyse alarms for fault conditions in conjunction with network management centre
- 2.5. Enact contingency plans in the event of major problems during cut over
3. Complete administrative tasks
- 3.1. Complete test result sheets and hand over to operational personnel according to enterprise requirements
- 3.2. Ensure site is cleaned and ready for operational staff
- 3.3. Complete work documentation and administrative tasks and forward to the appropriate area according to enterprise policy
- 3.4. Notify project completion to appropriate personnel and obtain sign off
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Appropriate personnel may include:
network manager
planning manager
project consultant
project manager
vendor contact.
Cut over management plan may include:
additional resources
cut over activities:
address interoperability issues
install new system and equipment
test new system and equipment
integration processes
rapid deployment strategy
risks
roles and responsibilities of personnel
software tools
system outage
test hardware
vendor input
vendor support
vendor warranty.
Outage management plan may include:
alternate transmission path
contingency plan
customers affected
cut over plan
emergency communications
outage duration
outage times
parts of network affected
system backup
systems affected.
Contingency plan may include:
network operations notification
redundancy backup solution
system expert on standby
vendor on standby.
Customers may include:
contractor
end users
other divisions of the company
small, medium or large organisations
vendor or supplier
wholesale service providers.
Tests may include:
alarms
end to end
performance:
bit error rate (BER)
data transmission
quality of service (QoS)
traffic flow:
congestion
delay
latency
packet loss.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Appropriate personnel may include:
network manager
planning manager
project consultant
project manager
vendor contact.
Cut over management plan may include:
additional resources
cut over activities:
address interoperability issues
install new system and equipment
test new system and equipment
integration processes
rapid deployment strategy
risks
roles and responsibilities of personnel
software tools
system outage
test hardware
vendor input
vendor support
vendor warranty.
Outage management plan may include:
alternate transmission path
contingency plan
customers affected
cut over plan
emergency communications
outage duration
outage times
parts of network affected
system backup
systems affected.
Contingency plan may include:
network operations notification
redundancy backup solution
system expert on standby
vendor on standby.
Customers may include:
contractor
end users
other divisions of the company
small, medium or large organisations
vendor or supplier
wholesale service providers.
Tests may include:
alarms
end to end
performance:
bit error rate (BER)
data transmission
quality of service (QoS)
traffic flow:
congestion
delay
latency
packet loss.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
develop a contingency plan
implement a cut over plan and an outage plan
apply enterprise escalation and outage procedures
cut over and test network equipment within an industry acceptable time period.
Context of and specific resources for assessment
Assessment must ensure:
a network and equipment for cut over
equipment currently used in industry
systems manuals, specifications and enterprise policy.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of the candidate undertaking cut over preparations and processes
review of cut over test results and records completed by the candidate
oral or written questioning to assess required knowledge.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICTTEN5060A Integrate new systems and equipment into the telecommunications network.
Aboriginal people and other people from a non-English speaking background may have second language issues.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.
In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.
Where applicable, physical resources should include equipment modified for people with special needs.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
develop a contingency plan
implement a cut over plan and an outage plan
apply enterprise escalation and outage procedures
cut over and test network equipment within an industry acceptable time period.
Context of and specific resources for assessment
Assessment must ensure:
a network and equipment for cut over
equipment currently used in industry
systems manuals, specifications and enterprise policy.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of the candidate undertaking cut over preparations and processes
review of cut over test results and records completed by the candidate
oral or written questioning to assess required knowledge.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICTTEN5060A Integrate new systems and equipment into the telecommunications network.
Aboriginal people and other people from a non-English speaking background may have second language issues.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.
In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.
Where applicable, physical resources should include equipment modified for people with special needs.