Unit of competency Outline
Information current as of
20/10/2026 4:15 PM AWST
20/10/2026 4:15 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Build with earth, straw and reclaimed materials
Build with earth, straw and reclaimed materials
Unit of competency
National Code
AHCPER317
AHCPER317
State Code
BAM81
BAM81
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
12/01/2017
Original Release Date
27/06/2016
Nominal Hours
55
Field of Education
040301 - Building Science And Technology
Description
This unit of competency describes the skills and knowledge required to build with earth, straw and reclaimed materials, using techniques that use local earth, straw and rock, and that turn problems into solutions by converting waste, surplus or low embodied energy materials into solid and serviceable structures.All work is carried out to comply with workplace procedures. Individuals observe manufacturer’s specifications and follow operating instructions when using tools and equipment.This unit applies to individuals who take responsibility for their own work and for the quality of the work of others. They use discretion and judgement in the selection, allocation and use of available resources.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
General notes
N/A
Elements and Performance Criteria
1. Research building methods
- 1.1 Research appropriate building methods to decide which methods will be appropriate for the project
- 1.2 Review the availability of materials locally and their suitability for the chosen method
- 1.3 Consult experts and tradespeople to confirm suitability of chosen building method and materials
2. Prepare for the building project
- 2.1 Collect materials on site
- 2.2 Obtain labour support and engage experts where necessary
- 2.3 Clear the site and mark out the area
3. Build with earth, straw and reclaimed materials
- 3.1 Using the chosen method, commence building the structure
- 3.2 Use reclaimed materials where possible and ensure that they are structurally suitable
- 3.3 Use natural finishes and treatments where possible and appropriate
4. Limit and re-use surplus and waste materials
- 4.1 Ensure that the surplus or waste materials are stockpiled or stored for future re-use where possible
- 4.2 Demonstrate appropriate uses for all available materials and share and swap with other projects where possible
- 4.3 Limit the amount of waste material removed from the site and ensure that it goes to a new use rather than to landfill wherever possible
5. Check quality of work and clean-up site
- 5.1 Inspect quality of finished works and ensure the standard of the finished built structure is appropriate to the permaculture design drawings and specifications
- 5.2 Clean up debris from structure and site
- 5.3 Clean and store tools and equipment