Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform remote community network field switching to a given schedule
Perform remote community network field switching to a given schedule
Unit of competency
National Code
UETTDRIS35
UETTDRIS35
State Code
OBH77
OBH77
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
36
Description
This unit involves the skills and knowledge required to perform remote community network field switching to a given schedule in the electricity supply industry (ESI).It includes preparing, performing and completing low voltage (LV) field switching to a given schedule, using circuit breaking and isolation devices.It also includes using LV distribution systems in remote community situations, communicating with relevant personnel, isolating electrical equipment, paralleling circuits, proving the area is de-energised and earthed, issuing/accepting electrical permits and returning affected circuits to service.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare for LV field switching to a given schedule
- 1.1 Switching and work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed
- 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
- 1.3 Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for LV switching are obtained and confirmed for the purposes of the work to be performed
- 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- 1.5 Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
- 1.6 Relevant authorisation is obtained to perform work in accordance with job requirements and workplace procedures
- 1.7 Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- 1.8 Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
- 1.9 Traffic management plan is confirmed as being applied in accordance with workplace procedures
2 Carry out LV field switching to a given schedule
- 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures
- 2.2 Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
- 2.3 LV field switching to a given schedule are applied in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures
- 2.4 Communications with switching control officer are established and maintained throughout the isolation operation in accordance with workplace procedures
- 2.5 Electrical equipment, associated circuits, line/network or worksite to be switched, including paralleling, is isolated and proved de-energised using appropriate devices and earthed, where required, in accordance with requirements and established procedures
- 2.6 Unplanned events occurring during LV field switching to a given schedule are responded to in accordance with workplace procedures
- 2.7 Quality checks of work are undertaken in accordance with workplace procedures
3 Complete LV field switching to a given schedule
- 3.1 Completed work is checked against switching schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
- 3.2 WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
- 3.3 Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
- 3.4 Tools, equipment and surplus resources are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
- 3.5 Work records, reports and/or documentation are completed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD663 | UETTDRIS35A | Perform remote community network field switching to a given schedule | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODM59 | UETDRRC006 | Perform low voltage electricity network switching in a very remote community | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEW5 | UET30919 | Certificate III in ESI - Remote Community Utilities Worker | Qualification |