Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Build solid stonemasonry walls
Build solid stonemasonry walls
Unit of competency
National Code
CPCCST3016A
CPCCST3016A
State Code
WI760
WI760
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040309 - Bricklaying And Stonemasonry
Original Release Date
20/06/2014
Nominal Hours
30
Description
This unit of competency specifies the outcomes required to construct solid stone walls, including installing door and window frames, lintels, sills and other specified requirements such as damp-proofing.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Work instructions are obtained using relevant information, confirmed and applied for planningandpreparation purposes.
- 1.2 Work health and safety (WHS) requirements are followed according to safety plans and policies.
- 1.3 Signage and barricade requirements are identified and implemented.
- 1.4 Toolsandequipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and faults are rectified and reported before work begins.
- 1.5 Material quantity requirements are identified and calculated according to plans, specifications and qualityrequirements.
- 1.6 Materials appropriate to the work application are obtained, prepared, safely handled and located ready for use.
- 1.7 Environmentalrequirements are identified for the project according to environmental plans and statutoryandregulatoryauthority requirements, and are applied.
- 1.8 Scaffolding is erected as required according to job requirements, WHS regulations and relevant standards.
2 Set out stonework for walls.
- 2.1 Location and structural details of required stonework are determined from drawings and specifications.
- 2.2 Datum or level line is established according to job drawings and specifications.
- 2.3 Base stonework, below floor construction, is set out according to job drawings and specifications.
- 2.4 Load bearing stonework and piers are set out according to job drawings and specifications.
- 2.5 Stone walls are set out according to job drawings and specifications.
3 Construct base stonework for walls.
- 3.1 Mortar is mixed according to specifications and relevant standards.
- 3.2 Base stones are laid to set out, and constructed according to specifications and relevant standards.
4 Construct solid stone walls.
- 4.1 Stonework gauge is determined and set out using gauging rod to confirm correct course height.
- 4.2 Solid walls are constructed straight and true in plumb, line and level within set tolerance, according to job drawings and specifications and relevant standards.
- 4.3 Damp-proof courses are built in according to job drawings and specifications and relevant standards.
- 4.4 Openings are constructed and flashing installed according to job drawings and specifications.
- 4.5 Lintels are installed according to job drawings and specifications.
- 4.6 Expansion joints are formed according to locations specified on job drawings and requirements of relevant standards.
- 4.7 Weepholes, reinforcing, vermin proofing and wall flashings are built in, where required, according to job drawings and specifications.
- 4.8 Sills are cut where required and laid to line according to job drawings and specifications.
5 Position door and window frames in walls.
- 5.1 Windows are located and built into walls according to job drawings and specifications and protected from mortar droppings during construction.
- 5.2 Door jambs are located, built in and fixed to walls according to job drawings and specifications.
6 Finish stonework.
- 6.1 Joints to laid stonework are raked or ruled to correct depth according to job specifications.
- 6.2 Stonework is brushed down prior to drying using appropriate brushing tool.
7 Clean up.
- 7.1 Work area is cleared according to job requirements and specifications.
- 7.2 Tools and equipment are cleaned, maintained and stored.
- 7.3 Working platform or scaffolding is dismantled according to WHS regulations and relevant standards.
- 7.4 Unused materials are stored and waste material removed and disposed of according to environmental and workplace requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information may include:
diagrams or sketches
instructions issued by authorised organisational or external personnel
memos
regulatory and legislative requirements
current Australian standards relating to building solid stonemasonry walls
safe work procedures
safety data sheets (SDS)
signage
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planningandpreparation may include:
assessing conditions and hazards
determining work requirements and safety plans and policies
identifying equipment defects
inspecting work sites.
Work health and safetyrequirements must comply with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
restricted access barriers
traffic control
working at heights
work site visitors and the public
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Toolsandequipment may include:
air compressor and hoses
chalk line
concrete mixer
elevated work platforms (EWPs)
gin poles
hammers
jointing tools
material hoists
measuring rules or tapes
mortar boards
power drills, including impact
power grinders
power leads
rollers
rubber mallets
scaffolding
screw cramp and wedges
shear legs
shovels
spanners
spirit levels
squares
string lines
trowels.
Qualityrequirements may include:
attention to specifications of work
control of handling procedures
finishing of stone surfaces
quality of materials
relevant regulations, including:
Australian standards
internal organisational quality policy and standards
manufacturer specifications where specified
workplace operations and procedures.
Materials:
may include:
cultured artificial stone
Hebel
limestone
sandstone
may be:
regular
random regular
coursed
uncoursed.
Environmentalrequirements may include:
clean-up management
dust and noise control
vibration management
waste management.
Statutoryandregulatoryauthority includes:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Information may include:
diagrams or sketches
instructions issued by authorised organisational or external personnel
memos
regulatory and legislative requirements
current Australian standards relating to building solid stonemasonry walls
safe work procedures
safety data sheets (SDS)
signage
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planningandpreparation may include:
assessing conditions and hazards
determining work requirements and safety plans and policies
identifying equipment defects
inspecting work sites.
Work health and safetyrequirements must comply with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
restricted access barriers
traffic control
working at heights
work site visitors and the public
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Toolsandequipment may include:
air compressor and hoses
chalk line
concrete mixer
elevated work platforms (EWPs)
gin poles
hammers
jointing tools
material hoists
measuring rules or tapes
mortar boards
power drills, including impact
power grinders
power leads
rollers
rubber mallets
scaffolding
screw cramp and wedges
shear legs
shovels
spanners
spirit levels
squares
string lines
trowels.
Qualityrequirements may include:
attention to specifications of work
control of handling procedures
finishing of stone surfaces
quality of materials
relevant regulations, including:
Australian standards
internal organisational quality policy and standards
manufacturer specifications where specified
workplace operations and procedures.
Materials:
may include:
cultured artificial stone
Hebel
limestone
sandstone
may be:
regular
random regular
coursed
uncoursed.
Environmentalrequirements may include:
clean-up management
dust and noise control
vibration management
waste management.
Statutoryandregulatoryauthority includes:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or simulated workplace setting. Assessment shall be while tasks are undertaken either individually or as part of a team under limited supervision.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to select and use the appropriate materials, tools and equipment to set out and lay a solid stonemasonry wall with one corner and one opening containing a window or door with flashing over the openings. This solid stonemasonry structure must:
be a minimum of 6 metres in total length
be a minimum of 1.7 metres high
include a brick sill that is a minimum of 600 mm wide
incorporate base masonry work, including bearer piers and one stopped end.
The candidate must also provide evidence of:
applying organisational quality procedures and processes within the context of cavity and solid construction
applying safe handling practices when moving and placing stone
complying with WHS regulations applicable to workplace operations
complying with organisational policies and procedures
establishing and maintaining cavity between external and internal stone walls
identifying typical faults and problems that occur and taking necessary action to rectify them
communicating with others to ensure safe and effective workplace operations
giving particular attention to fixing stone to position and structure
using safe and effective procedures to lay a stone wall to alignment and plumb
selecting and using appropriate processes, tools and equipment to carry out tasks
selecting stone consistent with specification for material and colour
fixing stone to line, level and plumb.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment may include:
construction materials relevant to proposed activity
documentation relevant to task
tools, plant and equipment appropriate to installation processes
work location for stone construction activity.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using one or more of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Overview of assessment
This unit of competency could be assessed in the workplace or simulated workplace setting. Assessment shall be while tasks are undertaken either individually or as part of a team under limited supervision.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to select and use the appropriate materials, tools and equipment to set out and lay a solid stonemasonry wall with one corner and one opening containing a window or door with flashing over the openings. This solid stonemasonry structure must:
be a minimum of 6 metres in total length
be a minimum of 1.7 metres high
include a brick sill that is a minimum of 600 mm wide
incorporate base masonry work, including bearer piers and one stopped end.
The candidate must also provide evidence of:
applying organisational quality procedures and processes within the context of cavity and solid construction
applying safe handling practices when moving and placing stone
complying with WHS regulations applicable to workplace operations
complying with organisational policies and procedures
establishing and maintaining cavity between external and internal stone walls
identifying typical faults and problems that occur and taking necessary action to rectify them
communicating with others to ensure safe and effective workplace operations
giving particular attention to fixing stone to position and structure
using safe and effective procedures to lay a stone wall to alignment and plumb
selecting and using appropriate processes, tools and equipment to carry out tasks
selecting stone consistent with specification for material and colour
fixing stone to line, level and plumb.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment may include:
construction materials relevant to proposed activity
documentation relevant to task
tools, plant and equipment appropriate to installation processes
work location for stone construction activity.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using one or more of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| N0429 | BCF3059A | Cavity and solid construction | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCP44 | CPCCST3016 | Build solid stonemasonry walls | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J786 | CPC32313 | Certificate III in Stonemasonry (Monumental/Installation) | Qualification |