Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Undertake on-line replacement for existing pipeline systems
Undertake on-line replacement for existing pipeline systems
Unit of competency
National Code
RIICTT304A
RIICTT304A
State Code
WB505
WB505
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/01/2010
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
20/01/2010
Nominal Hours
68
Description
This unit covers the undertaking on-line replacement for existing pipeline systems in civil construction. It includes the planning and preparing for operations, site survey, rehabilitation and on-line replacement and cleaning up when undertaking the on-line replacement of pipes or pipe sections for the rehabilitation of existing services pipeline system.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1. Access, interpret and apply compliance documentation relevant to the on-line replacement for existing pipeline systems
- 1.2. Obtain, confirm and apply work instructions, including plans, specifications, quality requirements and operational details to the allotted task
- 1.3. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.4. Identify, obtain and implement signage requirements from the project traffic management plan
- 1.5. Ensure plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.6. Identify and confirm environmental protection requirements from the project environmental management plan, and apply to the allotted task
2. Perform site survey
- 2.1. Notify and obtain approval from property owners and occupiers for entry onto their property
- 2.2. Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities
- 2.3. Locate Underground utilities
- 2.4. Maintain system serviceability during rehabilitation works in accordance with asset owners' policies, allowable duration of service interruption, and project specifications
- 2.5. Survey and record existing site conditions
3. Initiate rehabilitation work
- 3.1. Prepare entry and exit pits where specified in accordance with site and OHS requirements
- 3.2. Follow confined space entry procedures
- 3.3. Monitor installation process and finished product to ensure conformity to the design requirements in accordance with manufacturer's specifications and project specifications
4. Undertake on-line replacement
- 4.1. Determine fault with the aid of plans, drawings, CCTV recordings or other mechanisms
- 4.2. Select on-line replacement method appropriate to the fault
- 4.3. Remove existing pipeline structure designated for replacement using tool selected
- 4.4. Pull into place new pipe structure
- 4.5. Install replacement components to comply with design requirements and manufacturer's specifications
- 4.6. Conduct curing process to comply with manufacturer's specifications where specified
- 4.7. Correctly secure and seal termination at ends of process in accordance with manufacturer's specifications
- 4.8. Open junctions for inspection and operation
- 4.9. Monitor installation process and finished product to ensure conformity to the design requirements in accordance with manufacturer's specifications
5. Clean up
- 5.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
- 5.2. Clean, check, maintain and store plant, tools and equipment
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation
may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Signage may include:
site safety signage
temporary signage for the benefit of motorists and pedestrians
barricades
traffic conditions signage
Tools and equipment may include:
pumps
compressors
hoses
tape measures
marking equipment
crow bars
spanners
adjustable
wrenches
shovels
picks
hammers (sledge/hand)
string lines
spirit levels
dumpy levels
theodolites
brooms
hacksaws
hand saws
electronic tracking devices
slings and cranes
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust
clean-up management
On-line replacement may include:
replacing existing pipes with the same size pipe
upsizing without trenching
being conducted while the pipeline remains operational
Pipe characteristics may include:
size
shape
material
joint type
depth
grade
rake condition
service off takes
on-line structures
Monitoring of replacement may include:
sounder
beacon
hand wired guidance system
magnetometry
Relevant compliance documentation
may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Signage may include:
site safety signage
temporary signage for the benefit of motorists and pedestrians
barricades
traffic conditions signage
Tools and equipment may include:
pumps
compressors
hoses
tape measures
marking equipment
crow bars
spanners
adjustable
wrenches
shovels
picks
hammers (sledge/hand)
string lines
spirit levels
dumpy levels
theodolites
brooms
hacksaws
hand saws
electronic tracking devices
slings and cranes
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust
clean-up management
On-line replacement may include:
replacing existing pipes with the same size pipe
upsizing without trenching
being conducted while the pipeline remains operational
Pipe characteristics may include:
size
shape
material
joint type
depth
grade
rake condition
service off takes
on-line structures
Monitoring of replacement may include:
sounder
beacon
hand wired guidance system
magnetometry
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for undertaking on-line replacement for existing pipeline systems
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of at least two different on-line replacements for existing pipeline systems
working with others to undertake and complete the undertaking on-line replacement for existing pipeline systems that meets all of the required outcomes
consistent timely completion of on-line replacement for existing pipeline systems that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the on-line replacement for existing pipeline systems
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for undertaking on-line replacement for existing pipeline systems
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of at least two different on-line replacements for existing pipeline systems
working with others to undertake and complete the undertaking on-line replacement for existing pipeline systems that meets all of the required outcomes
consistent timely completion of on-line replacement for existing pipeline systems that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the on-line replacement for existing pipeline systems
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2132 | BCCTT3004B | Undertake on-line replacement for existing pipeline systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH184 | RIICTT304D | Undertake on-line replacement for existing pipeline systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W680 | RII31609 | Certificate III in Trenchless Technology | Qualification |