Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Lay ESI electrical cables

Lay ESI electrical cables

Unit of competency
National Code
UETTDRCJ21
State Code
OBI40
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/09/2019
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
04/12/2019
Nominal Hours
18
Description
This unit involves the skills and knowledge required to lay electrical supply industry (ESI) electrical cables.It includes the direct laying of cables in trenches, on trays/racks, in troughs and/or in conduit or ducts. It also includes cable pulling methods, pulling tensions, minimum bending radii, reduction of frictional forces, use of supporting plant (e.g. dynamometers, rigging and winches), working on fire rated cable (FRC), polyvinyl chloride (PVC), air conditioning (A/C) ducted systems and using plant and equipment for laying and sealing ESI electrical cables.The application of the skills and knowledge described in this unit may require a licence to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to lay ESI electrical cables
  • 1.1 Work schedules, plans, drawings, workplace procedures and material lists are received and confirmed
  • 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
  • 1.3 Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the laying of electrical cables are obtained and confirmed for the purposes of the work to be performed
  • 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  • 1.5 WHS/OHS and environmental hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures
  • 1.6 Relevant permits are confirmed and signed in accordance with workplace procedures
  • 1.7 Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  • 1.8 Work site is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  • 1.9 Traffic management plan is confirmed as being applied in accordance with workplace procedures
2 Carry out the laying of ESI electrical cables
  • 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures
  • 2.2 Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  • 2.3 Electrical cables are laid and sealed in accordance with workplace procedures
  • 2.4 Unplanned events are responded to in accordance with workplace procedures
  • 2.5 Quality checks of work are undertaken in accordance with workplace procedures
3 Complete laying of ESI electrical cables
  • 3.1 Completed work is checked against work plan, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
  • 3.2 WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  • 3.3 Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  • 3.4 Tools, equipment and surplus resources are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  • 3.5 Relevant work permits are signed off in accordance with workplace procedures
  • 3.6 Work records, reports and/or documentation are completed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WD600 UETTDRCJ21A Lay ESI electrical cables Unit of competency
Replaced By
State Code National Code Title Type
ODN03 UETDRDU016 Lay power cables Unit of competency