Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Read dials and indicators

Read dials and indicators

Unit of competency
National Code
PMAOPS101B
State Code
C7819
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/11/2002
State Implementation and Classification
Approved Date
13/04/2010
Field of Education
030717 - Plant And Machine Operations
Original Release Date
13/04/2010
Nominal Hours
15
Description
This competency covers making (or taking) readings/measurements in a variety of sites and locations, using common types of plant instrumentation. This competency unit also covers recording measurement results. This would typically be in a format according to procedures, with the appropriate level of detail included in all reports.In a typical scenario an operator patrols the plant taking a range of readings to complete logs and check on the operation of the plant. The operator needs to interpret the display on the instrument and record the appropriate reading. As part of this process, they check that the instrument is within calibration (where appropriate) and make a judgement as to whether the reading is 'reasonable' or whether some action needs to be taken.PrerequisitesThis unit has no prerequisites.This competency covers making (or taking) readings/measurements in a variety of sites and locations, using common types of plant instrumentation. This competency unit also covers recording measurement results. This would typically be in a format according to procedures, with the appropriate level of detail included in all reports.In a typical scenario an operator patrols the plant taking a range of readings to complete logs and check on the operation of the plant. The operator needs to interpret the display on the instrument and record the appropriate reading. As part of this process, they check that the instrument is within calibration (where appropriate) and make a judgement as to whether the reading is 'reasonable' or whether some action needs to be taken.PrerequisitesThis unit has no prerequisites.
Notes
Elements and Performance Criteria
1 Contribute to controlling hazards in work area
  • 1.1 Identify hazards in work area.
  • 1.2 Take appropriate action to control risks according to procedures.
2 Identify appropriate measuring device readings
  • 2.1 Explain the need for calibration and where appropriate, confirm the calibration of the measuring device.
  • 2.2 Select appropriate units on the measuring device.
  • 2.3 Select appropriate scale(s) on the measuring device.
3 Perform measurements
  • 3.1 Identify the range of results that could be obtained.
  • 3.2 Identify and take account of relevant external factors.
  • 3.3 Perform measurements using appropriate techniques.
  • 3.4 Identify measurements outside the range of expected results.
  • 3.5 Take action on measurements outside expected range according to procedures.
4 Record results
  • 4.1 Record readings accurately in the appropriate format.
  • 4.2 Record the results to the appropriate level of detail.
Context
Typical dials and indicators include (select relevant items):
analog dials:
pressure gauge
rev counter
temperature dial
digital readouts:
pH meter
temperature probe
ammeter
flow meter
weigh scales.

Calibration checks could include:
checking the date that the next calibration is required (e.g. weigh scale, pressure gauge)
using a calibration button on the instrument (e.g. zero button on an ammeter, calibration button on an electronic meter).

Resolution of equipment problems or non-conforming measurements/readings is restricted to responding in a routine, predetermined manner as specified in the procedures for your plant. All operations are performed to procedures.

Readings may need to be made at heights, in wet or restricted conditions, or close to hot or moving equipment.

Taking action may be reporting.

HSE
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and HSE requirements, the HSE requirements take precedence.
Assessment context and methods
Assessment for this unit of competency will be on an operating plant. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.

Simulation or case study/scenarios may be required to allow for timely assessment of parts of this competency unit (e.g. those parts of element 2 referring to out of range readings). Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.

Critical aspects
Competence must be demonstrated in the ability to recognise situations requiring action and then in implementing appropriate corrective action. While it is not expected that the operator will understand the full implications of readings outside the normal range, there should be awareness of the safety implications and the appropriate priority for response for such readings.

Consistent performance should be demonstrated. In particular look to see that:
readings which are out of range or unusual/unexpected signs of problems or potential problems with the equipment/processes are recognised
appropriate action is taken in a timely manner
hazards are recognised and appropriate action is taken to control risks arising from such hazards.

These aspects may be best assessed using a range of scenarios/case studies/what ifs as the stimulus, with a walk-through forming part of the response. The assessment activities should include responding to a range of problems.

Resource implications
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.

Other assessment advice
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.

It may be appropriate to assess this unit concurrently with:
PMAOHS100B - Follow OHS procedures.

Essential knowledge
Demonstration of competence in this unit must include knowledge of the following:
basic units of measurement
measuring devices, including gauges, dip-sticks, thermometers and the like
graphs and scales
procedures related to this competency
typical problems with measuring equipment applicable to this competency
procedures for reporting or dealing with typical equipment problems and threats to safety.
Replaces
State Code National Code Title Type
C5933 PMAOPS101A Read dials and indicators Unit of competency
Replaced By
State Code National Code Title Type
W8838 PMAOPS101C Read dials and indicators Unit of competency