Unit of competency Outline

Date retreived
22/07/2026 6:03 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate injection blow moulding equipment

Operate injection blow moulding equipment

Unit of competency
National Code
PMBPROD270B
State Code
W7596
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
31/01/2011
State Implementation and Classification
Approved Date
31/07/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
31/07/2014
Nominal Hours
70
Description
This competency covers the operation of injection blow moulding equipment and the resolving of routine problems to procedure.This competency is typically performed by operators working either independently or as part of a work team.
Notes
Elements and Performance Criteria
1. Check work requirements.
  • 1.1 Identify work requirements from procedures.
  • 1.2 Identify product, materials and equipment requirements for job(s).
  • 1.3 Recognise hazards and take appropriate action.
  • 1.4 Check with supervisor/appropriate person if requirements are not in accordance with usual practice.
2. Conduct pre-start checks as required.
  • 2.1 Check safety gates and guards are in position and working.
  • 2.2 Check raw materials are correct.
  • 2.3 Undertake other pre-start checks to procedures.
  • 2.4 Start up equipment safely and 'dry run' to warm hydraulics and components to operating temperature before production, as required.
3. Operate equipment to procedures.
  • 3.1 Check condition of equipment and introduce raw materials as required.
  • 3.2 Check product/process is within required limits.
  • 3.3 Collect products and store as required.
  • 3.4 Check product is in specification/to required quality standard.
  • 3.5 Maintain supply of material(s) as required.
  • 3.6 Complete logs and records when required.
  • 3.7 Collect and reprocess/discard scrap/trim and other materials.
  • 3.8 Clean up equipment and work area.
  • 3.9 Pause equipment, or stop equipment in an emergency, as required.
4. Respond to routine problems to procedures.
  • 4.1 Recognise known faults that occur during the operation.
  • 4.2 Identify and take action on causes of routine faults.
  • 4.3 Log problems as required.
  • 4.4 Identify non-routine process and quality problems and take appropriate action.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This competency applies to all injection blow moulding operations within the plastics and rubber sectors. It includes the operation of all relevant additional equipment where that equipment is integral to the injection blow moulding process.
Procedures
All operations are performed in accordance with procedures.
Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards.
Tools and equipment
This competency includes use of equipment and tools such as:
electrical, pneumatic, mechanical, electromechanical and hydraulic injection blow moulding machines and components such as base, frame, feed hoppers and material supply mechanisms, barrel and screw plastification unit, injection blow units, die/ mould tool additional equipment, including chillers/cooling towers, die heating equipment, hopper driers, mixing hoppers, dehumidifying driers, air compressors, dosing machines, colour blending equipment and conveyors
hand tools used in the injection blow moulding process
material loading equipment used for loading of raw materials
relevant personal protective equipment.
Hazards
Typical hazards include:
spills
dusts/vapours
slip and fall, particularly due to spilt granules
temperature
hazardous substances
moving equipment
manual handling hazards.
Problems
'Respond to routine problems' means 'apply known solutions to a limited range of predictable problems'. Typical process and product problems may include:
equipment malfunction
variations in temperature, pressure, speed, inflation
variations in materials or contamination of materials
mould damage
routine injection blow moulding faults - wall thinning, holes, poor surface finish, warping, poor colour dispersion, ejection damage, colour contamination, black spots and other defects
mould/tooling problems.
Variables
Key variables to be monitored include:
operating temperatures
speed
cycle time
output rate
concentration or dispersion of colour
product weight
product wall thickness
product integrity and general conformance to specification/sample.
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, required skills and knowledge, the Range Statement and the Assessment Guidelines for this Training Package.
Overview of assessment
A holistic approach should be taken to the assessment.
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria and skills and knowledge.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that competence is demonstrated in the knowledge and skills defined in this unit. These may include the ability to:
recognise the importance of material properties and qualities
apply approved procedures
take appropriate action to resolve faults or report faults to appropriate personnel
explain and implement emergency shutdown procedures.
Consistent performance should be demonstrated. For example, look to see that:
injection blow moulding production standards are met consistently upstream and downstream communication is timely and effective operating procedures and work instructions are read and interpreted correctly
problems are identified and appropriate action is taken (ie the problem is fixed or reported)
all safety procedures are followed.
Assessment method and context
Assessment will occur on industrial blow moulding equipment in a work-like environment.
Competence in this unit may be assessed:
by using an appropriate, industrial injection blow moulding machine requiring demonstration of operation and emergency stop procedures
in a situation allowing for the generation of evidence of the ability to respond to problems
by using a suitable simulation and/or a range of case studies/scenarios
through a combination of these techniques.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess the underpinning knowledge and theoretical assessment will be combined with appropriate practical/simulation or similar assessment. Assessors need to be aware of any cultural issues that may affect responses to questions.
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Specific resources for assessment
This section should be read in conjunction with the Range Statement for this unit of competency. Resources required include suitable access to an operating plant or equipment that allows for appropriate and realistic simulation. A bank of case studies/scenarios and questions will also be required to the extent that they form part of the assessment method. Questioning may take place either in the workplace, or in an adjacent, quiet facility such as an office or lunchroom. No other special resources are required.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Replaces
State Code National Code Title Type
C5636 PMBPROD270A Operate injection blow moulding equipment Unit of competency
Replaced By
State Code National Code Title Type
BAJ00 PMBPROD270 Operate injection blow moulding equipment Unit of competency