Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Modify complex electrical equipment

Modify complex electrical equipment

Unit of competency
National Code
UEPMNT412
State Code
OAH82
TGA Status
Current
DTWD Status
Pending
Current Release Number
2.00
Current Release Date
20/04/2022
State Implementation and Classification
Approved Date
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
Nominal Hours
Description
This unit involves the skills and knowledge required to undertake modifications of complex and High Voltage (H.V.) electrical equipment; this may include but is not limited to alterations, additions or adjustments.Modifications are any changes to complex electrical equipment which may alter it from the manufacturers' specification, it can include alterations, additions or adjustments to complex and High Voltage (H.V.) electrical equipment to ensure they meet operational requirements.Competency in this unit requires the ability to plan work, carry out complex electrical equipment modifications and to report on all completed work tasks. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or onsite. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Plan and prepare for work
  • 1.1 Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures
  • 1.2 Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) standards, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  • 1.3 Resources are obtained and inspected for compliance with job specification
  • 1.4 Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  • 1.5 Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
  • 1.6 Work is planned, sequenced and prioritised, in accordance with workplace procedures
  • 1.7 Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
  • 1.8 Work area is prepared, in accordance with workplace procedures
2 Carry out modifications
  • 2.1 Isolations are confirmed, where appropriate, in accordance with workplace procedures
  • 2.2 Complex electrical equipment is modified, in accordance with workplace procedures, plans, drawings and manuals
  • 2.3 Modifications are completed, in accordance with workplace procedures, without loss or damage to equipment
  • 2.4 Modified equipment is set up, in accordance with workplace procedures and manufacturers' specifications
  • 2.5 Final inspection is performed, in accordance with workplace procedures
3 Complete work
  • 3.1 Work is completed and appropriate personnel are notified, in accordance with workplace procedures
  • 3.2 Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  • 3.3 Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
  • 3.4 Work completion details are finalised, in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WE272 UEPMNT412B Modify complex electrical equipment Unit of competency