Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct and install irrigation delivery and stormwater drainage assets

Construct and install irrigation delivery and stormwater drainage assets

Unit of competency
National Code
NWP252B
State Code
D1867
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
14/01/2009
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
14/01/2009
Nominal Hours
30
Description
This unit of competency describes the outcomes required to construct irrigation delivery or stormwater drainage assets on site and to install both constructed assets and prefabricated components.
Notes
Elements and Performance Criteria
1Plan and prepare for work.
  • 1.1 Determine work requirements from specifications and instructions.
  • 1.2 Select, fit and use personal protective equipment.
  • 1.3 Perform site check to identify hazards and prevent damage to other utilities according to legislative and organisational requirements.
  • 1.4 Provide appropriate drainage and diversion from work site without damage to environment.
  • 1.5 Check equipment and excavation methods to meet safety requirements of task and site.
2Construct and install drains, channels, pipes and associated fittings.
  • 2.1 Provide bedding and foundations according to structure type, location and specification.
  • 2.2 Select, lay and install join pipes and fittings according to manufacturer and organisational requirements.
  • 2.3 Select, place and join prefabricated components according to manufacturer and organisational requirements.
  • 2.4 Check installed pipes, fittings and prefabricated components to ensure that test specifications are met.
  • 2.5 Construct cast in situ components according to specifications and organisational requirements.
3Finalise work.
  • 3.1 Check constructions and installations to ensure that specifications are met.
  • 3.2 Check, maintain and store equipment, tools and materials according to manufacturer guidelines and organisational procedures.
  • 3.3 Backfill, compact and restore work site to meet environmental and organisational requirements.
  • 3.4 Maintain workplace records as required.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Work requirements may include:
extent and scope of work
work site boundaries
utilities location
risk assessment and prevention measures
signage
traffic control
Legislative and organisational requirements may include:
relevant federal and state or territory legislation and regulations
codes of practice, associated standards and guidance material
documented organisational policies, manuals and induction programs
relevant community planning and development agreements, such as land care agreements
Equipment used may include:
hand and power tools
on- and off-road vehicles
lifting and winching equipment
mechanical excavation equipment
compressors
pneumatic spaders and attachments
motorised cutting equipment
chemical spraying apparatus
small marine craft
trenching systems
portable pumps
communication equipment
breathing apparatus
gas detection equipment
rescue equipment
appropriate personal protective equipment
Structures may include:
drop structures
regulators
erosion barriers
head walls
concrete channels
Pipes may include:
vitrified clay
polyvinyl chloride (PVC)
polyethylene
reinforced concrete
Fittings may include:
jointing systems for pipe types and prefabricated sections, e.g. gibault and tension bands
tension bands
solvent cement joints
compression rings
bolted flanges
malleable jointing materials
electrofusion
butt welding
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to construct and install irrigation delivery or stormwater drainage assets by:
planning work and preparing work site according to given specifications and instructions
constructing assets according to specifications
installing assets according to specifications
checking that work meets specifications
cleaning and storing equipment
restoring work site
completing documentation
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence only taken at the point when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
State Code National Code Title Type
M1876 NWP252A Construct and install irrigation and/or stormwater drainage assets Unit of competency
Replaced By
State Code National Code Title Type
AVZ06 NWPIRR013 Construct and install irrigation delivery and stormwater drainage assets Unit of competency
State Code National Code Title Type
J155 AHC21112 Certificate II in Irrigation Qualification
D244 NWP20107 Certificate II in Water Operations Qualification