Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and test renewable energy system for ICT networks

Install and test renewable energy system for ICT networks

Unit of competency
National Code
ICTSUS401
State Code
AWD79
TGA Status
Deleted
DTWD Status
Transition (Deleted)
Current Release Number
1.00
Current Release Date
14/01/2016
State Implementation and Classification
Approved Date
05/07/2016
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
05/07/2016
Nominal Hours
55
Description
This unit describes the skills and knowledge required to install a renewable energy system and integrate it into an information and communications technology (ICT) network.It applies to individuals in the ICT industry who operate with a degree of autonomy, but who may also supervise the work of others when necessary.The specialised nature of the role focuses on meeting sustainability targets using renewable energy solutions and resulting in more economical systems.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan to install renewable energy system
  • 1.1 Prepare for work according to relevant legislation, codes, regulations and standards
  • 1.2 Arrange access to site according to required procedure
  • 1.3 Assess extent of system implementation using feasibility report and organisational guidelines
  • 1.4 Produce report to meet client and organisational requirements
  • 1.5 Liaise with appropriate person to obtain approval for plans with recommendations
  • 1.6 Determine and source renewable energy components according to agreed plan
2. Install and test renewable energy system
  • 2.1 Install and configure components according to work health and safety (WHS) and environmental requirements, plan, and manufacturer’s and organisational requirements
  • 2.2 Identify and resolve problems
  • 2.3 Integrate renewable system into network
  • 2.4 Test and enhance system performance to meet organisational requirements
3. Complete documentation and clean up worksite
  • 3.1 Produce evaluation report on actual cost and benefits of implementing renewable energy system to organisation
  • 3.2 Provide support manual for client
  • 3.3 Record all test results and records for client
  • 3.4 Notify client and obtain sign off
No information
No information
Replaces
State Code National Code Title Type
D3419 ICTSUS4183A Install and test renewable energy system for ICT networks Unit of competency