Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct commissioning and post commissioning activities

Conduct commissioning and post commissioning activities

Unit of competency
National Code
NWP527B
State Code
D1975
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
06/11/2014
Field of Education
080301 - Business Management
Original Release Date
06/11/2014
Nominal Hours
120
Description
This unit of competency describes the outcomes required to plan and manage the commissioning and post-commissioning activities associated with asset construction.
Notes
Elements and Performance Criteria
1Plan for commissioning activities.
  • 1.1 Access and interpret organisational and/or contractual requirements and documentation for the post-construction commissioning of assets.
  • 1.2 Develop a specified acceptance program according to organisational requirements.
  • 1.3 As required, secure authorisation of the commissioning process from appropriate personnel.
  • 1.4 Negotiate and communicate commissioning activities, process and schedule with relevant stakeholders.
2Conduct commissioning activities.
  • 2.1 Schedule and conduct the defined commissioning program.
  • 2.2 Conduct site inspections according to commissioning requirements.
  • 2.3 Undertake a review of the construction or installation planning.
3Conduct post-commissioning activities.
  • 3.1 Monitor and record asset performance according to organisational standards.
  • 3.2 Identify defects and make arrangements to rectify them in accordance with standard organisational procedures and/or contract requirements.
  • 3.3 Record required operational or maintenance schedules.
  • 3.4 Finalise the asset register/list according to organisational standards.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Documentation may include:
specifications
briefs
drawings
pricing schedules
permits
instruments of agreement
acceptance
general and special conditions of contract
operational manuals
maintenance manuals
as constructed drawings
plans of other authorities
financial plans
project plans
Stakeholders may include:
contractors
government
property owners
utility organisations
customers
general public
asset users
Site inspections may be conducted to confirm:
planning
inspect preparation work
assess compliance with specifications
assess compliance with occupational health and safety requirements
Construction or installation planning may include:
specifications
schedules
phasing and programming
services and facilities
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to plan and manage the commissioning and post-commissioning activities associated with asset construction including:
interpreting complex documentation (contracts, plans, specifications, etc) in order to prepare a commissioning plan and schedule
developing an effective commissioning plan and schedule
undertaking inspections and other commissioning activities to meet organisational requirements and reflect the specifications of the job
undertaking post commissioning activities to organisational standard
managing the processes for addressing defects
reporting outcomes effectively and to organisational standard
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Replaced By
State Code National Code Title Type
AVY63 NWPNET034 Conduct commissioning and post-commissioning activities Unit of competency
State Code National Code Title Type
D247 NWP50107 Diploma of Water Operations Qualification