Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Control corrosion
Control corrosion
Unit of competency
National Code
PMASUP346
PMASUP346
State Code
AXM36
AXM36
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
05/08/2016
Nominal Hours
40
Description
This unit of competency covers the skills and knowledge required to control corrosion in plant, equipment and/or pipelines (plant) by the use of chemical or biological controls.This unit of competency applies to operators who are required to monitor plant for signs of corrosion, monitor the concentration of inhibiting chemicals or similar, and maintain an appropriate dosing regime in order to control the rate of corrosion.This unit of competency applies to an individual working alone or as part of a team or group and working in liaison with other shift team members and the control room operator, as appropriate.Corrosion typically refers to any electrochemical process leading to the decay of metal. However, this competency may also be contextualised and applied to decay processes in non-metals.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Identify corrosion controls in use
- 1.1 Identify sites susceptible to corrosion on work area
- 1.2 Identify the causes and effects of corrosion at these sites
- 1.3 Identify the corrosion inhibitors used in work area
- 1.4 Determine hazards associated with corrosion and corrosion control
- 1.5 Control hazards associated with corrosion and corrosion control
- 1.6 Coordinate with appropriate personnel
2 Dose corrosion inhibitor in accordance with procedures
- 2.1 Monitor indicators of rate of corrosion
- 2.2 Monitor inhibitor dosing equipment
- 2.3 Adjust rate of dosing
- 2.4 Monitor inhibitor stocks
- 2.5 Recognise situations requiring action
- 2.6 Take action, as required
3 Test plant for corrosion in accordance with procedures
- 3.1 Identify corrosion testing methods used in work area
- 3.2 Complete testing activities as required by procedures
- 3.3 Examine test results and take action
4 Isolate and de-isolate dosing plant
- 4.1 Isolate dosing plant
- 4.2 Make safe for required work
- 4.3 Check dosing plant is ready to be returned to service
- 4.4 De-isolate and prepare dosing plant for return to service
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8949 | PMASUP346A | Control corrosion | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCK66 | PMASUP350 | Control corrosion | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAM8 | PMA30116 | Certificate III in Process Plant Operations | Qualification |
| BAN0 | PMA40116 | Certificate IV in Process Plant Technology | Qualification |