Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor and maintain instrument and control systems
Monitor and maintain instrument and control systems
Unit of competency
National Code
PMASUP341A
PMASUP341A
State Code
C6048
C6048
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
17/02/2006
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
17/02/2006
Nominal Hours
40
Description
Notes
Elements and Performance Criteria
No information
Context
Control systems for one or more of the following may be included:
compressor systems and equipment (compressors, monitoring systems, power supply systems, pumps, pumping systems and equipment, pressure vessels/filtration equipment, coolers, scrubbers, expanders, anti surge systems, safety systems and compressor control systems)
prime movers which may include turbine engines, reciprocating engines, electric motors (fuel and carburettion systems, ignition systems, lubrication systems, induction and exhaust systems, governing systems, power supply systems, safety and shutdown systems)
flow systems (piping systems, metering equipment, flow control equipment, pressure and temperature transmitters and transducers, telemetry equipment, PLCs, flow computers, electro-pneumatic process control equipment and their associated on-line analytical instrumentation such as gas chromatographs, moisture analysers, gas sampling and gas analysis equipment, pig)
valve systems (non-control valves, control and shut off valves, non-return or check valves and pressure relief valves, manual hand operated actuator, gas/hydraulic actuator and pneumatic valves).
Emergency responses include:
leaks/loss of containment
fire
equipment failure
hazards and incidents.
Relevant personnel may include:
supervisors
maintenance personnel
organisation employees
contractors
government bodies.
Types of faults may include:
material leaks
electrical problems
compressor or pump failure
out of current inspection status
gauge failure or hose rupture/leaks
instruments out of calibration
non-flow of material
instruments and equipment requiring cleaning.
Reports may include:
routine inspections (daily readings, monthly checks)
scheduled maintenance activities
mandatory or statutory inspections
hazard and incident reports
quality assurance system requirements/reports.
Instrument/electrical systems may include:
process analysing systems, e.g. gas analysis
emergency shutdown systems
fire systems
pressure and temperature control systems
metering systems, e.g. orifice, turbine, positive displacement
telemetry and SCADA systems
communications systems
solar systems
utility systems.
Test equipment and tools may include:
dead weight tester
transmission unit
ice point tester
decade box
multimeter
RTD calibrator
chart recorders
data logging equipment
hand tools
valves, actuators and flanges.
The use and operation of personal computers, other hardware mediums and associated software is required.
HSE
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and HSE requirements, the HSE requirements take precedence.
Persons are required to have skills in hazard identification, assessment and application of control measures.
Control systems for one or more of the following may be included:
compressor systems and equipment (compressors, monitoring systems, power supply systems, pumps, pumping systems and equipment, pressure vessels/filtration equipment, coolers, scrubbers, expanders, anti surge systems, safety systems and compressor control systems)
prime movers which may include turbine engines, reciprocating engines, electric motors (fuel and carburettion systems, ignition systems, lubrication systems, induction and exhaust systems, governing systems, power supply systems, safety and shutdown systems)
flow systems (piping systems, metering equipment, flow control equipment, pressure and temperature transmitters and transducers, telemetry equipment, PLCs, flow computers, electro-pneumatic process control equipment and their associated on-line analytical instrumentation such as gas chromatographs, moisture analysers, gas sampling and gas analysis equipment, pig)
valve systems (non-control valves, control and shut off valves, non-return or check valves and pressure relief valves, manual hand operated actuator, gas/hydraulic actuator and pneumatic valves).
Emergency responses include:
leaks/loss of containment
fire
equipment failure
hazards and incidents.
Relevant personnel may include:
supervisors
maintenance personnel
organisation employees
contractors
government bodies.
Types of faults may include:
material leaks
electrical problems
compressor or pump failure
out of current inspection status
gauge failure or hose rupture/leaks
instruments out of calibration
non-flow of material
instruments and equipment requiring cleaning.
Reports may include:
routine inspections (daily readings, monthly checks)
scheduled maintenance activities
mandatory or statutory inspections
hazard and incident reports
quality assurance system requirements/reports.
Instrument/electrical systems may include:
process analysing systems, e.g. gas analysis
emergency shutdown systems
fire systems
pressure and temperature control systems
metering systems, e.g. orifice, turbine, positive displacement
telemetry and SCADA systems
communications systems
solar systems
utility systems.
Test equipment and tools may include:
dead weight tester
transmission unit
ice point tester
decade box
multimeter
RTD calibrator
chart recorders
data logging equipment
hand tools
valves, actuators and flanges.
The use and operation of personal computers, other hardware mediums and associated software is required.
HSE
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and HSE requirements, the HSE requirements take precedence.
Persons are required to have skills in hazard identification, assessment and application of control measures.
Assessment context and methods
Assessment for this unit of competency will be on an operating plant. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation may be required to allow for timely assessment of this unit of competency. Simulation should be based on the actual plant and will include walk throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.
Critical aspects
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
early warning signs of equipment/processes needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.
Also confirm that the person undertaking this competency has the ability to:
implement all occupational health, safety and environmental procedures relevant to this unit
apply the permit to work system within the context of this unit
interpret a range of process and control system drawings and schematics in order to undertake required or identified repairs/modifications to electrical systems.
These aspects may be best assessed using a range of scenarios/case studies/what ifs as the stimulus with a walk through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Resource implications
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Other assessment advice
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with relevant OPS units.
In a major hazard facility, it may be appropriate to assess this unit concurrently with:
PMAOHS100A Follow - OHS procedures.
Essential knowledge
A demonstrated working knowledge and application of the company's specific work organisations and workflow would be highly regarded.
A person undertaking this unit must be able to demonstrate a knowledge of and application for test equipment typically used with control system repair/maintenance/calibration.
A person undertaking this unit of competency would also be expected to demonstrate the knowledge and ability to:
test, repair, recommission and monitor the operational condition of instrument control systems utilised within the industry
communicate and report the operational condition and history of instrument control systems to other team members and company personnel
co-ordinate own work and the work of others including on site contractors/operators.
It is essential that a person be able to apply the underlying skills and knowledge contained within this competency across a range of instrument and control systems.
Assessment for this unit of competency will be on an operating plant. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation may be required to allow for timely assessment of this unit of competency. Simulation should be based on the actual plant and will include walk throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.
Critical aspects
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
early warning signs of equipment/processes needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.
Also confirm that the person undertaking this competency has the ability to:
implement all occupational health, safety and environmental procedures relevant to this unit
apply the permit to work system within the context of this unit
interpret a range of process and control system drawings and schematics in order to undertake required or identified repairs/modifications to electrical systems.
These aspects may be best assessed using a range of scenarios/case studies/what ifs as the stimulus with a walk through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Resource implications
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Other assessment advice
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with relevant OPS units.
In a major hazard facility, it may be appropriate to assess this unit concurrently with:
PMAOHS100A Follow - OHS procedures.
Essential knowledge
A demonstrated working knowledge and application of the company's specific work organisations and workflow would be highly regarded.
A person undertaking this unit must be able to demonstrate a knowledge of and application for test equipment typically used with control system repair/maintenance/calibration.
A person undertaking this unit of competency would also be expected to demonstrate the knowledge and ability to:
test, repair, recommission and monitor the operational condition of instrument control systems utilised within the industry
communicate and report the operational condition and history of instrument control systems to other team members and company personnel
co-ordinate own work and the work of others including on site contractors/operators.
It is essential that a person be able to apply the underlying skills and knowledge contained within this competency across a range of instrument and control systems.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8944 | PMASUP341B | Monitor and maintain instrument and control systems | Unit of competency |