Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage a power generation system startup

Manage a power generation system startup

Unit of competency
National Code
PPMEPG320
State Code
AXF42
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
24/10/2018
State Implementation and Classification
Approved Date
25/08/2016
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
25/08/2016
Nominal Hours
50
Description
This unit of competency describes the skills and knowledge required to conduct pre-operational checks and bring a power generation system online.The unit applies to production operators and technicians who manage power generation system startups, in a pulp or paper manufacturing facility. This typically involves working in a facility with complex integrated equipment and continuous operations.No licensing, legislative or certification requirements apply to this unit at the time of publication. Where the turbine equipment falls under the category for which a High Risk Work Licence is required, this unit should not be used and the appropriate unit should be sought.
Notes
Elements and Performance Criteria
1. Prepare system for operation
  • 1.1 Identify production requirements to plan power generation levels
  • 1.2 Determine power generation requirements in conjunction with power authorities
  • 1.3 Determine sequencing for plant startup to suit current circumstances
  • 1.4 Conduct system inspections and pre-startup safety checks in line with regulatory requirements, organisational safety and standard operating procedures (SOP)
  • 1.5 Confirm plant status by observation and inspection
  • 1.6 Complete routine maintenance to ensure optimum system performance
  • 1.7 Select, fit, use and maintain personal protective equipment according to job requirements and task to be undertaken
2. Initiate system startup
  • 2.1 Commence sequence for plant startup in line with work health and safety and SOP
  • 2.2 Coordinate generation system start with distribution and ancillary systems and bring on-line
  • 2.3 Observe system or plant for correct operational response
  • 2.4 Detect deviations from operational specifications and rectify or report
  • 2.5 Record system startup and power generation data in operating log
No information
No information
Replaces
State Code National Code Title Type
AUY08 FPPEPG320A Manage a power generation system startup Unit of competency
Replaced By
State Code National Code Title Type
ODT58 PPMEPG301 Perform power generation operations Unit of competency