Unit of competency Outline

Date retreived
22/07/2026 9:57 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Lay swimming pool and spa coping

Lay swimming pool and spa coping

Unit of competency
National Code
CPCSPS4010
State Code
OCM11
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
23/12/2020
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040309 - Bricklaying And Stonemasonry
Original Release Date
01/06/2021
Nominal Hours
35
Description
This unit specifies the skills and knowledge required to lay different types of coping finishes to swimming pools and spas.This unit reflects the role of those who are responsible for the laying and finishing of coping to variously shaped swimming pools and spas. It applies in a range of contexts:private swimming poolspublic swimming pools, including:hydrotherapy and therapeutic exercise poolswading and receiving pools associated with water slideswave pools.This unit is suitable for those using specialised knowledge to complete routine and non-routine tasks, and their own judgement to deal with predictable and sometimes unpredictable problems.No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan to lay swimming pool and spa coping.
  • 1.1 Access, read and interpret relevant swimming pools and spas coping information from plans, specifications, codes and standards.
  • 1.2 Interpret and apply work health and safety and environmental requirements.
  • 1.3 Confirm type of material, pattern and finish for swimming pool and spa coping.
  • 1.4 Calculate specified coping and material quantities.
  • 1.5 Determine job priorities and sequence job tasks and timelines in consultation with others on site.
  • 1.6 Schedule delivery of material and required plant and equipment.
2 Prepare for the coping work.
  • 2.1 Select, fit and use personal protective equipment appropriate to activity.
  • 2.2 Check materials for damage, quality and compliance with work specifications.
  • 2.3 Check plant and equipment for serviceability.
  • 2.4 Prepare surfaces for coping as specified and stated in manufacturer requirements.
3 Lay coping.
  • 3.1 Set out finished height, width, levels, falls and pattern for coping.
  • 3.2 Mix and apply adhesives or cement as stated in manufacturer specifications.
  • 3.3 Lay coping to ensure colours are blended, overhang into pool and spa is
  • 3.4 Install expansion joints to comply with standards and manufacturer recommendations.
  • 3.5 Clean coping surface using recommended products and apply sealants as specified.
4 Clean up site.
  • 4.1 Clear the work area and reuse, recycle or dispose of materials in accordance with workplace and environmental requirements.
  • 4.2 Clean tools and equipment, check for serviceability, report any damage or faults and store and secure.
No information
No information
No information
State Code National Code Title Type
BGC9 CPC40820 Certificate IV in Swimming Pool and Spa Building Qualification