Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install polyethylene plastic pressure pipelines
Install polyethylene plastic pressure pipelines
Unit of competency
National Code
PMBWELD305B
PMBWELD305B
State Code
W7714
W7714
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
Field of Education
030305 - Materials Engineering
Original Release Date
Nominal Hours
20
Description
This competency covers the installing of relevant elements of polyethylene (PE) plastic pressure pipes and pipeline components under industrial conditions in the field.This competency is performed by operators as part of a work team.
Notes
Elements and Performance Criteria
1. Identify PE pipe materials as being suitable for specific pressure applications.
- 1.1 Identify materials as PE grades from national standards, job specifications and work site instructions.
- 1.2 Determine PE materials properties from national standards and material data sheets.
- 1.3 Identify job needs from worksite instructions and specifications.
2. Identify applications for alternative jointing technologies.
- 2.1 Identify properties and limitations of mechanical jointing systems.
- 2.2 Identify properties and limitations of thermal welding jointing systems.
- 2.3 Perform trial jointing for all methods, identify non conformance, report, and rectify.
- 2.4 Assess quality against specification requirements.
3. Determine methods for handling, storage, transport and installation of PE pipeline components.
- 3.1 Identify requirements for handling and transport of PE materials.
- 3.2 Determine requirements for long term storage.
- 3.3 Determine requirements for installation, including additional materials.
4. Identify appropriate service connection and repair techniques.
- 4.1 Determine service connection requirements.
- 4.2 Identify alternative service connection methods to meet requirements.
- 4.3 Perform service connection to meet requirements.
- 4.4 Determine repair requirements.
- 4.5 Identify alternative repair options.
- 4.6 Perform repair installation to meet requirements.
5. Assess quality of completed installation by determining appropriate testing and commissioning procedures.
- 5.1 Determine specific installation test requirements.
- 5.2 Identify alternative test procedures to meet requirements.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Where reference is made to industry codes of practice and/or Australian/international standards, the latest version must be used.
Context
This competency unit includes the installation of relevant elements of polyethylene (PE) pressure pipeline components. The end applications include pipelines used for transmission of gaseous and water based fluids.
It also includes the operation of alternative jointing procedures, service connections repairs using all relevant ancillary equipment.
Specifications include national standards for materials (AS/NZS 4129, AS/NZS 4130, AS/NZS 2566 and AS/NZS 2033), workplace specifications and instructions, and government codes and regulations.
Procedures
All operations are performed in accordance with procedures.
Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards. These may include:
AS/NZS 4129
AS/NZS 4130
AS/NZS 2566
AS/NZS 2033.
Tools and equipment
This competency includes use of equipment and tools such as:
mechanical and thermal jointing equipment, ancillary jigs and fixtures.
measurement devices, including pressure gauges, times, temperature probes, calipers and computer based monitors
calculators
service connection and repair equipment and products
relevant safety equipment
comprehensive work instructions.
Hazards
Typical hazards include:
hazardous cleaning fluids
pipe material handling
heavy stationary and moving machinery
cutting and heating components.
Problems
'Anticipate and solve problems' means resolve a wide range of routine and non-routine problems, using product and process knowledge to develop solutions to problems which do not have a known solution/a solution recorded in the procedures.
Typical process and product problems may include:
variable PE materials, and pipes and components as supplied
equipment malfunction or wear and tear
variable field site conditions
limitations in available data on specific job requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Where reference is made to industry codes of practice and/or Australian/international standards, the latest version must be used.
Context
This competency unit includes the installation of relevant elements of polyethylene (PE) pressure pipeline components. The end applications include pipelines used for transmission of gaseous and water based fluids.
It also includes the operation of alternative jointing procedures, service connections repairs using all relevant ancillary equipment.
Specifications include national standards for materials (AS/NZS 4129, AS/NZS 4130, AS/NZS 2566 and AS/NZS 2033), workplace specifications and instructions, and government codes and regulations.
Procedures
All operations are performed in accordance with procedures.
Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards. These may include:
AS/NZS 4129
AS/NZS 4130
AS/NZS 2566
AS/NZS 2033.
Tools and equipment
This competency includes use of equipment and tools such as:
mechanical and thermal jointing equipment, ancillary jigs and fixtures.
measurement devices, including pressure gauges, times, temperature probes, calipers and computer based monitors
calculators
service connection and repair equipment and products
relevant safety equipment
comprehensive work instructions.
Hazards
Typical hazards include:
hazardous cleaning fluids
pipe material handling
heavy stationary and moving machinery
cutting and heating components.
Problems
'Anticipate and solve problems' means resolve a wide range of routine and non-routine problems, using product and process knowledge to develop solutions to problems which do not have a known solution/a solution recorded in the procedures.
Typical process and product problems may include:
variable PE materials, and pipes and components as supplied
equipment malfunction or wear and tear
variable field site conditions
limitations in available data on specific job requirements.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the assessment guidelines for this training package.
Overview of assessment
A holistic approach should be taken to the assessment.
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria and skills and knowledge.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the installation meets the requirements of the standard.
Assessment method and context
Assessment will occur using industrial PE pipes and installation equipment and will be undertaken in a work-like environment.
Competence in this unit may be assessed:
using an appropriate, industrial equipment, situations and polymers
in a situation allowing for the generation of evidence of the ability to recognise, anticipate and respond to problems
by using a suitable simulation and/or a range of case studies/scenarios
through a combination of these techniques.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess the underpinning knowledge and theoretical assessment will be combined with appropriate practical/simulation or similar assessment. Assessors need to be aware of any cultural issues that may affect responses to questions.
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Specific resources for assessment
This section should be read in conjunction with the Range Statement for this unit of competency. Resources required include suitable access to an operating plant or equipment that allows for appropriate and realistic simulation. A bank of case studies/scenarios and questions will also be required to the extent that they form part of the assessment method. Questioning may take place either in the workplace, or in an adjacent, quiet facility such as an office or lunchroom. No other special resources are required.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Overview of assessment
A holistic approach should be taken to the assessment.
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria and skills and knowledge.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the installation meets the requirements of the standard.
Assessment method and context
Assessment will occur using industrial PE pipes and installation equipment and will be undertaken in a work-like environment.
Competence in this unit may be assessed:
using an appropriate, industrial equipment, situations and polymers
in a situation allowing for the generation of evidence of the ability to recognise, anticipate and respond to problems
by using a suitable simulation and/or a range of case studies/scenarios
through a combination of these techniques.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess the underpinning knowledge and theoretical assessment will be combined with appropriate practical/simulation or similar assessment. Assessors need to be aware of any cultural issues that may affect responses to questions.
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Specific resources for assessment
This section should be read in conjunction with the Range Statement for this unit of competency. Resources required include suitable access to an operating plant or equipment that allows for appropriate and realistic simulation. A bank of case studies/scenarios and questions will also be required to the extent that they form part of the assessment method. Questioning may take place either in the workplace, or in an adjacent, quiet facility such as an office or lunchroom. No other special resources are required.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| C5749 | PMBWELD305A | Install polyethylene plastic pressure pipelines | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAH80 | PMBWELD305 | Install polyethylene plastic pressure pipelines | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W400 | PMB30107 | Certificate III in Polymer Processing | Qualification |
| W401 | PMB40107 | Certificate IV in Polymer Technology | Qualification |
| AYW7 | NWP30215 | Certificate III in Water Industry Operations | Qualification |