Unit of competency Outline
Date retreived
22/07/2026 6:36 AM AWST
22/07/2026 6:36 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install mouldings and edge trims to timber flooring
Install mouldings and edge trims to timber flooring
Unit of competency
National Code
MSFFL2028
MSFFL2028
State Code
WI358
WI358
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
20
Description
This unit of competency covers installing timber or metal mouldings and trims to timber and engineered flooring after installation, replacement, sanding and finishing.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare for work
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to fitting and fixing timber and metal mouldings and trims to timber and engineered flooring are verified and complied with
- 1.2 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- 1.3 Finished timber/engineered flooring condition is assessed for suitability for installation of timber and metal mouldings and trims consistent with Australian Standards, industry standards and manufacturer recommendations
- 1.4 Suitable adhesives, mouldings, trims and fixings are selected as required
- 1.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 1.6 Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
2 Set out materials for installation
- 2.1 Timber or metal mouldings and trims are acclimatised according to manufacturer recommendations
- 2.2 Timber or metal mouldings and trims for fixing are organised and used in accordance with relevant safety management requirements
- 2.3 Adhesives and fixings, are prepared for use as required
- 2.4 Working lines and starting point are established
3 Cut mouldings/trims
- 3.1 Instructions and sequence for cutting and fixing are followed
- 3.2 Timber or metal mouldings and trims are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate
- 3.3 The aesthetics of the materials are maximised, where appropriate, matching grains and colours
- 3.4 Timber or metal moulding and trim materials are accurately and clearly marked for cutting
- 3.5 Timber or metal moulding and trim is cut to length and size for final fixing ensuring minimum waste
4 Fix mouldings/trims
- 4.1 Timber or metal mouldings and trims for fixing are organised and used in accordance with relevant safety management requirements
- 4.2 Adhesives, mechanical fixings and accessories are prepared for use as required
- 4.3 Fixing methods and equipment are used following manufacturer recommendations
- 4.4 Skirting boards/mouldings are fitted to perimeter walls allowing for expansion joints
- 4.5 Cover trims and edge strips are fitted/re-fitted to expansion joints and transitions of the timber flooring
- 4.6 Finished job is inspected and any imperfections are rectified following workplace procedures
5 Complete housekeeping
- 5.1 Unused materials are stored or recycled as required
- 5.2 Tools and equipment are cleaned and stored appropriately
- 5.3 Work area is cleaned and rubbish disposed of appropriately
- 5.4 Workplace documentation is completed
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8550 | LMFFL2505A | Install mouldings and edge trims to timber flooring | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAJ78 | MSFFL2044 | Install mouldings and edge trims to timber flooring | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J736 | MSF30813 | Certificate III in Flooring Technology | Qualification |
| J725 | MSF20113 | Certificate II in Furnishing | Qualification |