Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Contribute to construction and building design project finalisation processes
Contribute to construction and building design project finalisation processes
Unit of competency
National Code
CPPBDN5014A
CPPBDN5014A
State Code
WC054
WC054
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
10/08/2012
Field of Education
040303 - Building Construction Management
Original Release Date
10/08/2012
Nominal Hours
60
Description
This unit of competency specifies the outcomes required to finalise small-scale building design projects covered by the Building Code of Australia (BCA), except construction Type A buildings. It also covers supporting the construction process, conducting defect inspections of buildings, and communicating with the builder regarding defects on behalf of the client. It also covers finalising and archiving the design project and reviewing processes and outcomes to inform improved quality assurance.
Notes
Elements and Performance Criteria
1 Provide professional advice and support to clients and contractors during construction
- 1.1 Contractual obligations to act on behalf of client during construction of small-scale building design projects are determined and clarified according to workplace procedures.
- 1.2 Clarification of, and amendments to, construction drawings and specifications are provided to client and contractors according to contractual obligations and workplace procedures.
- 1.3 Advice is provided on sourcing of professionals to support the construction process according to contractual obligations and workplace procedures.
- 1.4 Advice is provided on processes and costings to inform the client during negotiations to vary a contract.
2 Inspect defects on behalf of clients
- 2.1 Buildings are inspected at stages of building completion according to contractual obligations, and defects are identified, discussed with contractors and noted.
- 2.2 Defect resolution strategies are negotiated with contractors and client, and detailed solutions, including costs, are agreed and noted.
- 2.3 Defect resolution is formally documented and processed according to contractual obligations and workplace procedures.
3 Finalise building design projects
- 3.1 Professional support is provided to client and relevant professionals, within limits of competence and legal responsibility, to assist in obtaining certificates of completion for building design projects.
- 3.2 Project documentation is reviewed, issues that arose and agreed solutions are accurately noted, and documentation is processed according to workplace procedures.
- 3.3 Project issues and solutions are discussed with relevant workplace personnel and process improvement strategies are explored.
- 3.4 Project planning, methodologies and quality assurance systems are amended to incorporate agreed process improvement strategies.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Small-scale building design projects:
include buildings covered by the BCA, except construction Type A buildings
may be residential projects, such as:
additions and renovations
heritage restoration
new buildings
may be commercial or industrial projects, such as:
factories
motels
offices
restaurants
retail and service outlets
warehouses.
Professionals may include:
access consultants
building surveyors
certifiers
quantity surveyors.
Stages of building completion may include:
practical completion
final completion or handover
end of defect liability period.
Small-scale building design projects:
include buildings covered by the BCA, except construction Type A buildings
may be residential projects, such as:
additions and renovations
heritage restoration
new buildings
may be commercial or industrial projects, such as:
factories
motels
offices
restaurants
retail and service outlets
warehouses.
Professionals may include:
access consultants
building surveyors
certifiers
quantity surveyors.
Stages of building completion may include:
practical completion
final completion or handover
end of defect liability period.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
provide technical advice and support to clients and contractors according to contractual obligations and workplace procedures
conduct defect inspections and negotiate defect resolutions
finalise project documentation
contribute to building design process improvement strategies.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
access to:
suitable assessment venue and equipment
suitable simulated or real opportunities and resources to demonstrate competence
assessment instruments.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using one or more of the following methods:
written and/or oral assessment of the candidates required knowledge for the unit
observed, documented and/or firsthand testimonial evidence of the candidates
implementation of appropriate procedures and techniques for the safe, effective and efficient achievement of the required outcomes
identification of the relevant information and scope of the work required to meet the required outcomes
identification of viable options and the selection of options that best meet the required outcomes
consistently achieving the required outcomes.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
provide technical advice and support to clients and contractors according to contractual obligations and workplace procedures
conduct defect inspections and negotiate defect resolutions
finalise project documentation
contribute to building design process improvement strategies.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
access to:
suitable assessment venue and equipment
suitable simulated or real opportunities and resources to demonstrate competence
assessment instruments.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using one or more of the following methods:
written and/or oral assessment of the candidates required knowledge for the unit
observed, documented and/or firsthand testimonial evidence of the candidates
implementation of appropriate procedures and techniques for the safe, effective and efficient achievement of the required outcomes
identification of the relevant information and scope of the work required to meet the required outcomes
identification of viable options and the selection of options that best meet the required outcomes
consistently achieving the required outcomes.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXG83 | CPPBDN5014 | Contribute to construction and building design project finalisation processes | Unit of competency |
| OCU39 | CPPBDN5107 | Manage contracts for small-scale building design projects | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D772 | CPP50911 | Diploma of Building Design | Qualification |